Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAccepted-AOC | ₹19.4 L | L1 | Accepted-AOC FIRST |
| 2 | L2₹19.5 L+₹7,064.58 (0.36%)Rejected-AOC | ₹19.5 L+₹7,064.58 (0.36%) | L2 | Rejected-AOC SECOND |
| Sl No | Description | Qty | Unit | J.R.B. ENTERPRISES L1 | SEEMAX AGGREGATE AND CONCRETE L2 |
|---|---|---|---|---|---|
| 1.00 | kassi work Undressed involving and average horizontal throw upto 2.0 meter and an average vertical lift upto 0.5 meters including breaking of clods. | 115.6 | cum | 83.12 ₹9,608.67 Lowest | 90 ₹10,404 |
| 2.00 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. | 407.41 | cum | 117.83 ₹48,005.12 Lowest | 120 ₹48,889.2 |
| 3.00 | Dressing of New Earthwork | 2,039.09 | sqm | 3.1 ₹6,321.18 | 1.2 ₹2,446.91 Lowest |
| 4.00 | Earth work (exclusive of compensation for earth) in excavation in ordinary soil or soil containing gravel or kankar upto 40% and filling in 15 cm layers in foundation and plinth including ramming watering and consolidating under floors with earth brought from a distance not exceeding 30 metres. | 65.56 | cum | 174.9 ₹11,466.44 | 151 ₹9,899.56 Lowest |
| 5.00 | Dag belling single kassi stroke minimum 7.5 cm depth. | 3.36 | km | 884.07 ₹2,970.48 | 700 ₹2,352 Lowest |
| 6.00 | Dressing of Bed and Preparation of Sub-grade for Lining | 1,132.44 | sqm | 13.11 ₹14,846.29 | 10.83 ₹12,264.33 Lowest |
| 7.00 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls foundation plinth | 261.69 | cum | 5,977.25 ₹15,64,186.55 Lowest | 6,000 ₹15,70,140 |
| 8.00 | 10 mm thick Cement Plaster 1:4 on Side Walls | 775.98 | sqm | 157.02 ₹1,21,844.38 Lowest | 171 ₹1,32,692.58 |
| 9.00 | 10 mm thick Cement Plaster 1:4 on Floors | 1,115.96 | sqm | 132.78 ₹1,48,177.17 Lowest | 135 ₹1,50,654.6 |
| 10.00 | Providing & Laying Brick Bats | 3.85 | cum | 1,070.07 ₹4,119.77 | 700 ₹2,695 Lowest |
Tender Value
₹18.5 L
EMD Value
₹37,032
Closing Date
19 Mar 2026, 12:00 pmClosed
Xen Gurdaspur UBDC
Executive Engineer/ Gurdaspur Canal and Ground Water Division WRD,Punjab
Estimate for construction of water course at outlet RD 24990/ R of Gazikot Distributary under jurisdiction of Tibri Sub Division
2026_WR_157258_3
45/110A
Open Tender
Civil Works - Canal
Item Rate
90 days
GURDASPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹37,032
27 Apr 2026
13 Mar 2026
19 Mar 2026
13 Mar 2026
19 Mar 2026
13 Mar 2026
kassi work Undressed involving and average horizontal throw upto 2.0 meter and an average vertical lift upto 0.5 meters including breaking of clods.
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods.
Dressing of New Earthwork
Earth work (exclusive of compensation for earth) in excavation in ordinary soil or soil containing gravel or kankar upto 40% and filling in 15 cm layers in foundation and plinth including ramming watering and consolidating under floors with earth brought from a distance not exceeding 30 metres.
Dag belling single kassi stroke minimum 7.5 cm depth.
Dressing of Bed and Preparation of Sub-grade for Lining
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls foundation plinth
10 mm thick Cement Plaster 1:4 on Side Walls
10 mm thick Cement Plaster 1:4 on Floors
Providing & Laying Brick Bats
Supplying of RCC Shutter with One Extra Frame for Nakka and Branch Offtakes
Fixing of Shutter and Frames for Nakka and Branch Offtakes
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_331208.xls
BOQ • 0.29 MB
cori2499020032026.pdf
PDF • 0.51 MB
recorr19032026.pdf
PDF • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .