Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹2.1 L+₹4,203.16 (2.00%)Rejected-Finance | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹2.2 L+₹7,906 (3.76%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹2.1 L
EMD Value
₹2,700
Closing Date
29 Dec 2023, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Repairing Hydrulic test and fitting with Commissioning of Lancashire Boiler No WBL 11049 of Kumardihi B Colliery under Bankola Area.
2023_ECL_296512_1
ECL/GM/BA/E TENDER/23-24/EnM/194 Dt. 19.12.2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹2,700
26 Dec 2024
19 Dec 2023
30 Dec 2023
19 Dec 2023
29 Dec 2023
19 Dec 2023
19 Dec 2023 - 23 Dec 2023
Amount
Item Description/ Heading
Old both side fusible plug opening boring threding labour charges
new fusible plug both side & same position fitting with IBR TC
Boiler all valve mounting repairing , overhauling & instection by boiler inspector with consumable & Labour charges
isolated peeting of different shell strake to be build up by MMAW Process using low hydrogen electrode and grind smooth
Complete bricks work of both side flue pass , bottom of the boiler both side furnace with materials & labour charges
Fabrication & fitting of fire bar of L/Boiler at both side furnace with cost of electrode
Supply & fitting of 20" long 3/4 dia gaguge glass tube
Breaking of damaged portion lafthand side refectory work & resetting of the same after necessary repairing A) Fire bricks 200 no.B) Fire clay 3 bag
Lancashire boiler hydrulic test arrangement by inspector ( Director of Boiler )
Lancashire boiler fitting purches materials tape joint , cotton tape , steam joint , hole tight , nut , bolt rubber joint , fiber bush , rubber cone gauge glass etc .
Lancashire boiler fitting commissioning steaming & running condition with consumable & labour charges
Total impact of GST for the purpose of CTC
GT ENTERPRISE
SABIR CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .