Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAdmitted-Finance | ₹9.6 L | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | NATESH KUMAR K K L1 |
|---|---|---|---|---|
| 1.00 | Providing and applying elastomeric liquid water proofing membrane with resilient acrylic polymers ( SMART CARE DAMP PROOF ULTRA of asian paints (white shade ) or equivalent, approved by engineer in charge) 3 coats comprising of a prime coat with a dilution of 30% as a self-priming coat on top of concrete roof. Allow the prime coat to dry for 4-6hours and apply the undiluted 1st coat using a brush or a roller in uni-direction. Allow the 1st coat to dry for 4-6hours and apply the 2nd coat in perpendicular direction to the previous coat. All the operations shall be carried out as per the direction of Engineer-in-Charge. ( warranty as per manufactures specification shall also be provided for approriate period) | 296 | One Square Metre | 950 ₹2,81,200 Lowest |
| 1.01Methods of application: i) Cleaning : Surface should be free from any loose paint, dust , grease etc. It is recommended to use Intense wire brushing, High speed water jet and a vacuum cleaner for thorough cleaning of the surface to avoid "Peeling off" problems. | ||||
| 1.02ii) REPAIRING : The substrate must be checked for its soundness using a small hammer. All cracks at corner joints, channels and parapets should be properly treated. | ||||
| 1.03iii) FILLING FOR CRACKS : For filling cracks up to 3mm use Asian Paints Crack Seal. Bigger cracks, damaged portions and hollow areas must be repaired with polymer modified cement mortars. | ||||
| 1.04iv) SELF PRIMING SMARTCARE DAMP PROOF ULTRA with 33 % dilution with water ,4-6 hours recoating period time is required for recoating next coat. | ||||
| 1.05v) 1st coat - WATERPROOFING SMARTCARE DAMP PROOF ULTRA without dilution,4-6 hours recoating period time is required for recoating next coat. | ||||
| 1.06vi) 2nd Coat - WATERPROOFING SMARTCARE DAMP PROOF ULTRA. | ||||
| 2.00 | Providing and applying exterior emulsion with Graphene. The first coat with self-priming elastomeric waterproofing paint (Protek basecoat of Asian paints or equivalent) and two coats of undiluted elastomeric waterproofing liquid (Ultima Protek 1090 top coat of Asian paint or equivalent). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles /dirt/algae with wire brushes,pressure washing with water filling up of cracks etc complete in all respects as per the direction of Engineer-in-Charge. | 726 | One Square Metre | 590 ₹4,28,340 Lowest |
| 2.01Methods of application: i) Cleaning : Surface should be free from any loose particles, dust , algae etc. The cleaning opearion shall be carried out with use Intense wire brushing, High speed water jet and a vacuum cleaner for thorough cleaning of the surface to avoid "Peeling off" problems. | ||||
| 2.02ii) FILLING FOR CRACKS : For filling cracks up to 3mm use Asian Paints Crack Seal. Bigger cracks, damaged portions and hollow areas must be repaired with polymer modified cement mortars. | ||||
Tender Value
₹8.9 L
EMD Value
₹17,825
Closing Date
30 May 2026, 6:00 pmClosed
The Executive Engineer Civil Tender KTK Circle
Room No 324 3rd Floor CGMT Doorasamparka Bhavana No 1 Swamy Vivekananda Road Bengaluru 560008
ARRESTING LEAKAGE FROM TERRACE AND BACKSIDE WALL OF TDM OFFICE PAINTING AND PETTY REPAIRS IN SBM TE COMPOUND AT MADIKERI KODAGU DIST
2026_BSNL_278149_1
NIT 07/BSNL/CD/MYS/2026-27
Open Tender
Civil Works - Buildings
Item Rate
60 days
MADIKERI KODAGU
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
The Accounts Officer Cash BSNL Mysore Telecom Dist
₹17,825
10 Jun 2026
20 May 2026
2 Jun 2026
21 May 2026
30 May 2026
21 May 2026
21 May 2026 - 29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and applying elastomeric liquid water proofing membrane with resilient acrylic polymers ( SMART CARE DAMP PROOF ULTRA of asian paints (white shade ) or equivalent, approved by engineer in charge) 3 coats comprising of a prime coat with a dilution of 30% as a self-priming coat on top of concrete roof. Allow the prime coat to dry for 4-6hours and apply the undiluted 1st coat using a brush or a roller in uni-direction. Allow the 1st coat to dry for 4-6hours and apply the 2nd coat in perpendicular direction to the previous coat. All the operations shall be carried out as per the direction of Engineer-in-Charge. ( warranty as per manufactures specification shall also be provided for approriate period) | 296 | One Square Metre | - | - |
| 1.01 | Methods of application: i) Cleaning : Surface should be free from any loose paint, dust , grease etc. It is recommended to use Intense wire brushing, High speed water jet and a vacuum cleaner for thorough cleaning of the surface to avoid "Peeling off" problems. | - | - | - | - |
| 1.02 | ii) REPAIRING : The substrate must be checked for its soundness using a small hammer. All cracks at corner joints, channels and parapets should be properly treated. | - | - | - | - |
| 1.03 | iii) FILLING FOR CRACKS : For filling cracks up to 3mm use Asian Paints Crack Seal. Bigger cracks, damaged portions and hollow areas must be repaired with polymer modified cement mortars. | - | - | - | - |
| 1.04 | iv) SELF PRIMING SMARTCARE DAMP PROOF ULTRA with 33 % dilution with water ,4-6 hours recoating period time is required for recoating next coat. | - | - | - | - |
| 1.05 | v) 1st coat - WATERPROOFING SMARTCARE DAMP PROOF ULTRA without dilution,4-6 hours recoating period time is required for recoating next coat. | - | - | - | - |
| 1.06 | vi) 2nd Coat - WATERPROOFING SMARTCARE DAMP PROOF ULTRA. | - | - | - | - |
| 2 | Providing and applying exterior emulsion with Graphene. The first coat with self-priming elastomeric waterproofing paint (Protek basecoat of Asian paints or equivalent) and two coats of undiluted elastomeric waterproofing liquid (Ultima Protek 1090 top coat of Asian paint or equivalent). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles /dirt/algae with wire brushes,pressure washing with water filling up of cracks etc complete in all respects as per the direction of Engineer-in-Charge. | 726 | One Square Metre | - | - |
| 2.01 | Methods of application: i) Cleaning : Surface should be free from any loose particles, dust , algae etc. The cleaning opearion shall be carried out with use Intense wire brushing, High speed water jet and a vacuum cleaner for thorough cleaning of the surface to avoid "Peeling off" problems. | - | - | - | - |
| 2.02 | ii) FILLING FOR CRACKS : For filling cracks up to 3mm use Asian Paints Crack Seal. Bigger cracks, damaged portions and hollow areas must be repaired with polymer modified cement mortars. | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_324795.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .