Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
18 Sept 2026, 3:00 pm
Yes (up to 3 members)
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
01
19 conditions · 8 needing a document upload
Financial Eligibility Criterion: The tenderer must have minimum average annual contractual turnover of 'V/N' or 'V' whichever is less; where V=Advertised value of the tender in Crores of Rupees. N=Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderer shall submit requisite information as per Annexure-IV, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Financial Eligibility Criteria (For Joint Venture Firm): The JV shall satisfy the requirement of "Financial Eligibility" mentioned at para-1.2 above. The "financial capacity" of the lead member of JV shall not be less than 51% of the financial eligibility criteria mentioned at para-1.2 above. The arithmetic sum of individual "financial capacity" of all the members shall be taken as JV's "financial capacity" to satisfy this requirement. Note:- Contractual payment received by a Member in an earlier JV shall be reckoned only to the extent of the concerned member's share in that JV for the purpose of satisfying compliance of the above mentioned financial eligibility criteria in the tender under consideration.
NOTE:- (a)The Tenderer (s) shall furnish the details as per Annexure VI of tender document:- (i)Maximum value of construction works executed and payment received in any one of the previous three financial years or the current financial year (up to date of inviting tender) for calculating A and. (ii)Existing commitments and balance amount of ongoing works with tenderer as per the prescribed proforma of Railway for statement of all works in progress and also the works which are awarded to tenderer but yet not started up to the date of inviting of tender for calculating B. In case of no works in hand, a 'NIL' statement should be furnished. The submitted details for (i) and (ii) above should be duly verified by Chartered Accountant. Bid Capacity for Joint Venture Firm:- The JV shall satisfy the requirement of "Bid Capacity" requirement mentioned at para-1.3 of NIT. The arithmetic sum of individual "Bid capacity" of all the members shall be taken as JV's "Bid capacity" to satisfy this requirement. (b)In case if a bidder is JV, the tenderer (s) must furnish the details of (i)Maximum value of construction works executed and payment received in any one of the previous three financial years or the current financial year (up to date of inviting tender) by each member of JV for calculating 'A', and (ii)Existing commitment and balance amount of ongoing work with each member of JV either in individual capacity or as a member of other JV as per the prescribed proforma of Railway for statement of all works in progress and also the works which are awarded to each member of JV either in individual capacity or as a member of other JV but yet not started up to the date of inviting of tender for calculating 'B'. In case of no works in hand a 'NIL' statement should be furnished. The submitted details for (i) and (ii) above should be duly verified by Chartered Accountant. (c)Value of a completed work/work in progress/work awarded but yet not started for Member in an earlier JV shall be reckoned only to the extent of the concerned member's share in that JV for the purpose of satisfying his / her compliance to the above mentioned bid capacity in the tender under consideration. (d)The arithmetic sum of individual "bid capacity" of all the members shall be taken as JV's "bid capacity". (e)In case, the tenderer/s failed to submit the above statement along with offer, their/ his offer shall be considered as incomplete and will be Rejected Summarily. (f)The available bid capacity of tenderer shall be assessed based on the details submitted by the tenderer. In case, the available bid capacity is lesser than estimated cost of work put to tender, his offer shall not be considered even if he has been found eligible in other eligibility criteria /tender requirement. NOTE:- Date of inviting tender shall be the date of publishing tender notice on IREPS website.
1.4Credentials if submitted in foreign currency shall be converted into Indian currency i.e., Indian Rupee as under: The conversion rate of US Dollars into Rupees shall be the daily representative exchange rates published by the Reserve Bank of India or entity authorized by RBI to do so for the relevant date or immediately previous date for which rates have been published. Where, relevant date shall be as on the last day of month previous to the one in which tender is invited. In case of any other currency, the same shall first be converted to US Dollars as on the last day of month previous to the one in which tender is invited, and the amount so derived in US Dollars shall be converted into Rupees at the aforesaid rate. The conversion rate of such currencies shall be the daily representative exchange rates published by the International Monetary Fund for the relevant date or immediately previous date for which rates have been published.
Explanation for clause 1 including clause-1.1 to 1.4 - Eligibility Criteria: 1.Substantially completed work means an ongoing work in which payment equal to or more than 90% of the present contract value {excluding the payment made for adjustment of Price Variation (PVC), if any} has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. 2.In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of credentials. 3. If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials. 4.In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work. 5.If a bidder has successfully completed a work as subcontractor and the work experience certificate has been issued for such work to the subcontractor by a Govt. Organization or Public listed company as defined in Note for item-1.1 above, the same shall be considered for the purpose of fulfillment of credentials. 6.In case a work is considered similar in nature for fulfillment of technical credentials, the overall cost including the PVC amount (if paid) of that completed work or substantially completed work, shall be considered and no separate evaluation for each component of that work shall be made to decide eligibility. 7.In case of newly formed partnership firm, the credentials of individual partners from previous propriety firm(s) or dissolved previous partnership firm(s) or split previous partnership firm(s), shall be considered only to the extent of their share in previous entity on the date of dissolution / split and their share in newly formed partnership firm. For example, a partner A had 30% share in previous entity and his share in present partnership firm is 20%. In the present tender under consideration, the credentials of partner A will be considered to the extent of 0.3*0.2*value of the work done in the previous entity. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc.
8.In case of existing partnership firm, if any one or more partners quit the partnership firm, the credentials of remaining partnership firm shall be re-worked out i.e., the quitting partner(s) shall take away his credentials to the extent of his share on the date of quitting the partnership firm (e.g. in a partnership firm of partners A, B & C having share 30%, 30% & 40% respectively and credentials of Rs.10 crore; in case partner C quits the firm, the credentials of this partnership firm shall remain as Rs.6 crore). For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc. 9.In case of existing partnership firm if any new partner(s) joins the firm, without any modification in the name and PAN/TAN No of the firm, the credentials of partnership firm shall get enhanced to the extent of credentials of newly added partner(s) on the same principles as mentioned in item-6 above. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deeds, dissolution/splitting deeds and proof of surrender of PAN No.(s) in case of dissolution of partnership firm etc. 10.Any partner in a partnership firm cannot use or claim his credentials in any other firm without leaving the partnership firm i.e., In a partnership firm of A&B partners, A or B partner cannot use credentials of partnership firm of A&B partners in any other partnership firm or propriety firm without leaving partnership firm of A&B partners. 11.In case a partner in a partnership firm is replaced due to succession as per succession law, the proportion of credentials of the previous partner will be passed on to the successor. 12.If the percentage share among partners of a partnership firm is changed, but the partners remain the same, the credentials of the firm before such modification in the share will continue to be considered for the firm as it is without any change in their value. Further, in case a partner of partnership firm retires without taking away any credentials from the firm, the credentials of partnership firm shall remain the same as it is without any change in their value. 13.In a partnership firm "AB" of A&B partners, in case A also works as propriety firm "P" or partner in some other partnership firm "AX", credentials of A in propriety firm "P" or in other partnership firm "AX" earned after the date of becoming a partner of the firm AB shall not be added in partnership firm "AB". 14.In case a tenderer is LLP, the credentials of tenderer shall be worked out on above lines similar to a partnership firm. 15.In case company 'A' is merged with company 'B', then company 'B' would get the credentials of company 'A' also.
1.1Technical Eligibility Criteria: Technical criterion: The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender. OR Two similar works each costing not less than the amount equal to 40% of advertised value of the tender. OR One similar work costing not less than the amount equal to 60% of advertised value of the tender, Similar nature of work for the purpose of eligibility criteria under 1.1 above shall mean: (i)Execution of 25KV/2x25KV Electrification work OR (ii)Execution of 25KV/2x25KV feeder wire work OR (iii)Execution of 25KV/2x25KV OHE modification work OR (iv)Execution of 25KV/2x25KV OHE up-gradation work OR (v)Execution of 25KV/2x25KV OHE maintenance work OR (vi)Execution of 25KV/2x25KV OHE AMC work OR (vii)Execution of 25KV/2x25KV OHE rehabilitation work OR (viii)Execution of 25KV/2x25KV OHE replacement work i.e. catenary wire/contact wire/feeder wire/ATD/ cantilever assembly OR (ix)Execution of 66 KV or higher voltage overhead Transmission line work OR (x)Execution of 66 KV or higher voltage Sub-Station work. (As per Electrical/HQ Letter no. Elect/SECR/243/tender policy/4362 Dtd:22.03.25) Note for item-1.1:
(i)Substantially completed work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price Variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. (ii)Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Government Organisation, work experience certificate issued by Public Listed Company having average annual turnover of Rs.500 Crore and above in last three financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/ registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed Company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate. Offers submitted by Joint Venture are permitted.
