| 1 | L1₹12.8 LAccepted-Finance KULLANDI STREET M PALLIPATTI POST METTUR TALUK SALEM DISTRICT 636 458 | METTUR | SALEM | TAMIL NADU | 636458 | L1 | Accepted-Finance Admitted | |
| 2 | L2₹14.1 L+₹1.2 L (9.68%)Accepted-Finance | L2 | Accepted-Finance Admitted | |
| 3 | L3₹15.1 L+₹2.3 L (17.8%)Accepted-Finance | L3 | Accepted-Finance Admitted | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹15.1 L
EMD Value
₹16,000
Closing Date
4 Jan 2023, 3:00 pmClosed
The Block Development Officer VP
Kaveripattinam BDO Office
Krishnagiri District Kaveripattinam Union AGAMT_I 3 Works For CC Pavement and 1 Work For Boys Toilet At Nedugal Panchayat Package No_01
2022_RDTN_275841_1
1083_2022_E1_Dt_24_12_2022
Open Tender
Civil Works - Others
Item Rate
180 days
Kaveripattinam BDO Office
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹16,000
Kaveripattinam BDO Office
11 Jan 2023
28 Dec 2022
4 Jan 2023
28 Dec 2022
4 Jan 2023
28 Dec 2022
28 Dec 2022
Amount
1.Providing Cement Concrete Pavement from Jainur Balappan house to Mariyamman kovil Chinnasamy House H/o Nedungal (200m) Estimate Amount : 6.562 Lakhs
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders And Hard Gravelly Soil As per SS 20b
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Below Ground Level
Provision For Bitumen Pad 15mm Thick
Provision for Name Board charges
2.Providing Cement Concrete Pavement from Nedungal west street Murugesan shop to Magesh house H/o Nedungal (28m)
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders And Hard Gravelly Soil As per SS 20b
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Below Ground Level
Provision For Bitumen Pad 15mm Thick
Provision for Name Board charges
3.Providing Cement Concrete Pavement from Jainur Vellakannan kottai Street Paramasivan house to Arumugam house H/o Nedungal (70m)
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders And Hard Gravelly Soil As per SS 20b
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Below Ground Level
Provision For Bitumen Pad 15mm Thick
Provision for Name Board charges
4.Construction of Boys Toilet at Nedungal Govt High School H/o Nedungal Estimate Amount : 5.30 Lakhs
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications.
Refilling in foundation Basement With Excavation erat in layer of not more then 15cm thick
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. .
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
For Lintel & Roof level Beam
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Finishing the exposed surface of RCC item of work such as slabs beams, sunshade, facia, canopy slab, staircase waist slab etc., with CM 1:3, 10mm thick. etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Paving the floor with Sctrach Proof Ceramic Tiles of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supply and Cost of Steel door , Window, Ventilator
4" PVC pipe 6Ksc
4" PVC Tee
4" PVC Y junction
3" PVC Air pipe
PVC tap 3/4"
PVC Elbow 3/4"
PVC pipe 3/4"
500 liter sintex tank
Wash basin
Urinal
Supply of steel doors of following size including all cost at site etc., complete
Steel Door
Steel Door
Towards fixing of steel doors of following size including all cost at site etc., completeion
Steel Door
Supply of RCC Jolly
Roofing with best quality Tuflon sheet
MS square tube of 25.0x25.0x2.60 mm allround
Provision for Soak pit for septic tank
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Collection and supply of sand filling into the basement including cost and conveyance to the site and all labour charge
Collection and supply of filling the stones in soakpit including cost and conveyance of materials to the work site and all labour charges
Provision for RCC cover slab for inspection chamber
Provision for writing Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Kesavan Contractor
Sivan Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .