| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAdmitted-Finance | ₹10.2 L | L1 | Admitted-Finance |
| 2 | L2₹11.2 LAdmitted-Finance | ₹11.2 L | L2 | Admitted-Finance |
| 3 | L3₹12.4 LAdmitted-Finance | ₹12.4 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Muniappan Contractor L2 | KIRUBAKARAN V L1 | K.ANBU CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of existing R.C.C concrete, the rates including labour charges etc., as per standard specification. | 18 | Cum | 4,500 ₹81,000 | 3,217.5 ₹57,915 Lowest | 4,800 ₹86,400 |
| 2.00 | Dismantling of existing ISMB beams, the rates including labour charges ect., as per standard specification. | 4 | MT | 27,500 ₹1,10,000 | 8,415 ₹33,660 Lowest | 30,000 ₹1,20,000 |
| 3.00 | Making through holes in plain or Reinforced cement concrete with Diamond core drilling system by using power tools of following diameter – Depth per CM. 100mm dia | 24 | NOS | 300 ₹7,200 Lowest | 320.76 ₹7,698.24 | 400 ₹9,600 |
| 4.00 | 4a) Centering with shuttering and soffits for reinforced cement concrete items complete complying with standard specifications and as directed by the Engineers in charge of the works. For Roof beam and Slab – First Stage | 182 | Sqm | 1,250 ₹2,27,500 | 1,039.5 ₹1,89,189 Lowest | 1,500 ₹2,73,000 |
| 5.00 | 4b) Strutting to centering every additional 1 meter | 3 | Rmt | 106 ₹318 Lowest | 158.4 ₹475.2 | 125 ₹375 |
| 6.00 | Supplying, fabricating and placing in position of MS/RTS rods including cost of steel and binding wire including cleaning the rods bending straightening cutting and fabricating and tying grills in position etc., complete for all reinforced cement concrete complying with the standard specifications and as directed by the Engineers. | 3.5 | MT | 85,000 ₹2,97,500 | 81,180 ₹2,84,130 Lowest | 95,000 ₹3,32,500 |
| 7.00 | Providing and laying reinforced cement concrete 1:2:4 (One cement, two sand & Four aggregate ) mix using 20mm HBG stone jelly approved quality centering strutting and the cost of reinforcement grills in position but including machine mixing laying ramming consolidating etc., using mechanical vibrators with all leads and lift for materials and concrete complete finishing curing & also fixing the fan clamps in RCC work wherever necessary etc., complying with the standard specification and as directed by the department Engineers.
For Roof beam and Slab. | 35 | Cum | 9,100 ₹3,18,500 Lowest | 10,692 ₹3,74,220 | 9,500 ₹3,32,500 |
| 8.00 | Finishing the exposed surface of R.C.C with Cement mortar 1:3, 10mm tk, complying with the standard specifications and as directed by the departmental Engineers. | 182 | Sqm | 358 ₹65,156 | 346.5 ₹63,063 Lowest | 400 ₹72,800 |
| 9.00 | White washing two coats using best fresh burnt white shell lime fevicol type gum, brushes and scaffolding charges etc., complete complying with standard specification. | 182 | Sqm | 75 ₹13,650 | 54.45 ₹9,909.9 Lowest | 85 ₹15,470 |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
15 Jul 2026, 11:00 amClosed
ADMINISTRATOR
VELLORE CO-OP. SUGAR MILLS LTD,. AMMUNDI Katpadi tk, Vellore -632519
Reconstruction of Damage RCC roof at Sulphur burner area with existing column
2026_TNCSF_681624_1
VCSM_ 1697_2026_B2
Open Tender
Miscellaneous Works
Works
45 days
VELLORE CO-OP. SUGAR MILLS LTD, . AMMUNDI Katpadi
Experiences for past three years in sugar industries
8 documents required · 8 mandatory
₹1,000
₹14,000
Yes
25 Jul 2026
18 Jun 2026
16 Jul 2026
18 Jun 2026
15 Jul 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing R.C.C concrete, the rates including labour charges etc., as per standard specification. | 18 | Cum | 10 | ₹180 |
| 2 | Dismantling of existing ISMB beams, the rates including labour charges ect., as per standard specification. | 4 | MT | 10 | ₹40 |
| 3 | Making through holes in plain or Reinforced cement concrete with Diamond core drilling system by using power tools of following diameter – Depth per CM. 100mm dia | 24 | NOS | 10 | ₹240 |
| 4 | 4a) Centering with shuttering and soffits for reinforced cement concrete items complete complying with standard specifications and as directed by the Engineers in charge of the works. For Roof beam and Slab – First Stage | 182 | Sqm | 10 | ₹1,820 |
| 5 | 4b) Strutting to centering every additional 1 meter | 3 | Rmt | 10 | ₹30 |
| 6 | Supplying, fabricating and placing in position of MS/RTS rods including cost of steel and binding wire including cleaning the rods bending straightening cutting and fabricating and tying grills in position etc., complete for all reinforced cement concrete complying with the standard specifications and as directed by the Engineers. | 3.5 | MT | 10 | ₹35 |
| 7 | Providing and laying reinforced cement concrete 1:2:4 (One cement, two sand & Four aggregate ) mix using 20mm HBG stone jelly approved quality centering strutting and the cost of reinforcement grills in position but including machine mixing laying ramming consolidating etc., using mechanical vibrators with all leads and lift for materials and concrete complete finishing curing & also fixing the fan clamps in RCC work wherever necessary etc., complying with the standard specification and as directed by the department Engineers.
For Roof beam and Slab. | 35 | Cum | 10 | ₹350 |
| 8 | Finishing the exposed surface of R.C.C with Cement mortar 1:3, 10mm tk, complying with the standard specifications and as directed by the departmental Engineers. | 182 | Sqm | 10 | ₹1,820 |
| 9 | White washing two coats using best fresh burnt white shell lime fevicol type gum, brushes and scaffolding charges etc., complete complying with standard specification. | 182 | Sqm | 10 | ₹1,820 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_819196.xls
BOQ • 0.29 MB
extt.pdf
PDF • 0.54 MB
ext.pdf
PDF • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].