Eligibility criteria for Joint Venture Firms: Technical, financial eligibility and Bid capacity of the JV shall be adjudged based on satisfactory fulfilment of the following criteria: Technical Eligibility Criteria: The technical eligibility for the work as per para 1.1 above, shall be satisfied by either the 'JV in its own name & style' or 'Lead member of the JV'. Each other (non-lead) member(s) of JV, who is/are not satisfying the technical eligibility for the work as per para 1.1 above, shall have technical capacity of minimum 10% of the cost of work i.e., each non- lead member of JV member must have satisfactorily completed or substantially completed during the last 07 (seven) years, ending last day of month previous to the one in which tender is invited, one similar single work for a minimum of 10% of advertised value of the tender. Note:- (i). Value of a completed work done by a Member in an earlier JV shall be reckoned only to the extent of the concerned member's share in that JV for the purpose of satisfying his/her compliance to the above mentioned technical eligibility criteria in the tender under consideration.
5 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Document in support of Financial Eligibility Criteria: The tenderers shall submit requisite information as per Annexure-IV, along with copies of Audited Balance Sheet duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance sheet.
As per format given in Annexure-III & ANNEXURE VI of tender document duly verified by Chartered Accountant.
Certificate as per Annexure-V and V(A) of Tender Document.
Declaration or an undertaking from the tenderer(s) that he is not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which he or JV in which HUF was / is a partner/member. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause-62 of the General Conditions of Contract.
Construction of 02 nos of Long Loop lines in UP grid by extending Over Run Line of existing loop line (at both end i.e. BSP and KTE end) at Tenganmada (TGQ) station Yard.
CPM-ELECT-TGQ-2026-27-04~SECR
CPM-ELECT-TGQ-2026-27-04
Open
Works - General
12 Months
Bilaspur, Chhattisgarh
₹0
₹2.5 L
25 Aug 2026
25 Aug 2026
4 Sept 2026
259 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,24,59,529.56 | ||
| — | 2.50 | — | — | ||
| Preparation of Design and Drawing for OHE (a) Preparation & supply of GAD, Sectioning Diagram, LOP & CSD. | — | — | — | 22,640 | |
| — | 2.50 | — | — | ||
| Preparation of Design and Drawing for OHE (b) Preparation & supply of S E D & as erected drawing | — | — | — | 20,887.5 | |
| — | 8.00 | — | — | ||
| Concrete for Foundation & Plinth (a) in Hard soil | — | — | — | 65,816 | |
| — | 150.00 | — | — | ||
| Concrete for Foundation & Plinth in other than Hard and Rocky soil | — | — | — | 10,59,000 | |
| — | 26.00 | — | — | ||
| Galvanised Traction Mast (Rolled or Fabricated) (a) Supply | — | — | — | 33,78,934 | |
| — | 18.00 | — | — | ||
| Galvanised Traction Mast (Rolled or Fabricated) (b) Erection in Non Power Block | — | — | — | 1,05,156 | |
| — | 8.00 | — | — | ||
| Galvanised Traction Mast (Rolled or Fabricated) (c) Erection in Power Block | — | — | — | 93,465.76 | |
| — | 1.00 | — | — | ||
| Drop Arms complete set (a) Supply | — | — | — | 1,26,228 | |
| — | 0.60 | — | — | ||
| Drop Arms complete set (b) Erection in Non Power Block | — | — | — | 6,454.8 | |
| — | 0.40 | — | — | ||
| Drop Arms complete set (c) Erection in Power Block | — | — | — | 8,310.8 | |
| — | 12.00 | — | — | ||
| TTC complete (a)Supply | — | — | — | 14,93,820 | |
| — | 10.00 | — | — | ||
| TTC complete (b)Erection in Non Power Block | — | — | — | 1,07,450 | |
| — | 2.00 | — | — | ||
| TTC complete (c) Erection in Power Block | — | — | — | 43,560 | |
| — | 3.00 | — | — | ||
| Fabricated Steel work other than Mast (including super masts for feeder wire) (a) Supply | — | — | — | 3,92,838 | |
| — | 2.00 | — | — | ||
| Fabricated Steel work other than Mast (including super masts for feeder wire) (b) Erection in Non Power Block | — | — | — | 15,238 | |
| — | 1.00 | — | — | ||
| Fabricated Steel work other than Mast (including super masts for feeder wire) (c) Erection in Power Block | — | — | — | 15,155 | |
| — | 2.10 | — | — | ||
| Supply of GI fasteners | — | — | — | 2,91,637.5 | |
| — | 50.00 | — | — | ||
| Single Bracket assembly for Conventional OHE with SPS (a) Supply | — | — | — | 10,68,300 | |
| — | 30.00 | — | — | ||
| Single Bracket assembly for Conventional OHE with SPS (b)Erection in Non Power Block | — | — | — | 31,590 | |
| — | 20.00 | — | — | ||
| Single Bracket assembly for Conventional OHE with SPS (c)Erection in Power Block | — | — | — | 41,600 | |
| — | 50.00 | — | — | ||
| Supply of Stay Arm Insulator | — | — | — | 2,57,350 | |
| — | 50.00 | — | — | ||
| Supply of Bracket Insulator | — | — | — | 2,53,000 | |
| — | 3.00 | — | — | ||
| Supply of Overhead Equipment (a) Assorted Components for conventional OHE | — | — | — | 2,07,819 | |
| — | 0.70 | — | — | ||
| OHE (Conventional) (a) Erection in Non Power Block | — | — | — | 29,948.8 | |
| — | 1.80 | — | — | ||
| OHE (Conventional) (a) Erection in Power Block | — | — | — | 1,54,022.4 | |
| — | 5.00 | — | — | ||
| Solid Core Cut-in-Insulator a) (i) 9 Ton Insulator (Supply) | — | — | — | 37,445 | |
| — | 5.00 | — | — | ||
| Solid Core Cut-in-Insulator a) (ii) Component (Supply) | — | — | — | 9,910 | |
| — | 2.00 | — | — | ||
| Solid Core Cut-in-Insulator (b) Erection in Non Power Block. | — | — | — | 2,610 | |
| — | 3.00 | — | — | ||
| Solid Core Cut-in-Insulator (c) Erection in Power Block. | — | — | — | 7,833 | |
| — | 2.00 | — | — | ||
| Section Insulator assembly (for Conventional OHE) (a)(i) Supply 9-Ton Insulator | — | — | — | 15,220 | |
| — | 2.00 | — | — | ||
| Section Insulator assembly (for Conventional OHE) (a) (ii) Supply of Section Insulator assembly | — | — | — | 98,308 | |
| — | 2.00 | — | — | ||
| Section Insulator assembly (for Conventional OHE) (a) (iii) Core Insulator | — | — | — | 18,022 | |
| — | 2.00 | — | — | ||
| Section Insulator assembly (for Conventional OHE) (b) Erection of above in Power Block | — | — | — | 15,126 | |
| — | 11.00 | — | — | ||
| TERMINATION of (a) Guy Rod assembly including Mast Anchor/Guy Rod attachment. | — | — | — | 1,25,576 | |
| — | 6.00 | — | — | ||
| Termination of Guy Rod assembly including Mast Anchor / Guy Rod attachment (b)Erection in Non Power Block. | — | — | — | 5,526 | |
| — | 5.00 | — | — | ||
| Termination of Guy Rod assembly including Mast Anchor / Guy Rod attachment (c)Erection in Power Block. | — | — | — | 9,165 | |
| — | 11.00 | — | — | ||
| Termination of BC Anchor loop | — | — | — | 13,464 | |
| — | 7.00 | — | — | ||
| Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE (a) Supply | — | — | — | 7,84,056 | |
| — | 3.00 | — | — | ||
| Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE (b)Erection in Non Power Block. | — | — | — | 10,497 | |
| — | 4.00 | — | — | ||
| Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE (c)Erection in Power Block. | — | — | — | 27,992 | |
| — | 2.00 | — | — | ||
| Termination of Single Conductor of (a)(i) Supply of 9-ton. | — | — | — | 15,988 | |
| — | 2.00 | — | — | ||
| Termination of Single Conductor of (a)(ii) Supply of Component. | — | — | — | 20,578 | |
| — | 2.00 | — | — | ||
| Termination of Single Conductor of (b)Erection of above in Power Block | — | — | — | 3,848 | |
| — | 7.00 | — | — | ||
| Termination of DoubleConductor of (a)(i) Supply of 9-ton. | — | — | — | 50,764 | |
| — | 7.00 | — | — | ||
| Termination of Double Conductor of (a)(i) Supply of Component. | — | — | — | 78,869 | |
| — | 3.00 | — | — | ||
| Termination of Double Conductor of (b) Erection in Non Power Block. | — | — | — | 3,165 | |
| — | 4.00 | — | — | ||
| Termination of Double Conductor of (b) Erection in Power Block. | — | — | — | 8,292 | |
| — | 2.00 | — | — | ||
| Anti Creep with Cadmium Copper (a)(i) Supply of 9-ton. | — | — | — | 14,312 | |
| — | 2.00 | — | — | ||
| Anti Creep with Cadmium Copper (a)(ii) Supply of component. | — | — | — | 31,696 | |
| — | 1.00 | — | — | ||
| Anti Creep with Cadmium Copper (b)Erection in non Power Block. | — | — | — | 5,473 | |
| — | 1.00 | — | — | ||
| Anti Creep with Cadmium Copper (b)Erection in Power Block. | — | — | — | 11,176 | |
| — | 2.00 | — | — | ||
| 25 Kv Post Insulator (a) (i) Post Insulator | — | — | — | 16,926 | |
| — | 2.00 | — | — | ||
| 25 Kv Post Insulator (a) (ii) Component. | — | — | — | 1,560 | |
| — | 2.00 | — | — | ||
| 25 Kv Post Insulator (b) Erection in Power Block | — | — | — | 2,596 | |
| — | 1.00 | — | — | ||
| 25 KV Single Pole Isolator 1600A Amps.including Tie Rod Insulator and pedestal insulator(a) Supply | — | — | — | 61,846 | |
| — | 1.00 | — | — | ||
| 25 KV Single Pole Isolator 1600A Amps.Including Tie Rod Insulator and pedestal insulator (b) Erection in POwer Block. | — | — | — | 7,193 | |
| — | 1.00 | — | — | ||
| Connectors and terminals (a) Supply. | — | — | — | 5,030 | |
| — | 1.00 | — | — | ||
| Connectors and terminals (b) Erection | — | — | — | 516 | |
| — | 6.00 | — | — | ||
| Supply of copper bus bar 18mm | — | — | — | 17,040 | |
| — | 2.00 | — | — | ||
| Supply and erection of solid copper Bus Bar connectors:Bus terminal 6310 | — | — | — | 5,684 | |
| — | 2.00 | — | — | ||
| Terminal connectors of jumper: 1009 (a) Supply | — | — | — | 2,546 | |
| — | 2.00 | — | — | ||
| Terminal connectors of jumper: 1009 (a) Erection | — | — | — | 122 | |
| — | 100.00 | — | — | ||
| Structure Bond of Avg length 3.25 mtrs including fasteners (a) Supply | — | — | — | 46,600 | |
| — | 100.00 | — | — | ||
| Structure Bond of Avg length 3.25 mtrs including fasteners (b) Erection | — | — | — | 6,200 | |
| — | 30.00 | — | — | ||
| Longitudinal Bond of length 4.50 mtrs for cross over point (a) Supply | — | — | — | 18,510 | |
| — | 30.00 | — | — | ||
| Longitudinal Bond of length 4.50 mtrs for cross over point (b) Erection | — | — | — | 5,400 | |
| — | 20.00 | — | — | ||
| Transverse/Special Bond Avg length 3.25 mtrs including PVC (a) Supply | — | — | — | 9,840 | |
| — | 20.00 | — | — | ||
| Transverse/Special Bond Avg length 3.25 mtrs including PVC (b) Erection | — | — | — | 1,460 | |
| — | 42.00 | — | — | ||
| Number Plate Retro reflective type (Mast/Structure) (a) Supply | — | — | — | 20,370 | |
| — | 42.00 | — | — | ||
| Number Plate Retro reflective type (Mast / Structure) (b) Erection in Non Power Block | — | — | — | 5,040 | |
| — | 5.00 | — | — | ||
| Caution Board for 25 KV Traction (a) Supply | — | — | — | 1,850 | |
| — | 5.00 | — | — | ||
| Caution Board for 25 KV Traction (b) Erection in Non Power Block | — | — | — | 595 | |
| — | 5.00 | — | — | ||
| Danger Board for 25 KV Traction (A) Supply. | — | — | — | 1,850 | |
| — | 5.00 | — | — | ||
| Danger Board for 25 KV Traction (b) Erection in Non Power Block | — | — | — | 595 | |
| — | 5.00 | — | — | ||
| Public Caution Board for 25 KV Traction (a) Supply | — | — | — | 1,850 | |
| — | 5.00 | — | — | ||
| Public Caution Board for 25 KV Traction (b) Erection in Non Power Block | — | — | — | 595 | |
| — | 2.00 | — | — | ||
| Electrical Engine Stop Board (a) Supply | — | — | — | 2,066 | |
| — | 2.00 | — | — | ||
| Electrical Engine Stop Board (b) Erection in Non Power Block | — | — | — | 508 | |
| — | 1.00 | — | — | ||
| Sectioning Diagram Board (a) Supply | — | — | — | 11,293 | |
| — | 1.00 | — | — | ||
| Sectioning Diagram Board (b) Erection in Non Power Block | — | — | — | 1,130 | |
| — | 1.00 | — | — | ||
| Modification to sectioning diagram at stations and TPC (a) Erection in Non POwer BLock. | — | — | — | 2,946 | |
| — | 10.00 | — | — | ||
| Modification for erection (a) Transfer of Equipment from one Mast/support to another under POwer Block. | — | — | — | 70,110 | |
| — | 10.00 | — | — | ||
| Modification to Erection (b) Splicing and Extension of Anchored OHE including PVC Sleeve under ROB (i) Supply | — | — | — | 44,140 | |
| — | 10.00 | — | — | ||
| Modification to Erection (b) Splicing and Extension of Anchored OHE including PVC Sleeve under ROB (ii) Erection in Non Power Block | — | — | — | 1,24,450 | |
| — | 15.00 | Each Span | — | ||
| (c)Slewing & Re-slewing of OHE (i) Erection in Non Power Block | — | — | — | 1,37,145 | |
| — | 15.00 | Each Span | — | ||
| (c)Slewing & Re-slewing of OHE (ii) Erection in Power Block | — | — | — | 2,70,030 | |
| — | 20.00 | — | — | ||
| (e) Adjustment of existing OHE with Tower wagon checking (i) Erection in Non Power Block | — | — | — | 16,480 | |
| — | 20.00 | — | — | ||
| (e) Adjustment of existing OHE with Tower wagon checking (i) Erection in Power Block | — | — | — | 32,960 | |
| — | 0.20 | — | — | ||
| Dismantling of OHE (a)In Non Power Block | — | — | — | 5,198.4 | |
| — | 0.20 | — | — | ||
| Dismantling of OHE (b)In Power Block. | — | — | — | 10,700.2 | |
| — | 10.00 | — | — | ||
| Dismantling of Mast/Structure upright (a) In Non Power Block | — | — | — | 37,790 | |
| — | 10.00 | — | — | ||
| Dismantling of Mast/Structure upright (b) Erection in Power Block. | — | — | — | 73,450 | |
| — | 12.00 | — | — | ||
| Dismantling of Cantilever (a) In Power Block. | — | — | — | 21,624 | |
| — | 2.00 | — | — | ||
| Dismantling of section insulator (a) Erection in Power Block | — | — | — | 13,310 | |
| — | 1.00 | — | — | ||
| Dismantling of SP/DP Isolator (a) In Power BLock | — | — | — | 5,493 | |
| — | 2.00 | — | — | ||
| Dismantling of Guy rod assembly (a) In Erection in Non Power Block | — | — | — | 1,692 | |
| — | 2.00 | — | — | ||
| Dismantling of Guy rod assembly (b) In Erection in Power Block | — | — | — | 3,324 | |
| — | 2.00 | — | — | ||
| Dismantling of Anti Creep (a) Erection in Non Power Block | — | — | — | 5,402 | |
| — | 2.00 | — | — | ||
| Dismantling of Anti Creep (a) Erection in Power Block | — | — | — | 10,804 | |
| — | 2.00 | — | — | ||
| Dismantling of Regulating Equipment with Counter Weight assembly (a) In Power Block | — | — | — | 13,552 | |
| — | 0.20 | — | — | ||
| Dismantling of Small Steel parts in Power Block | — | — | — | 1,709.6 | |
| — | 15.00 | — | — | ||
| Dismantling of Structure Bond parts in Non Power Block | — | — | — | 1,005 | |
| — | 20.00 | — | — | ||
| Dismantling of Foundation in Non Power Block. | — | — | — | 46,560 | |
| — | 4.00 | — | — | ||
| Dismantling of Dismantling of 9-ton insulators in Power Block. | — | — | — | 29,036 | |
| — | 2.00 | — | — | ||
| Dismantling of termination in Power Block. | — | — | — | 43,372 | |
| — | 7.00 | — | — | ||
| Dismantling of Different type of jumper in Power Block. | — | — | — | 9,877 | |
| — | 2.00 | — | — | ||
| Single Earth Electrode (a) Supply | — | — | — | 6,890 | |
| — | 2.00 | — | — | ||
| Single Earth Electrode (b) Erection in Non Power Block. | — | — | — | 4,842 | |
| — | 0.10 | — | — | ||
| Large span wire (130 /Sq.mm) (a) Supply | — | — | — | 120.4 | |
| — | 0.10 | — | — | ||
| Large span wire (130 /Sq.mm) (b) Erection in Power Block. | — | — | — | 15.4 | |
| — | 650.00 | — | — | ||
| Overhead Equipment (a) Supply of Dropper Wire (5mm) | — | — | — | 1,18,950 | |
| — | 32.00 | — | — | ||
| Overhead Equipment (a) Supply of Large Jumper Wire (105 Sq.mm). | — | — | — | 33,344 | |
| — | 20.00 | — | — | ||
| Overhead Equipment (c) Small Jumper Wire (50 Sq.mm) | — | — | — | 9,700 | |
| — | 6.00 | — | — | ||
| Components of Copper jumper (C-Jumper &Anti theft jumper ) (a) Supply | — | — | — | 20,310 | |
| — | 3.00 | — | — | ||
| Components of Copper jumper (C-Jumper &Anti theft jumper) (b)Erection in Non Power Block. | — | — | — | 519 | |
| — | 3.00 | — | — | ||
| Components of Copper jumper (C-Jumper &Anti theft jumper) (c)Erection in Power Block. | — | — | — | 1,041 | |
| — | 20.00 | — | — | ||
| Large copper jumper wire 160 sqmm. (a) Supply | — | — | — | 29,740 | |
| — | 20.00 | — | — | ||
| Component of Large copper jumper wire 160 Sq.mm (a) Supply | — | — | — | 1,24,060 | |
| — | 20.00 | — | — | ||
| Component of Large copper jumper wire 160 Sq.mm (b) Erection in Power Block. | — | — | — | 6,360 | |
| — | 26.00 | — | — | ||
| Supply of Contact wire Parallel Clamp (Small) 1041-2 | — | — | — | 5,096 | |
| — | 48.00 | — | — | ||
| Supply of Contact wire Parallel Clamp 1030-2 | — | — | — | 10,752 | |
| — | 4.00 | — | — | ||
| Supply of Contact wire Parallel Clamp 1050-3 | — | — | — | 1,032 | |
| — | 12.00 | — | — | ||
| Supply of Catenary end fitting 65 sqmm. | — | — | — | 6,648 | |
| — | 4.00 | — | — | ||
| Supply of Catenary splice 65 sqmm. | — | — | — | 2,236 | |
| — | 4.00 | — | — | ||
| Supply of Contact wire splice (Toothed type). | — | — | — | 5,168 | |
| — | 50.00 | — | — | ||
| Tree Trimming in non POwer Block. | — | — | — | 3,500 | |
| — | 1.00 | Lumpsum | — | ||
| Public Notification for EIG. | — | — | — | 6,000 | |
| — | 42.00 | — | — | ||
| Stenciling of parameter. | — | — | — | 1,512 | |
| — | 5.00 | — | — | ||
| Handling, leading , loading and transportation charges for Railway supply materials from different railway site and released materials from different railway site ,if any to the concerned depot | — | — | — | 57,590 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocument25.08.26.pdf Tender Document
ATTACHMENT
ACS-1.pdf
ATTACHMENT
ACSNo_2.pdf
ATTACHMENT
ACS-3.pdf
ATTACHMENT
ACS-4.pdf
ATTACHMENT
ACS-5.pdf
ATTACHMENT
ACS-6.pdf
ATTACHMENT
ACS-7.pdf
ATTACHMENT
ACS-8.pdf
ATTACHMENT
ACS-9.pdf
ATTACHMENT
ACS-10.pdf
ATTACHMENT
TenderDocument25.08.26.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .