| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 CrAccepted-AOC 14 BILASIPARA P O P S BILASIPARA DIST DHUBRI ASSAM PIN 783348 | DHUBRI | ASSAM | 783348 | ₹29.8 Cr | L1 | Accepted-AOC AWARDED |
| 2 | L2₹32.8 CrRejected-AOC | ₹32.8 Cr | L2 | Rejected-AOC Not Qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹37 L
Closing Date
26 Feb 2025, 4:00 pmClosed
CHIEF ENGINEER, WRD, ASSAM
Office of the Chief Engineer, Water Resources Department, 5th Floor, Assam Water Centre, Kundil Nagar, Basistha City Guwahati Postal Code 781029 Country India
W9-LBS Additional high priority underwater riverbank protection works (Section 1) and above water riverbank protection works (Section 2) in Lakhimpur (Dhakuwakhana, Bonpuroi), Biswanath and Sonitpur Districts, LOT 1
2025_WREAP_42411_1
WRD/ADB/OCB-Works/07
Open Tender
Civil Works
LAKHMPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹37 L
Yes
GUWAHATI
1 Jul 2025
30 Jan 2025
26 Feb 2025
30 Jan 2025
26 Feb 2025
22 Feb 2025
30 Jan 2025 - 11 Feb 2025
11 Feb 2025
Amount
SECTION 1: FOR UNDER WATER WORKS AND TEMPORARY PROTECTION OF SLOPES I. FOR UNDERWATER WORKS
Carriage of Geo Bags type-C of size 1.5x 1.0 m including loading & unloading, Stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed. Distance from Divisional Store to Work Site = 10KM
Filling and laying of Geo bags type-C of size 1.5m X 1.0m including excavation of sand/silt from flood plain or adjacent chars within a distance of 90m of the work site, filling geo bags with sand/silt having minimum weighing 330 Kg and minimum volume 0.221 cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150m and laying properly as directed. (sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost) With Mar Boat
Filling and laying of Geo bags type-C of size 1.5m X 1.0m including excavation of sand/silt from flood plain or adjacent chars within a distance of 90m of the work site, filling geo bags with sand/silt having minimum weighing 330 Kg and minimum volume 0.221 cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150m and laying properly as directed. (sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost) Without Boat
II. FOR TEMPORARY PROTECTION OF SLOPE
Carriage of 300 gsm Geo sheet of including loading & unloading, stacking cost of P.O.L. etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed. (Distance to be calculated from Divisional Store) Distance from Divisional Store to Work Site = 10KM
Labour charge for laying Geo fabric sheet as filter bellow pitching including carrying, lapping, wrapping & stitching as directed by the Engineer-in-Charge.
Carriage of Geo Bags of size 1.03 × 0.70 m / 1.0 x 0.7m including loading & unloading, stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed. (Distance to be calculated from Divisional Store) Distance from Divisional Store to Work Site = 10KM
Filling and laying of Geo bags of size 1.03 m × 0.70 m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly as directed. (Sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost) Without Boat
Earth work in excavation of drainage channel to the proper grade and slopes as required including disposing the excavated debris/soil to a safe distance of minimum 50 m distance, etc. complete as directed. For lead up to 50 m and all lifts Normal Soil
Collection and supply of River silt by truck carriage free from debries and other foreign material, etc. complete as directed. By mechanical Means For initial up to 1.00 Km & for all lifts.
SECTION 2: FOR ABOVE WATER WORKS WITH PERMANENT RIVER BANK PROTECTION WORKS
Earthwork in bank trimming to the designed section /slope by manual means including removing the trimmed soils to a minimum distance of 30 m, complete as directed.
Construction and supply of Wire -netting box of size 1.50 m × 1.50 m × 0.45 m made with mechanically woven, double twisted, hexagonal shaped wire mesh with wire made of low carbon, high ductile MS wire with heavy class of galvanization with an additional layer of PVC coating with mesh type of 10 × 12 as per EN 10223 & ASTM A975, mesh wire of 2.70 mm (I.D) /3.70 mm (OD) tensile strength of 450-500/mm2, edge wire selvedge around it at least 2.5 times, lacing wire (Zinc PVC coated) of 2.20 mm (I.D)/3.20 mm (OD), VC coating thickness of 0.50 mm nominal, 0.38 mm minimum, Mesh opening size 150 mm × 150 mm and with average weight per unit being 12 Kg with additional 3% of the weight of box for lacing wire supplied separately, supporting the facing of the box with zinc coated steel wire of required length as directed, complying with ASTM and European norms
Earth work in excavation of drainage channel to the proper grade and slopes as required including disposing the excavated debris/soil to a safe distance of minimum 50 m distance, etc. complete as directed. For lead up to 50 m and all lifts Normal Soil
Carriage of 300 gsm Geo sheet of including loading & unloading, stacking cost of P.O.L. etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed. (Distance to be calculated from Divisional Store) Distance from Divisional Store to Work Site = 10KM
Labour charge for laying Geo fabric sheet as filter bellow pitching including carrying, lapping, wrapping & stitching as directed by the Engineer-in-Charge.
Carriage of Geo Bags of size 1.03 × 0.70 m / 1.0 x 0.7m including loading & unloading, stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed. (Distance to be calculated from Divisional Store) Distance from Divisional Store to Work Site = 10KM
Filling and laying of Geo bags of size 1.03 m × 0.70 m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly as directed. (Sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost) Without Boat
Collection and supply of River silt by truck carriage free from debries and other foreign material, etc. complete as directed. By mechanical Means For initial up to 1.00 Km & for all lifts.
Filling and laying in PVC coated WN Box of size 1.5m x 1.5m x 0.45m with sand/silt filled Geo bags of size 1.03 m × 0.70 m including excavation of sand/silt from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling, double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly in PVC coated WN Box complete as directed. (Geo Bag, PVC coated wire netting box and Polypropylene thread will be supplied by the department free of cost)Without Boat
Earth work in embankment by Mechanical means by truck carriage with locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4 cm cube, dressing as per design section and compaction in layers not exceeding 30 cm in thickness and core cutter soil test at every layer and every 500 m distance, etc. complete as directed. For beyond initial 1 Km & up to 10.00 Km & for all lifts. (For 3km lead)
Earthwork in grabbing the seat of the embankment up-to 0.3 m depth by mechanical means and depositing the soils outside the country side toe of the proposed structures, etc. complete as directed.
B) EMP IMPLEMENTATION COST I) Mitigation Measures
Provision for tree cutting and compensatory plantation (1:10) measures, monitoring and maintenance
Obtaining and submission of copies (to PMU) all consents, permits, clearances, no objection clearances or NOCs, tree cutting permissions, and other relevant permits from various authorities before the start of construction
Disposal of existing old geo-bags and other materials used as temporary anti-erosion and flood protection measures, and disposal of all solid wastes during construction to designated locations and/or use of local municipal services
Provision of all requisite facilities (i.e. drinking water supply, sanitation, domestic solid waste collection and disposal, fuel supply etc.) at construction camps. Ensuring rehabilitation of borrow areas and other impacted lands in line with WRD guidelines, and decommissioning of construction camp before handling over the project.
Traffic management at work sites (i.e. pavement markings, channelizing devices, arrow panels and warning lights) along with construction and/or strengthening of landing ghats for barges
Water sprinkling for dust suppression, barricading, temporary noise barriers, and provision of personal protective equipment (such as boots, life-saving-jackets, etc.)
Implementation of biodiversity action plan and other biodiversity conservation and mitigation measures
Construct temporary alternative ghats and landing facilities. Restore disturbed sites post-construction.
B) EMP IMPLEMENTATION COST II) Monitoring Measures
Air quality monitoring
Noise levels monitoring
Surface water monitoring
Groundwater monitoring
Soil monitoring
B) EMP IMPLEMENTATION COST III) Capacity Building
Training on EMP Implementation, COVID-19 protocols and other health and safety topics
Preparation of plans and protocols (i.e. traffic management plan, waste or spoil management plan, chance find protocol, and other relevant activities)
Biodiversity Assessment
Engagement of one Environment Expert and one OHS Expert for each High Priority Project areas
Brahmaputra Infrastructure Ltd (BID ID -259858)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid