Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance being the Lowest Bidder |
| 2 | L2₹1.2 Cr+₹16.6 L (15.5%)Rejected-Finance | ₹1.2 Cr+₹16.6 L (15.5%) | L2 | Rejected-Finance being the Second Lowest Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
20 Aug 2020, 4:00 pmClosed
O/o Executive Engineer, RWD, Likabali
RWD Likabali Division, Lower Siang District AP 791125
Gabion Structure Pucca Side Drain Earthen Drain R B Wall Sub Grade preparation Shoulder WBM III and PMC Road Furniture etc
2020_CEAR_95167_1
AR21AR1302004
Open Tender
Civil Works - Roads
Item Rate
365 days
Dipa
Firm registration Tender fee EMD Bank solvency Balance sheet of last 5 year by CA Bank Guarantee with
credit facility EPF GST number Work experience Machineries with RC etc
10 documents required · 10 mandatory
₹8,000
ARRDA, RWD Itanagar
₹2.7 L
Likabali
19 Oct 2020
23 Jun 2020
21 Aug 2020
23 Jun 2020
20 Aug 2020
24 Jun 2020
24 Jun 2020 - 30 Jun 2020
30 Jun 2020
Amount
SUBGRADE AND EARTHEN SHOULDER
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
WBM-III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
P.M.C Prime Coat (High porosity) Providing and applying primer coat with bitumen emulsion (SS-I) on prepared surface grangular base i/c cleaning of road surface and spraying primer @ 0.90 - 1.20 kg/sqm using mechanical means as per technical specification clause 502.
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per Technical Specification Clause 503.
20 mm thick open graded primix carpet using bitumineous binder. Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Case - I By Manual Means ii) Bitumen (S-65)
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 Case - I By Manual Means ii) Bitumen (S-65)
SUB -HEAD : - CROSS-DRAINAGE, BRIDGES & PROTECTION WORKS Earthwork in excavation of foundation of struture as per drawing technical specification, i/c setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sites and bottom and back filling with approved mat
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 i) Nominal mix 1:3:6
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 a)Coursed Rubble msonary (first sort) In 1:3 cement mortar
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Gavoin Structure Providing and laying wire created boulder structures boulder size 22.5 cm to 45 cm having 25 kg average weight for each i/c dumping/laying in S.W.G. Wire mesh of 10 cm x 10 cm (woven diagonally) 4mm dia i/c packing with small size stone spalls and carrying of boulders from a lead of 50 mtr and lift up to 1.5 mtr i/c lying properly the mesh by cutting the mouth and hoisting of wire where felt necessary as per direction of Engineer-in-Charge technical specifications Clause 1301. ( Based on SDB Rural Road Chapter-14, Item No.14.2)
Road Furniture Providing and fixing of typical PMGSY Citizen information sign board as per MORD specifications and drawing of cast-in-situ RCC,(Size of RCC post 25cmx25cmx90cm below G.L. & 15cmx15cmx245cm above G.L.),(Size of board 2x 90cmx80cmx7.5cm, ) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved quality ready mix paint.
Safety Devices and Signs in Construction Zones Provision and fixing of traffic signs for limited period at suitable locations in construction zone comprising of warning zone, approach transition zone, working zone and terminal transition zone with a minimum distance of 2-3 m from the edge of the carriageway. The bottom edge of the lowest sign plate to be not less than 2 m above the road level, fixed on 600 mm x 600 mm x 6 mm angle iron post, founded and installed as per approved design and drawings, removed and disposed of after completion of construction work, all as per IRC:SP:55-2001.
Men at work
Road narrow
Un-even road
Slippery road
Diversion
Do not enter
Go Slow
Speed limit
Routine Maintenance
First Year
Second Year
Third Year
Fourth Year
Fifth Year
Add GST @ 12%
M/S HAJI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .