Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹15.3 L
EMD Value
₹15,400
Closing Date
27 Nov 2026, 3:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
ZONAL OFFICER 13
NO 115, Dr Muthulakshmi Salai Adyar Ch-20
Accorded for attending Patchwork at various interior BT and CC roads in division-176,177 and 178, Unit-39, Zone-13.
2026_CoC_728152_1
Z.O.13.C.No.C1/7551-4/2026
Open Tender
Civil Works - Others
Works
90 days
ADYAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,400
19 Nov 2026
19 Nov 2026
27 Nov 2026
19 Nov 2026
27 Nov 2026
19 Nov 2026
60 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Division - 176
Sectioning The Site Including Cutting Heavy Undulation and Levelling Etc Complete | 741 | SQM | 27.56 | ₹20,421.96 |
| 2 | Providing Tack Coat 2.0 kg/10 m2 with Bitumen Emul...able only if the work is carried out during NIGHT) | 741 | SQM | 35.47 | ₹26,283.27 |
| 3 | Providing and laying Bituminous Concrete to 40 mm ...ble Only If the work is carried out during night | 741 | SQM | 661.2 | ₹4,89,949.2 |
| 4 | Division - 177
Providing and laying Tack coat over the existing bituminous surface using 2.0 kgs of bitumen emulsion | 836 | SQM | 40.21 | ₹33,615.56 |
| 5 | Providing and laying Bituminous Concrete to 40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 bitumen (Procured from State/Central Public sector undertakings only) for premixing per 10 sqm including cost and conveyance of all materials | 836 | SQM | 673.74 | ₹5,63,246.64 |
| 6 | Division -178
Earth work excavation of foundation in all kinds ... Iling the sides with excavated earth etc. Complete | 54 | CUM | 199.33 | ₹10,763.82 |
| 7 | Carting away the surplus earth and debris to a lea...Corporation Land as directed during the execution. | 54 | CUM | 206.4 | ₹11,145.6 |
| 8 | providing and laying, spreading and compacting gra...es etc., complete as per clause 406 of MORTH Rev-5 | 33 | CUM | 2,709.1 | ₹89,400.3 |
| 9 | Providing and laying in position, standarded concr... The department for the excess usage of Materials) | 24 | CUM | 9,028.08 | ₹2,16,673.92 |
| 10 | Providing and laying Tack coat over the existing b...able only if the Work is carried out during NIGHT) | 102 | SQM | 40.21 | ₹4,101.42 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
doc2.pdf
Tender Documents • 1.71 MB
BOQ_873968.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .