| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-AOC 309 THIRUVA GOUNDANUR BYE PASS SALEM 636 005 | SALEM | SALEM | TAMIL NADU | 636005 | ₹11.6 L Quoted ₹10.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹10.4 LRejected-AOC NO 5 8TH STREET KALAINGAR NAGAR THIRUVOTTIYUR CHENNAI 600 019 | THIRUVALLUR | TAMIL NADU | 600019 | ₹10.4 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | LAKSHMI ENTERPRISES L1 | KR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | MS. Plate 6mm thick, Including loading, transportation & Unloading. Manufacture test certificate shall be furnished.
(Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges) (The material will be supplied by TNPGCL if available at stores during execution of works) | 1.5 | Ton | 85,820 ₹1.3 L | 86,000 ₹1.3 L |
| 2.00 | MS. Plate 3.15mm thick, Including loading, transportation & Unloading. Manufacture test certificate shall be furnished. (Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges) (The material will be supplied by TNPGCL if available at stores during execution of works) | 0.5 | Ton | 83,777 ₹41,888.50 | 84,000 ₹42,000 |
| 3.00 | Metallic expansion joints Size- 2696 X 2467 X 272 mm, Style#02, Full size, Location-ESP inlet (Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges) (The material will be supplied by TNPGCL if available at stores during execution of works) | 3 | Nos | 67,089 ₹2.0 L | 67,100 ₹2.0 L |
| 4.00 | Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from ESP inlet area. | 80 | M² | 190 ₹15,200 | 191 ₹15,280 |
| 5.00 | charges for cutting and removal of heavily eroded duct plates (multilayer) in duct parent plate area, transporting & devoluting scrap to central stores/NCTPS-I | 30 | M² | 1,670 ₹50,100 | 1,671 ₹50,130 |
| 6.10 | Renewal of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's.
Size- 2696 X 2467 X 272 mm, Style#02, Full size, Location-ESP inlet - 8Nos; (5.163 x 2 side x 2 No) = 20.65M required qty = 3 Nos x 20.65M = 61.92M
Removal of existing eroded cover plates and refixing / renewal of new cover plates. Work involves expansion joint inspection and fabrication of protection plate,, cleaning welding. Total labour portion 25%) | 61.92 | M | 1,808 ₹1.1 L | 1,810 ₹1.1 L |
| 6.20 | Renewal / Reconditioning of metallic expansion joints. Work involves arresting the upstream and down stream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's. Total labour portion 75%) | 61.92 | M | 5,419 ₹3.4 L | 5,420 ₹3.4 L |
| 7.00 | Labour charges for welding eroded initial welding joints in the flue gas duct portion and splitter plate area from ESP Inlet . | 70 | M² | 267 ₹18,690 | 268 ₹18,760 |
| 8.00 | Transporting of 6mm MS / Checkeredplates, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct wall after removal of wornout patch plates above 1.5 meter level and welding the same from flue gas duct portion and splitter plate area from ESP Inlet Including cost of consumables and T&Ps. To be quoted on line | 40 | M² | 3,283 ₹1.3 L | 3,284 ₹1.3 L |
Tender Value
Refer Docs
EMD Value
₹10,100
Closing Date
16 Dec 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III ESP Inlet C D Pass Patch up welding work for damaged flue gas duct portion from Mech Hopper top expansion joint to ESP inlet expansion joint ie before splitter assembly
2025_EB_628561_1
CE SE MI NCTPS I 260 25 26
Open Tender
Power/Energy Projects/Products
21 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,100
Yes
7 Mar 2026
3 Dec 2025
17 Dec 2025
3 Dec 2025
16 Dec 2025
3 Dec 2025
Amount
MS. Plate 6mm thick, Including loading, transportation & Unloading. Manufacture test certificate shall be furnished. (Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges) (The material will be supplied by TNPGCL if available at stores during execution of works)
MS. Plate 3.15mm thick, Including loading, transportation & Unloading. Manufacture test certificate shall be furnished. (Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges) (The material will be supplied by TNPGCL if available at stores during execution of works)
Metallic expansion joints Size- 2696 X 2467 X 272 mm, Style#02, Full size, Location-ESP inlet (Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges) (The material will be supplied by TNPGCL if available at stores during execution of works)
Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from ESP inlet area.
charges for cutting and removal of heavily eroded duct plates (multilayer) in duct parent plate area, transporting & devoluting scrap to central stores/NCTPS-I
Renewal of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's. Size- 2696 X 2467 X 272 mm, Style#02, Full size, Location-ESP inlet - 8Nos; (5.163 x 2 side x 2 No) = 20.65M required qty = 3 Nos x 20.65M = 61.92M Removal of existing eroded cover plates and refixing / renewal of new cover plates. Work involves expansion joint inspection and fabrication of protection plate,, cleaning welding. Total labour portion 25%)
Renewal / Reconditioning of metallic expansion joints. Work involves arresting the upstream and down stream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's. Total labour portion 75%)
Labour charges for welding eroded initial welding joints in the flue gas duct portion and splitter plate area from ESP Inlet .
Transporting of 6mm MS / Checkeredplates, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct wall after removal of wornout patch plates above 1.5 meter level and welding the same from flue gas duct portion and splitter plate area from ESP Inlet Including cost of consumables and T&Ps. To be quoted on line
KR CONTRACTOR (BID ID -1533647)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_751576.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid