Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC 159B M G ROAD HARIDEVPUR KOLKATA WEST BENGAL 700082 UDYAM WB 10 0018308 | KOLKATA | WEST BENGAL | 700082 | ₹8.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.6 L+₹59,471.25 (7.41%)Rejected-Finance | ₹8.6 L+₹59,471.25 (7.41%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.6 L+₹61,454.95 (7.66%)Rejected-Finance | ₹8.6 L+₹61,454.95 (7.66%) | L3 | Rejected-Finance L3 |
Tender Value
₹8.6 L
EMD Value
₹17,239
Closing Date
3 Jul 2026, 12:30 pmClosed
Executive Engineer, ED-VIII, EM, KMDA
OFFICE OF THE EXECUTIVE ENGINEER , ED-VIII, E-M SECTOR, K.M.D.A. UNNAYAN BHAVAN, 2ND FLOOR, BLOCK-L, SALT LAKE CITY, KOLKATA 700 091
Operation and Maintenance of existing lighting installation including switching operation at Subhas Sarabar for a period of 10 months.
2026_KMDA_1028477_1
01/EE/ED-VIII/ EM/KMDA/eT-01 of 2026-27, dated 12.06.2026
Open Tender
Electrical Work/ Equipment
Percentage
300 days
Subhas Sarabar
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹17,239
OFFICE OF THE EXECUTIVE ENGINEER, ED-VIII
21 Aug 2026
19 Jun 2026
6 Jul 2026
19 Jun 2026
3 Jul 2026
19 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART-I [ No Contractor's % allowed in this part] | |||||
| 2Attending / lnspection & maintenance of all Outdoor lighting installations & luminaries e.g.street light. bollard light & decorative pole light at Subhas Sarovar including high mast points in every morning and evening to ensure uninterrupted glowing of maximun nos of luminaries through existing timer arrangement automatically /manualIy as applicable incl restoration of fault, repairing & replacement of spares(to be supplied seperately) and including repairing of minor faults, replacement of fuse wires, cut out, wiring in Pillar box,replacement of Main switch ;Timer ,temporary catenary/under ground wire-connection and contact to CESC/WBSEDCL as and when required as per direction of E.I.C.and necessary activities as per technical specification. (2nos Semi-Skilled Person) | |||||
| 3Add GST @ 18% | |||||
| 4 | Add CESS @ 1% | - | LS | 0.2 | - |
| 5PART-II | |||||
| 6SUPPLYING OF FOLLOWING XLPE INSULATED ALUMINUM CONDUCTOR ARMORED CABLES OF 1.1KV GRADE AS PER IS 7098 (PART 1) 1988 WITH UP TO DATE AMENDMENTS. (Rate in Rs. Per Mtr) a) 2 core 16 sq mm. | |||||
| 7Laying of one no. cables upto 35mm in underground trench 460mm widex760 mm avg .depth with brick protection on the top of the cables eith 8 (eight) nos. bricks per meter including filling the spaces between the bricks & cables and also the trench eith shifted soil levelling up & restoring surface duly rammed. | |||||
| 8Laying only Cable upto 50 sqmm through existing RCC/Hume GI Pipe/open masonary trench for single, 2, 3, 3½ & 4 core | |||||
| 9Supplying and fixing compression type gland complete with brass gland, brass ring & rubber ring for dust & moisture-proof entry of XLPE/PVC armoured cables as below (a) For 2 core 16 sqmm | |||||
| 10Finishing the end of following XLPE/PVC armoured cables by crimping method incl. supplying and fixing solderless socket (Dowels make), tapes, anticorrosive paste & jointing materials a)2 core 16 sqmm cable | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_2526165.xls
BOQ • 0.35 MB
Docs1_ED8.pdf
Tender Documents • 3.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .