Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.0 L
EMD Value
₹99,858
Closing Date
14 Aug 2026, 3:00 pmClosed
CE KNN
CE OFFICE KNN MOTI JHEEL
Improvement of Road and Drain form H/O Tailor to H/O Puran at Saraswati Nagar in ward 87 Under Zone03
2026_NNKAN_1175698_1
1353/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
45 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,858
11 Sept 2026
10 Aug 2026
14 Aug 2026
10 Aug 2026
14 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W cutting and Filling or ion embankment in ordinary soil exavation to be done pits not exciding 1.5 including all completion of work | 311.85 | cum | 125 | ₹38,981.25 |
| 2 | Earth work in Excavation in trenches for foundations pipes Cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in distance of 50 mtr. | 1 | cum | 170 | ₹169.98 |
| 3 | Providing and laying Cement concrete (1:6:12,1 Cement:6 fine sand:12 Brick ballast nominal size 40mm) and curing complete, including cost of form work in foundation and floors. | 1 | cum | 4,380 | ₹4,379.56 |
| 4 | 12mm Thick Cement plaster1;4 in single coat on Both side of single or half brick wall for interior plasting upto flor two level including internal rounded angles chamfers and/or rounded angles not exceeding 80mm in girth and finishing even and smooth. | 95.76 | sqm | 200 | ₹19,152 |
| 5 | Class-150 Brick workin (1:4) cement mortar in Foundation & Plinth including supply of all Materials Labour and Tool & Plants etc, required for proper completion of the work. | 0.8 | cum | 6,600 | ₹5,280 |
| 6 | Mild steel or Iron in Reinforcement including all completion of work. | - | sqm | 7,200 | - |
| 7 | RCC Work with Cement concrete 1:1.5:3, 1 Cement:1.5 coarse sand:3 stone Agregate incuding all completion of work | - | cum | 8,720 | - |
| 8 | P/L rubber moulded interlocking concrete block with 80 mm thick ICBP having strength not less than 30kn/Sqm complete as per technical specification clause 1500. | - | sqm | 925 | - |
| 9 | Supply and Laying GSB including all labour work. | - | cum | 3,671 | - |
| 10 | Making of Pedastal including all labour work. | - | Nos | 3,840 | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.22 MB
BOQ_2209452.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .