| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹47.3 LAccepted-AOC HOUSE NO 244175 V P O BEHMAN DIWANA BATHINDA BATHINDA PUNJAB 151001 INDIA | 244175 | 1 | Accepted-AOC L-1 Bidder | |
| 2 | 2₹48.2 L+₹91,200 (1.93%)Rejected-Finance H NO 12781 ST NO 01 AZAD NAGAR BACK SIDE SUKHRAJ CINEMA BATHINDA | BATHINDA | BATHINDA | PUNJAB | 2 | Rejected-Finance Being L-2 | |
| 3 | 3₹49.1 L+₹1.9 L (3.98%)Rejected-Finance GRAIN MARKET GONIANA BATHINDA | BATHINDA | BATHINDA | PUNJAB | 3 | Rejected-Finance Being L-3 | |
| 4 | 4₹56.9 L+₹9.7 L (20.5%)Rejected-Finance | 4 | Rejected-Finance Being L-4 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
17 Mar 2020, 3:00 pmClosed
Er.Baljit Singh
Colony Civil Mtc. Cell
Annual Maintenance of railway track(Stage I and II) at GHTP, Lehra Mohabat
2020_POWER_44274_1
86/CCMC-234/2020-21
Open Tender
Housekeeping/ Cleaning
Tender cum Auction
365 days
GHTP Lehra Mohabat
As per DNIT
4 documents required · 4 mandatory
₹1,180
TIA
₹1.4 L
Yes
6 May 2020
12 Feb 2020
23 Mar 2020
12 Feb 2020
17 Mar 2020
12 Feb 2020
Amount
Part-I =Track of stage-I
Routine mtc. of B.G track length of about 23.67 kms including its 52 Nos. points and x-ings and level x-ings involving the following operations to be performed during the month in order to keep the entire Rly. Track in fit & running conditions for movement of trains at all times. a) Patrolling of entire length of 23.67 kms track for identification and rectification of track, tightening of all loose fittings such as keys, bolts, jaws etc. b) Shallow screening/overhauling of BG track (Average qty. = 635 Mtr. Per month) including its points and X-ings to provide effective drainage of water from the track and disposal of screened muck to suitable site as decided by Er-in-charge within the plant area as per IRPWM. c) Through packing of B.G track (Average qty. = 1295 Mtr. Per month) including its points and X-ings observing all stipulations complete as per IRPWM. d) Mtc. of points and crossings (52 Nos.) by cleaning, overhauling, greasing etc. twice a month. e) Mtc. of level x-ing by overhauling in running condition of track including graphiting etc. as per requirement. f) Removal of burr metal from track by chisel by deploying hammer man. g) Up keeping the dead ends. h) Pick up slacks of low joints to maintain track geometry. i) Maintaining curves and re-alignment by string method. j) Maintaining gaps at fish plated joints & Oiling and graphiting etc. (Average qty. =280 Joints Per month). k) Providing & maintaining katcha /pacca drains in railway yard for quick drainage of rain water from railway track. l) Extensive patrolling of track during monsoons. m) Routine cleaning of railway track by removing of grass / wild growth from track and around up to 90 cm from toe of ballast to keep it free from grass/ wild growth manually/ by using pesticides as per requirement. However during monsoon period (July to October), additional labour, if deployed, by the contractor is payable under item no.-4. n) Upkeep of sign boards / signals etc. as per railway standards. o) Drilling of holes & cutting of rails as per requirement. p) Spreading the ballast when required. q) Replacement of rails, sleepers, points & crossings which are worn out & damaged.
Repair of tongue rail points and crossing by welding, grinding and making to its original Specification/ dimension. It includes the cost of labour for dismantlement of tongue rail, points and crossing, its welding to make it in original shape and geometry by grinders and refixing/ realignment to match the original geometry/ level of rail track complete.
(a) Tongue Rails
(b) Crossings
Supply of skilled and unskilled labour, machinery as per requirement/ directions of Er. In charge to undertake take the following mentioned items of work as and when required. a) Changing of sleepers damaged or unserviceable at any time. b) Changing of rails 52 kg including transportation from store to site. c) Fixing check rails. d) Cutting of rails with hexa blades. e) Drilling holes in 52kg rails (29 mm to 31mm) f) Realignment of rail damaged due to derailment g) For attending any allied works. The above labour/ machinery will be deployed only in emergent condition such as derailment/accident/other emergent repairs. All T&P, consumables etc. shall be arranged by the contractor at his own cost, so the contractor should quote rates accordingly.
Skilled workers
Unskilled workers
Tractor with or without trolley
Hydra Crane
Supply of unskilled labour to Weed out grass/ wild growth in railway yard during the monsoon season as per requirement/ directions of Er. In charge.
Part-II= Supply of Material:-
Supplying and stacking of graded stone ballast of approved size as per railway speciation of 63mm ballast in GHTP railway yard at different locations as directed by Engineer Incharge.
Supply of bolts and nuts (25mm dia) of various sizes & length as per Railway standards as detailed below:- i) 525 mm long ii) 400 mm long iii) 350 mm long iv) 300 mm long v) 250 mm long vi) 210 mm long Note:- Size & No. of bolts may vary as per requirement.
Supply of safety locks with chain, lock pin Complete set as per railway standard provided at site
Supply of safety lock bolt 25mm dia size, length 210mm per railway standard provided at site
Grease- Servo Gem EP-1
Part-III (Track of stage-II)
Routine mtc. of B.G track length of about 5.5 kms approx. of stage-II including its 21 Nos. points and x-ings and level x-ings involving the following operations to be performed during the month in order to keep the entire Rly. Track in fit & running conditions for movement of trains at all times. a) Patrolling of entire length of 5.5 kms track of stage-II for identification and rectification of track, tightening of all loose fittings such as keys, bolts, jaws etc. b) Shallow screening/overhauling of BG track (Average qty. = 150 Mtr. Per month) including its points and X-ings to provide effective drainage of water from the track and disposal of screened muck to suitable site as decided by Er-in-charge within the plant area as per IRPWM. c) Through packing of B.G track (Average qty. = 300 Mtr. Per month) including its points and X-ings observing all stipulations complete as per IRPWM. d) Mtc. of points and crossings (21 Nos.)by cleaning, overhauling, greasing etc. twice a month. e) Mtc. of level x-ing by overhauling in running condition of track including graphiting etc. as per requirement. f) Removal of burr metal from track by chisel by deploying hammer man. g) Up keeping the dead ends. h) Pick up slacks of low joints to maintain track geometry. i) Maintaining curves and re- alignment by string method. j) Maintaining gaps at fish plated joints & Oiling and graphiting etc. (Average qty. =90 Joints Per month). k) Providing & maintaining katcha/ pacca drains in railway yard for quick drainage of rain water from railway track. l) Extensive patrolling of track during monsoons. m) Routine cleaning of railway track by removing of grass / wild growth from track and around up to 90 cm from toe of ballast to keep it free from grass/ wild growth manually/ by using pesticides as per requirement. However during monsoon period (July to October), additional labour, if deployed, by the contractor is payable under item no.-2. n) Upkeep of sign boards / signals etc. as per railway standards. o) Drilling of holes & cutting of rails as per requirement. p) Spreading the ballast when required. q) Replacement of rails, sleepers, points & crossings which are worn out & damaged.
Supply of unskilled labour to Weed out grass/ wild growth in railway yard during the monsoon season as per requirement/ directions of Er. In charge.
Bidder Name
Amount in Words
DHALIWAL CONSTRUCTION CO
GOBIND RAM AND COMPANY
ASHWANI SAINI GOVT CONTRACTOR
SHIVA ENGINEERING ENTERPRISES
GOBIND RAM AND COMPANY
SHIVA ENGINEERING ENTERPRISES
DHALIWAL CONSTRUCTION CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .