| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.3 LAccepted-AOC | ₹34.3 L Quoted ₹35.7 L | L1 | Accepted-AOC Being lowest |
| 2 | L2₹37.5 L+₹1.8 L (5.10%)Rejected-Finance | ₹37.5 L+₹1.8 L (5.10%) | L2 | Rejected-Finance Being other than L1 |
| 3 | L3₹38.0 L+₹2.3 L (6.50%)Rejected-Finance | ₹38.0 L+₹2.3 L (6.50%) | L3 | Rejected-Finance Being other than L1 |
Tender Value
₹46 L
EMD Value
₹92,000
Closing Date
18 Mar 2020, 6:00 pmClosed
Garrison Engineer (AF) E/M Chakeri, Kanpur
Garrison Engineer (AF) E/M Chakeri, Kanpur 208008
COMPREHENSIVE MAINTENANCE MANNING AND OPERATION OF CENTRAL AC PLANT AT AFS CHAKERI KANPUR
2020_MES_325300_1
8350/E8
Open Tender
Civil Works
Item Rate
335 days
Garrison Engineer (AF) E/M Chakeri, Kanpur
As per NIT
8 documents required · 8 mandatory
₹500
Garrison Engineer (AF) E/M Chakeri, Kanpur
₹92,000
9 Apr 2020
14 Feb 2020
25 Mar 2020
14 Feb 2020
18 Mar 2020
28 Feb 2020
Amount
Manning & Operation Provisioning of resources for maintenance & operation of central AC plant of 4x80 TR, 3x50 TR chilling plant and 3x16.5 TR water cooled package AC plant having compressors with its connected items such as condensers/chillers, water circulating pumps, chilling pumps, blowers, blower motor, cooling tower with fan and motor including connected starters etc in all respect for smooth running of AC plants/chilling/package AC plant during the running period to maintain designed Air conditioning/chilled water/ Package AC temperature inside the building/ block from 06:00 hrs to 22:00 hrs (Two shift of 08 hours) every day except holidays and sundays as observed by the air force authority and cleaning of all equipments and sweeping inside and outside of the installation and maintaining of log sheet on daily basis. The minor repair such as tightning of pump gland, filling of new gland with nut bolts and electrical complaints of motor pump and panel and starter will be attended and rectified by the contractor without any extra cost for smooth function of plant inspecting the plant/system and carrying out operation of plant, as a part of day to day operation and in accordance with relevant PM checklists and as per schedules that will be prepared upon activation of contract. The sailent features in theses checklists are as follows complete all as specified and as directed. (a) starting and stopping of the plant as per requirment of the user. (b) Checking the water level in the cooling tower. (c) Recording the plant operational parameters including pump pressures and motor amps in the log sheet. (d) Checking the central AC or refrigeration system and equipment such as compressor, motors, pumps, cooling towers and their electrical controls on the respective equipment. (e) Checking the refrigeration system for any leakage. (f) Checking the electrical and refrigeration control system for operation and adjustments of set values as necessary. (g) Lubrication of all necessary points in the system & its components in line with the checklist. (h) Weekly cleaning of AHU filters. (j) Maintaining of central AC plant installation & sorrounding area neat & clean.
Provisioning of resources for maintenance & operation of central AC plant of 4x100 TR capacity at 101 block having compressors with its connected items such as condensers/chillers, water circulating pumps, chilling pumps, blowers, blower motor, cooling tower with fan and motor including connected starters etc in all respect for smooth running of AC plants during the running period to maintain designed Air conditioning/chilled water temperature inside the building/ block from as per working hours mentioned below and cleaning of all equipments and sweeping inside and outside of the installation and maintaining of log sheet on daily basis. The minor repair such as tightning of pump gland, filling of new gland with nut bolts and electrical complaints of motor pump and panel and starter will be attended and rectified by the contractor without any extra cost for smooth function of plant inspecting the plant/system and carrying out operation of plant, as a part of day to day operation and in accordance with relevant PM checklists and as per schedules that will be prepared upon activation of contract. The sailent features in theses checklists are as follows complete all as specified and as directed. (a) starting and stopping of the plant as per requirment of the user. (b) Checking the water level in the cooling tower. (c) Recording the plant operational parameters including pump pressures and motor amps in the log sheet. (d) Checking the central AC or refrigeration system and equipment such as compressor, motors, pumps, cooling towers and their electrical controls on the respective equipment. (e) Checking the refrigeration system for any leakage. (f) Checking the electrical and refrigeration control system for operation and adjustments of set values as necessary. (g) Lubrication of all necessary points in the system & its components in line with the checklist. (h) Weekly cleaning of AHU filters. (j) Maintaining of central AC plant installation & sorrounding area neat & clean. (k) Working hours: (i) From 0630 Hrs to 1700 hrs on every Monday of week. (ii) From 0630 hrs to 1430 hrs on Tuesday to Friday. (iii) Saturday, Sunday & gazetted holiday no operation.
Note for Srl Item No. 1 to 2 (i) Cleaning of all AC plants, machinery and inside and outside location is the responsibility of contractor. (ii) If any operator found absent from duty Rs. 1500/- per day will be recovered from the contractor. (iii) If the contractor failed to commence the work on due date Rs. 2000/- per installation per day will be recovered from the contractor till commencement of the work. (iv) Contractor will provide police verification of all operator as required by AF Authorities. (v) If the contractor failed to provide duty roaster duly affixed photograph of operator in original before commencement of every month duty Rs. 500/- per day per installation will be recovered from the contractor. (vi) Before commencement of work contractor will provide all documents such as educational qualification, ID proof of operator in duplicate for approval of Engineer-in-Charge. (vii) Contractor will be maintain Attendance Register, Visitor register, maintenance record register, daily log sheet, operator payment register and produce every month to the Engineer-in- Charge. (viii) The contractor should be employed only ITI holder in the specific trade (ix) The operator deployed shall be in uniform indicating the name of individual and firm.
Comprehensive Maint of AC plant/ Chilling plant Quaterly inspection & servicing of the complete central AC plant of capacity 4x80 TR at H No -07 Make Voltas details as per Appx 'A' alongwith all equipment, electric connections to inspect the operation of plant by the rep of OEM and carrying out preventive maintenance as per standard practice. Replacement of defective component / equipment under the respective item of schdule complete all as specified & directed by Engr-in-charge.To maintain & keep the central AC plant functional regularly. (i). Inspecting the plant/ system and carry out preventive as per the standard practice four times in a year or as required. (ii). Checking the refrigeration system, motor and starters and ensuring healthy condition of the plant. (iii). Checking the system for any leaks and rectification of leaks if found. (iv). Taking set of readings and Reporting the healthiness of the plant and suggesting improvements if any. (v). Checking the Refrigeration control system for operation and adjusting the settings. (vi). De scaling the condensers for water-cooled units if found necessary. (Once a year) (vii). Checking the functioning of compressor and its accessories. (viii). Cleaning the evaporator once a year if found necessary. (ix). Lubricating the bearings of motors, fans when found necessary. (x). Quarterly inspection of belts adjusting the tension. (xi). Checking of the microprocessor controller for its proper functioning with all sensors. (xii). Attending to breakdown calls. (xiii). Labour involving evacuation of refrigerant during replacement of controls and replacement of compressor. (xiv). Carrying out- once in a year, testing of lubricant and water (chilled water system and water condensing systems only) samples. Note: 1: The inspection & servicing shall be carried out by respective OEM only. Contractor has to submit necessary AMC documents to Engr-in-Charge within 15 days of acceptance of tender on account of non-submission of necessary documents of AMC with OEM within 15 days of acceptance, The contract is liable to be cancelled. 2. Labour component for replacement of spare parts shall deemed to be included in the quoted rates and spare parts required for replacement shall be measured and paid separately as "supply only" under relevant items of BOQ. 3. The rates quoted shall also include the attending of emergency breakdowns in AC plants. If such emergency breakdowns are not attended in time, following compensation shall be levied from the contractor's dues: a) Attending breakdown within 72 hours - Rs Nils b) Attending breakdown within 3 to 7 days - Rs 10000 per breakdown. c) Attending breakdown after 7 days - Rs 25000 per breakdown. 3. Spare parts required shall be measured & paid separately under relevent items based on thier consumption on ground
`-ditto- all as per item No 3 above but 3x50 TR Chilling plant at H No 7 Make: Voltas details as per Appx 'B'
`-ditto- all as per item No 3 above but 3x50 TR AC plant at CRSMake: Voltas details as per Appx 'C'
`-ditto- all as per item No 3 above but 3x24 TR AC plant at Red Barron Make: Voltas details as per Appx 'D'
Quaterly inspection & servicing of the complete central AC plant of capacity 4x100 TR at 101 block Make Blue star as per Appx 'E' alongwith all equipment, electric connections to inspect the operation of plant and carrying out preventive maintenance as per standard practice. Replacement of defective component / equipment under the respective item of schdule complete all as specified & directed by Engr-in-charge.To maintain & keep the central AC plant functional regularly. (i). Inspecting the plant/ system and carry out preventive as per the standard practice four times in a year or as required. (ii). Checking the refrigeration system, motor and starters and ensuring healthy condition of the plant. (iii). Checking the system for any leaks and rectification of leaks if found. (iv). Taking set of readings and Reporting the healthiness of the plant and suggesting improvements if any. (v). Checking the Refrigeration control system for operation and adjusting the settings. (vi). De scaling the condensers for water-cooled units if found necessary. (Once a year) (vii). Checking the functioning of compressor and its accessories. (viii). Cleaning the evaporator once a year if found necessary. (ix). Lubricating the bearings of motors, fans when found necessary. (x). Quarterly inspection of belts adjusting the tension. (xi). Checking of the microprocessor controller for its proper functioning with all sensors. (xii). Attending to breakdown calls. (xiii). Labour involving evacuation of refrigerant during replacement of controls and replacement of compressor. (xiv). Carrying out- once in a year, testing of lubricant and water (chilled water system and water condensing systems only) samples. (xv) Compressor oil replacement in a year
Supply insallaion ,testing & commissioning following Spare parts in replacement for running of the plants of capacity 80 TR complete all as specified and directed. Make: Voltas PLC Controller
Supply only temp sensor
Supply only Pressue Transducer
Supply only Expansion Valve
Supply only Expansion valve power element
Supply only Pressure difference switch
Supply only Pressure relief valve
Supply only Filter drier
Supply only Oil Transducer
Supply only Solonoid valve coil
Supply only Crank case Heater
Supply only Motor Protection Device
Supply only Contactor of chiller unit
Supply only Transformer of chiller unit
Supply only Voltage protection relay
Supply only Current transmitter
Supply only Current transformer
Supply only Compressor oil
Supply only Tyre suitable for compessor coupling
Supply only Tyre coupling of compressor
Supply only Pressure testing and Vacumization chiller unit
Supply only De-hidration of evaportor or condenser
Supply insallaion ,testing & commissioning following Spare parts in replacement for running of the plants of capacity 50 TR complete all as specified and directed. Make: Voltas. PLC Controller
Supply only Temp sensor
Supply only Pressue Transducer
Supply only Expansion Valve
Supply only Expansion valve power element
Supply only Pressure difference switch
Supply only Pressure relief valve
Supply only Filter drier
Supply only Oil Transducer
Supply only Solonoid valve coil
Supply only Crank case Heater
Supply only Motor Protection Device
Supply only Contactor of chiller unit
Supply only Transformer of chiller unit
Supply only Voltage protection relay
Supply only Current transmitter
Supply only Current transformer
Supply only Compressor oil
Supply only Pressure testing and Vacumization chiller unit
Supply only De-hidration of evaportor or condenser
Supply insallaion ,testing & commissioning following Spare parts in replacement for running of the plants of capacity 24 TR complete all as specified and directed:- Make: Voltas. Microprocessor
Supply onlyTemp sensor
Supply only Pressue Transducer
Supply only Expansion Valve
Supply only Pressure difference switch
Supply only Pressure relief valve
Supply only Filter drier
Supply only Solonoid valve coil
Supply only Compressor oil
Supply only Scroll compressor Model No SM185S4C R22 operaing voltage 380-400 V 3 Phase 50 Hz thermally protected Make : Danfoss
Supply insallaion ,testing & commissioning following Spare parts in replacement for running of the plants of capacity 100 TR complete all as specified and directed:- Make: Blue Star. Crank case heater
Supply only Gasket for oil pump
Supply only Pump oil
Supply only Screen oil filter
Supply only Spring helical part No 029-06143
Supply only Seal O ring
Supply only Spring helical part No 029-13813
Supply only Union unloader
Supply only Solenoid valve
Supply only suction valve
Supply only Discharge Valve
Supply only Pressure relief valve 3/8
Supply only Valve stop 2 5/8
Supply only Sleeve cylinder unloading
Supply only Compessor oil
Misc items Supply and fix in replacement complete factory assembled Control panel suitable for 100 TR blue star condensing unit Model No LCW-100A with PLC/ Micro controller, soft starter , HP /LP/OP cut out, chilled water sensor etc. complete with all accessories to make existing 100 TR unit in fully functional stage complete all as specified and directed.
Rewinding of electric motor (Burnt stator) of any make & type of Compessor/pump/AHU/ blower motor with suitable guage of super enameled copper conductor including winding with fibre cloth/PVC insulated winding paper, superior quality varinshing, servicing of ball bearing, suitable main connections from coil to terminal box. M&L for disconnecting US burnt motor from the existing loction , transporting to workshopand opening of motor, cutting/removing old burnt winding coils, cleaning/filing the starter slots, necessary mechinical works for shaft/bearing housing, preparing and inserting coils running/starting winding, interconnecting, fixing, soldering, jointing, heating, drying up coils, connection at site, to and from transportation, testing at site, replacing new connection terminal plate of following sizes satisfactorily running complete all as specified and directed. Electric induction motor upto 10 HP
`-ditto- all as per item No 10 above but Electric induction motor upto 15 HP
`-ditto- all as per item No 10 above but Electric induction motor upto 20 HP
`-ditto- all as per item No 10 above but Electric induction motor upto 30 HP
`-ditto- all as per item No 10 above but Electric induction motor upto 60 HP
`-ditto- all as per item No 10 above but Electric induction motor upto 100 HP
Rewinding of electric motor (Burnt stator) of any make & type of CT fan motor with suitable guage of super enameled copper conductor including winding with fibre cloth/PVC insulated winding paper, superior quality varinshing, servicing of ball bearing, suitable main connections from coil to terminal box. M&L for disconnecting US burnt motor from the pump, transporting to workshopand opening of motor, cutting/removing old burnt winding coils, cleaning/filing the starter slots, necessary mechinical works for shaft/bearing housing, preparing and inserting coils running/starting winding, interconnecting, fixing, soldering, jointing, heating, drying up coils, connection at site, to and from transportation, testing at site, replacing new connection terminal plate of following sizes satisfactorily running complete all as specified and directed. Electric induction motor upto 10 HP
Repair and Maintenence of Centrifugal / Monoblock pump sets of following capacities installed at various AC plants by opening, checking for faults, filling of new graphite gland packing, fixing and replacement of unservicable parts and reassembling after repair and testing complete of following capacities of pumps sets complete all as specified and directed. Note :-cost of replacement of spare if any such as impeller , bearing & bush is deemed to be included in quoted rates. Pump of capacity upto 10 HP
`-ditto- all as per item No 17 above but Pump of capacity 15 HP
Supply and Fix in replacement strip heater of capacity 3 KW , AC single phase heater bank 36 KW for winter heating complete all as specified and directed..
Supply and fix in replacement of V belt suiteable for AHU install at various location complete all as specified and directed. Make :- Micro/Navyug/Omfa rubbers Pvt Ltd/FENNER
M&L for taking out all old US eliminator from cooling tower of capacity upto 200 TR & Fixing in replacement of eliminator of cooling tower upto 200 TR complete all as specified and directed.
M&L for taking out all old US PVC fills from cooling tower of capacity upto 200 TR & fixing in replacing new PVC fills in replacement complete into the cooling tower, complete all as specified and directed.
M&L for taking out all old US control power contractor & fixing in replacement AC Control Power Contactor suitable for 100 TR compessor (220V-AC Coil Voltage) complete all as specified and directed.
M&L for taking out all old US Auxalary Contacts & fixing Auxalary Contacts A-3 415V 50 Hz - 3TS34 00-0A… 8K complete all as specified and directed. Make :- Seimens or equivalent as approved by the accepting officer.
Supply &fix pre-filters of size 650mm X650mm X50 complete all as specified and directed.
S & F Pre-Filters 650mm X350mm X50 complete all as specified and directed.
M&L for detecting any leakage in the system before charging including replacing of copper pipe & charging of refrigerant gas R-22 in package AC and testing and commisioning complete all as specified and directed. Note : Copper pipe required for charging, cost of the same shall be deemed to be included in cost of this item.
Supply only On/Off RYB LED indicator lamp complete all as specified and directed.
M/s Yash Trading Company
BRITE INDUSTRIES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .