Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 CrQualified 144 WARD NO 8 DADLANA PANIPAT PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹8.9 Cr | L1 | Qualified |
| 2 | L2₹8.9 Cr+₹1.0 L (0.12%)Qualified 0 0 DADLANA PANIPAT PANIPAT VILLAGE TOWN DADLANA CITY PANIPAT KARNAL HARYANA 132140 INDIA | PANIPAT | HARYANA | 132140 | ₹8.9 Cr+₹1.0 L (0.12%) | L2 | Qualified MSE, Category: General |
| 3 | L3₹8.9 Cr+₹2.6 L (0.29%)Qualified B 505 ANSAL SUSHANT CITY PANIPAT PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹8.9 Cr+₹2.6 L (0.29%) | L3 | Qualified MSE, Category: General |
| 4 | L4₹9.0 Cr+₹13.4 L (1.50%)Qualified KALIJHORA KALIJHORA BAZAR KALIJHORA BAZAR KALIJHORA BAZAR DARJEELING WEST BENGAL 734008 | DARJEELING | WEST BENGAL | 734008 | ₹9.0 Cr+₹13.4 L (1.50%) | L4 | Qualified MSE, Category: General |
| 5 | L5₹9.1 Cr+₹20.3 L (2.28%)Qualified 6A PRATHMESH MARKET NEAR SAINIK DHABA RAIBARELI ROAD LUCKNOW LUCKNOW UTTAR PRADESH 226025 | LUCKNOW | UTTAR PRADESH | 226025 | ₹9.1 Cr+₹20.3 L (2.28%) | L5 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
5 Oct 2023, 7:00 pmClosed
RMC Of M-30 With Cement Content 410 Kg Per Cum
RMC Of M-20 Using In Proportion Of As Per ATC PAGE NO 29 TO 30
RMC Of M-15 As Per ATC PAGE NO 29 TO 30
RMC M-10 As Per ATC PAGE NO 29 TO 30
RMC Of M-5 As Per ATC PAGE NO 29 TO 30
5349205
GEM/2023/B/3983397
Two Packet Bid
RMC of M-30 with cement content 410 Kg per Cum,RMC of grade M30 using 20 mm down coarse aggregate i
90 days
Haryana; Panipat
Total value wise evaluation
BOQ
Exempted
5 Oct 2023
20 Sept 2023
5 Oct 2023
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | RMC of M-30 with cement content 410 Kg per Cum | Supply Delivery of RMC of M-30 using Cement of approved make Manufacture with cement content 410 Kg per Cum. as per based on the approved Design mix including cost of materials royalty cost of transportation from the Plant and delivering the same at B AND R IOCL Project site Panipat | 9,000 | CUM | [email protected] | 90 |
| 2 | RMC of grade M30 using 20 mm down coarse aggregate including bipolar corrosion as per technical specifications as per IS 456 REFER ATC SL NO 2 | Supply Delivery of RMC inhibiting admixture dosage as per manufacturers specifications paid separately with cement content maximum 380 kg per cum and maximum water cement ratio 0.45 all as per based on the approved Design mix including cost of materials royalty cost of transportation from the Plant and delivering the same by the deployment of Boom placer Concrete pump Direct Manual in case the Transit Mixture fails to deliver the concrete in pouring location at B AND Rs IOCL Project site Biopolar will be supplied by B AND R free of cost but the pouring and mixing will be the scope of the RMC vender and the same will be reflected in each Batch Report ptoduced by vendor at the time of despatch of RMC materials from Batching Plant | 7,500 | CUM | [email protected] | 210 |
| 3 | RMC of M-20 using in proportion of as per ATC PAGE NO 29 TO 30 | Supply Delivery of RMC Cement of with a cement content on standard volumetric analysis maximumn 400 kg per cum approved make Manufacture with cement content 400 Kg per Cum. including cost of materials royalty cost of transportation from the Plant and delivering the same at BandR IOCL Project site Panipat | 150 | CUM | [email protected] | 150 |
| 4 | RMC of M-15 as per ATC PAGE NO 29 TO 30 | Supply Delivery of RMC of M-15 in proportion of 1 cement 2 sand 4 crushed stone aggreged with a cement content on standard volumetric analysis maximumn 314 kg percum. by using Cement of approved Manufacture the including cost of materials royalty cost of transportation from the Plant and delivering the same at B AND R IOCL Project site Panipat | 150 | CUM | [email protected] | 150 |
| 5 | RMC M-10 as per ATC PAGE NO 29 TO 30 | Supply and Delivery of RMC M-10 in proportion of 1 cement 3 sand 6 crushed stone aggreged with a cement content on standard volumetric analysis maximumn 250 kg per cum. by using Cement of approved Manufacture the including cost of materials royalty cost of transportation from the Plant and delivering the same at B AND R s IOCL Project site Panipat | 50 | CUM | [email protected] | 150 |
| 6 | RMC of M-5 as per ATC PAGE NO 29 TO 30 | Supply and Delivery of RMC of M-5 in proportion of 1 cement 5 coarse sand 10 crushed stone aggreged with a cement content on standard volumetric analysis maximumn 150 kg per cum.by using Cement of approved Manufacture the including cost of materials royalty cost of transportation from the Plant and delivering the same at B AND R IOCL Project site Panipat | 600 | CUM | [email protected] | 210 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_5349205.pdf
GEM_BID
tender_2023-09-20-09-41-17_44414b40bbf60ef8e723099e10adddd5.pdf
BOQ
boq_item_sample_file_2023-09-20-09-41-17_ca840d694fd297d582851c4dc7b3394e.csv
BOQ
TENDER_b22820b5-1361-4acb-af831695183421573_saha.utpal@bridgeroof.co.in.docx
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .