Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.8 L+₹1.8 L (13.0%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹21.2 L+₹7.2 L (51.8%)Rejected-AOC NO S 7 2ND CROSS 2ND MAIN KEB LAYOUT SANJAYANAGAR BANGALORE 560094 | BENGALURU URBAN | KARNATAKA | 560094 | L3 | Rejected-AOC L3 |
Tender Value
₹18 L
EMD Value
₹36,000
Closing Date
8 Sept 2020, 6:00 pmClosed
Shri Vineet Modi
CWE AF North Bangalore Bellary Road JC Nagar Post Bangalore 560006
COMPREHENSIVE MAINT OF AC PLANT OF 02x120 TR AND 03x20 TR INCLUDING REPLACEMENTS OF SPARES AT CHAF BANGLORE
2020_MES_366992_1
87497CWEAFNBAN
Open Tender
Miscellaneous Works
Item Rate
330 days
GE AF BANGALORE
AS PER NIT
5 documents required · 5 mandatory
₹500
GE AF BANGALORE
₹36,000
Yes
21 Nov 2020
6 Aug 2020
10 Sept 2020
6 Aug 2020
8 Sept 2020
26 Aug 2020
7 Aug 2020 - 17 Aug 2020
Amount
Comprehensive maintenance of central type air conditioning plant capacity 20 TR comprising the installed machineries and accessories mainly compressor 3 x 20 TR SMC 6-65 model (50% stand by) make:- Accel , belt driven electric motors 12.5 HP - 3 Nos make:- Brown Boweri, condenser- 2 Nos mono block pumping set, Air handling unit - 1 Nos. with belt driven motor, blowers air filters, shaft assembly, cooling coil expansion valve FRP cooling tower etc. completely cleaning removing the dust particles servicing replacement of all the worn out parts, greasing, charging of refrigerant (R-22) etc all as required for the efficient , smooth and satisfactorily functioning all as directed by the Engineer in charge.(location :- Family Wing complex.) Note : 1. Following works are inclusive with this comprehensive maintenance for day to day functioning of AC plant in all respects all as directed by Engineer-in-charge. 2. The contractor is responsible to carry out general servicing, other repairs and charging gas etc by AC plant Original manufacturers Engineers / technicians or their authorized distributor/ dealer/channel partner Engineers/technicians only. 3. The cost for labour element is to be included in the comrehensive maint amount for Items No. 20 to 28, 34 to 36 and 40 however the items shall be measured and paid as SUPPLY only as per site requirements and the same shall be purchased from original manufacturers/ authorized distributor /dealers and GST purchase vouchers along with manufacturers warranty cert duly defaced/signed by contractor, JE and Engineer-in-charge shall be submitted to Deptt during payment claims for verification, scrutiny, passing of bill and future record purpose.4. A record to be maintained in the register for each visit and the details of repairs/replacement spare parts duly signed by Engineer-in-charge and contractor and the same to be produced at the time of payment claims. (a)Open type AC Plant 20 TR (i) Cleaning electrical control panel & mechanical parts (ii)Checking control panel ,control boards,transducers(iii)Compressor & motor belt alignment checking (iv) Check oil level in the compressor(v)Inspecting the unit for leaks with a soap solution(vi)Inspect entire system for any unusual conditions such as noise, vibration,etc(vii)Check evaporator and condensor approach(viii)Inspect all safety controls and adjust if required(ix)Inspect all operating control and sequence of operation(x) Motor insulation check(xi)Top up refrigerant gas (R-22) if required (b)AHUs (i) Cleaning electrical control panel & mechanical parts (ii)Blower & motor greasing(iii)Air filter cleaning(iv)Inspect entire system for any unusual conditions such as noise, vibration,etc(v)Check evaporator coil air flow(vi)Inspect all safety controls and adjust if required(vii)Cleaning of evaporator coil(vii)Motor insulation checks (c)Cooling tower (i) Verify the balance and cleanliness of the return water through distribution boxes (ii)Verify the proper operation of the bypass valve(iii)Verify proper and smooth operation of fan (iv) Verify clean basin and stainers (v) Cleaning spray nozzles & frills clearing Air filter cleaning(vi)Inspect entire system for any unusual conditions such as noise, vibration,etc(vii)Check evaporator coil air flow(viii)Inspect all safety controls and adjust if required(ix)Cleaning of evaporator coil(x)Motor insulation checks
Taking down existing unserviceable compressor of Make - ACCEL of 3 x 20TR from the plant, dismantling all parts, transporting to work shop, replacement of worn out and unserviceable parts complete all as directed by Engineer-in-charge. Note - 1. Spares shall be measured and paid separately under relevant item here-in-after. 2. The firm is responsible to get repair the compressor from the original manufacturers/ authorized manufacturer distributor/dealer only.
Supply only Main bearing front and rear end
All as per item No 03 above but Cylinder liner.
All as per item No 03 above but Connecting rod.
All as per item No 03 above but Discharge valve assembly.
All as per item No 03 above but Piston assembly.
All as per item No 03 above but Oil pump gear wheel with bush..
All as per item No 03 above but Rocker arm frame.
All as per item No 03 above but Oil fitler.
All as per item No 03 above but Suction strainer.
All as per item No 03 above but Gasket Set.
All as per item No 03 above but Crank Shaft.
All as per item No 03 above but SV Reed.
All as per item No 03 above but CR Bearing.
All as per item No 03 above but Aluminium Washer Set.
All as per item No 03 above but CR Nut and Bolt.
All as per item No 03 above but O Ring Set.
All as per item No 03 above but SV Spring.
Supply only in replacement liquid line valve for3x20TR plant complete all as directed by Engineer-in-charge.
Supply only in replacement solenoid valve for 3x20TR plant complete all as directed by Engineer-in-charge.
Supply only in replacement expansion valve for 3x20 TR plant complete all as directed by Engineer-in-charge.
Supply only in replacement driving belt as per existing size for the compressor driving motor / AHU driving motor of the plant 3x20 TR complete all as directed by Engineer-in-charge.
Supply only in replacement HP Cut out for 3x20 TR plant complete all as directed by Engineer-in-charge.
Supply only in replacement LP cut out for 3x20 TR plant complete all as directed by Engineer-in-charge.
Supply only in replacement Oil pressure cut out for 3x20 TR plant complete all as directed by Engineer-in-charge.
Supply only in replacement compressor oil for 3x20TR complete all as directed by Engineer-in-charge.
Supply only in replacement Oil pump assembly complete all as directed by Engineer-in-charge.
Supply and fixing in replacement of DOL starter for pump set upto 3 HP complete all as directed by Engineer-in-charge.
Material and labour for carefully opening the motor of compressor for repairs and servicing, shifting to local work shop, taking out the burnt windings, cleaning of slots and rewinding the same with copper winding wire of existing gauge and quantity heating applying shellac varnish to the windings, replacing insulating materials as required baking up and assembling back including replacing the bearings bushes using hydraulic pressure for 12.50 HP capacity 380/415 volt, 3 phase 50 HZ complete all as directed by Engineer-in-charge.
All as per item No.30 Above but 3 HP capacity for AHU/Condensers 380/415 volt, 3 phase 50 HZ complete all as directed by Engineer-in-charge.
All as per item No.30 Above but 2 HP capacity for cooling tower 380/415 volt, 3 phase 50 HZ complete all as directed by Engineer-in-charge.
Material and labour for taking out the monoblock pumping set 3 HP from the foundation after disconnecting and dismantling the water supply inlet and out let and plug it off, repairs and replacement of bearing/bushes impellar and install at site replacement of corroded base plate tesing for its satisfactory performance of mono block pump set, transporting to workshop and back after necessary repairs complete all as directed by Engineer-in-charge.
Supply only over load relay of range 10 to 16 Amps ML1.5 starter with coil voltage 415 volt complete all as directed by Engineer-in-charge.
Supply only starter timer suitable for ML1.5 starter complete all as directed by Engineer-in-charge.
Supply only contactor assembly suitable for ML 1.5 starter complete all as directed by Engineer-in-charge.
Supply and fixing automatic star delta starter of compressor motor 12.5 HP in the existing pockets of the panel board and replacement of cables for connections required and testing complete all as directed by Engineer-in-charge.
Material and labour for painting with super Synthetic enamel paint two coats after cleaning and scrapping out the surface as required to machineries and accessories to the plant air conditioning central type 3x20 TR including one Nos. AHUs , condensor 03 Nos , compressor-03 Nos ,compressor motor -03 Nos ,Pump-02 Nos, Liquid line, discharge lines , suction line approx 25 mtr complete all as directed by Engineer-in-charge.
Supply and fixing CI Sluice Valve 65 mm dia both ends flanged PN 1.0 complete with jointing materials including complete all as directed by Engineer-in-charge.
Supply only charging of refrigerant (R-22).for 3x20TR plant complete all as directed by Engineer-in-charge.
Comprehensive maintenance of central type air conditioning plant capacity 2x120 TR comprising the installed machineries and accessories as and when ordered as in preventive maintenance mainly compressor 2 x 120 TR ERDX120 2P model (50% stand by) make:- Voltas , belt driven electric motors 12.5 HP - 2 Nos , condenser- 2 Nos mono block pumping set, Air handling unit - 7 Nos. with belt driven motor, blowers air filters, shaft assembly, cooling coil , expansion valve FRP cooling tower etc. completely cleaning removing the dust particles servicing replacement of all the worn out parts greasing, charging of refrigerant (R-134a) etc all as required for the efficient , smooth and satisfactorily functioning all as directed by the Engineer in charge.(location :- OT complex.) Note : 1. Following works are inclusive with this comprehensive maintenance for day to day functioning of AC plant in all respects all as directed by Engineer-in-charge. 2. The contractor is responsible to carry out general servicing, other repairs and charging gas etc by AC plant Original manufacturers Engineers / technicians or their authorized distributor/ dealer/channel partner Engineers/technicians only. 3. The cost for labour element is to be included in the comprehensive maint amount for Items No. 58,59,85,89,90,96 and 97 however the items shall be measured and paid as SUPPLY only as per site requirements and the same shall be purchased from original manufacturers/ authorized distributor /dealers and GST purchase vouchers along with manufacturers warranty cert duly defaced/signed by contractor, JE and Engineer-in-charge shall be submitted to Deptt during payment claims for verification, scrutiny, passing of bill and future record purpose.4. A record to be maintained in the register for each visit and the deatils of repairs/replacement spare parts duly signed by Engineer-in-charge and contractor and the same to be produced at the time payment claims. (a)Chiller AC Plant 2x120 TR (i) Cleaning electrical control panel & mechanical parts (ii)Checking microprocessor control panel ,control boards,transducers(iii)Compressor & motor belt alignment checking (iv) Check oil level in the compressor(v)Inspecting the unit for leaks with a soap solution(vi)Inspect entire system for any unusual conditions such as noise, vibration,etc(vii)Check evaporator and condensor approach(viii)Inspect all safety controls and adjust if required(ix)Inspect all operating control and sequence of operation(x) Motor insulation check(xi)Top up refrigerant gas (R-134a) if required(xii) Motor pump greasing,pulley,bearings,pumpseal etc(xiii)Check liquid sight glass to determine if there is refrigerant shortage.(xiv)Compare the chilled water temp at full load (b)AHUs (i) Cleaning electrical control panel & mechanical parts (ii)Blower & motor greasing(iii)Air filter cleaning(iv)Inspect entire system for any unusual conditions such as noise, vibration,etc(v)Check evaporator coil air flow(vi)Inspect all safety controls and adjust if required(vii)Cleaning of evaporator coil(viii)Motor insulation checks (c)Cooling tower(i) Verify the balance and cleanliness of the return water through distribution boxes (ii)Verify the proper operation of the bypass valve(iii)Verify proper and smooth operation of fan (iv) Verify clean basin and stainers (v) Cleaning spray nozzles & frills clearing Air filter cleaning(iv)Inspect entire system for any unusual conditions such as noise, vibration,etc(iv)Check evaporator coil air flow(v)Inspect all safety controls and adjust if required(vi)Cleaning of evaporator coil(vii)Motor insulation checks
Material and labour dismantling of electric driven induction motor of capacity up to 2 HP 230 volt, single phase 50 HZ of various AHUs for exhaust air of 2X120TR AC Plant repairs and servicing shifting to local work shop taking out the burnt windings, cleaning of slots and rewinding the same with copper winding wire of existing gauge and quantity heating applying shellac varnish to the windings, replacing insulating materials as required baking up and assembling back including replacing the bearings bushes using hydraulic pressure complete all as directed by Engineer-in-charge.
All as per Item No 42 above but of capacity 5 HP 380/415 volt, 3 phase 50 HZ of cooling tower 2x120TR AC Plant and AHUs of various OTs complete all as directed by Engineer-in-charge.
All as per Item No 42 above but motor of capacity 7.5 HP 380/415 volt, 3 phase 50 HZ of condenser water pump set of 2x120TR AC Plant complete all as directed by Engineer-in-charge.
All as per Item No 42 above but motor of capacity 12.5 HP 380/415 volt, 3 phase 50 HZof Chilled water pump set of 2x120TR AC Plant complete all as directed by Engineer-in-charge.
Supply and fixing in replacement electric driven induction motor of capacity 1 HP 230 volt, single phase 50 HZ of various AHUs for exhaust air of 2X120TR AC Plant complete all as directed by Engineer-in-charge.
Material and labour for repair to chilled water Split casing pumpset of 12.5 HP for 2x120TR plant by disconnecting suction & discharge water lines and removing of electric connection, dismantling the U/S pumpset from MS foundation, opening the pump, remelting the shaft and filling of metal at decayed portions including all kind of machine works i.e. welding, turning, polishing etc as required to make the shaft of required shape and size, as original, balancing the shaft and refitting in pump body replacement of Cushy foot anti vibration pad with and incl carrying out complete repair / replacement /servicing of damaged parts i.e. bearings bush, gland plate, gland packing, coupling cleaning of impeller assembly etc and reassembling the pump after greasing of moving parts and reinstallation of the pump with motor in original location using new MS stud, nut, bolt, washer and other packing material etc; checking the alignment; reconnecting the suction and delivery pipes, testing and commissioning for smooth operation complete all as directed by Engineer-in-charge.
All as per Item No 47 above but of Condenser water Split casing pump set of capacity 7.5 HP complete all as directed by Engineer-in-charge.
Material and labour for descaling the condensers units of AC Plant capacity 2x120 TR after dismantling the inlet and out let of water/refrigerant gas connections and circulating descaling HCL acid/chemical with help of external pump, brushing the condenser tubes removing the scale neutralizing the base of tubes by circulating neutralizing agent replacement of rubber gasket for the end covers of the condenser removing the dummies connecting the water pipe line /refrigerant connections, removing the air,including refilling the removed refregerant(R 134a) gas, leak testing checking gas pressure and testing complete all as directed by Engineer-in-charge.
Material and labour for descaling the condensers units of AC Plant capacity 3x20 TR after dismantling the inlet and out let of water/refrigerant gas connections and circulating descaling HCL acid/chemical with help of external pump, brushing the condenser tubes removing the scale neutralizing the base of tubes by circulating neutralizing agent replacement of rubber gasket for the end covers of the condenser removing the dummies connecting the water pipe line /refrigerant connections, removing the air,including refilling the removed refregerant(R 22) gas, leak testing checking gas pressure and testing complete all as directed by Engineer-in-charge.
Matrerial and labour for servicing of chilled Water cooled type cooling coil of AHUs of capacity 2400 to 3200 CFM/26-39GPM including cleaning of complete AHU and cooling coil with necessary chemicals/caustic soda liquid of required quantity, and giving final water wash and refixing the same,cleaning and drying of suction / disharge filters,blower and all accessories including replacement of connected canvas cloth of existing type between AHU and duct complete all as directed by Engineer-in-charge.
All as per Item No 51 here-in-above but for AHUs of capacity 3500 to 9800 CFM/52-96 GPM of chilled Water cooled type complete all as directed by Engineer-in-charge.
Material and labour for Dismantling the side cover of existing cooling tower carefully without damaging the other portion of cooling tower removing unserviceable PVC frills carefully from cooling tower, and fix new PVC frills for cooling tower of 2x120 TR capacity including replacement of unserviceable bolts and Nuts etc of supporting media complete all as directed by Engineer-in-charge..
All as per item No 53 here-in-above but of capacity 3x20TR complete all as directed by Engineer-in-charge.
Supply and fixing in replacement of Condenser water pipe line of size 125 mm dia MS pipe of medium grade class 'B' black in colour complete all as directed by Engineer-in-charge.
Supply and fixing in replacement of Condenser water pipe line of size 150 mm dia MS pipe of medium grade class 'B' black in colour complete all as directed by Engineer-in-charge.
Material and labour for removing/cutting existing old rusted MS pipe line of size 125/150 mm to the required length and fixing new line in the existing position with necessary welding jointing fixing with suitable size/nos flanges, gaskets including bolts nuts washers complete on necessary qty of PCC bed of suitable size and height and painting of pipes with two coats of synthetic enamel paint of existing colour over a coat of primer complete all as directed by Engineer-in-charge. Note: (i) Rates are deemed to be included for providing necessary PCC work (ii) length of new pipe will measured and paid seperately under relavant item 55&56 above
Supply only in replacement of power contactor of 6.3-9 Amp 415V AC rating, 03 pole, with 2NO+2NC Aux Contacts, 415V, with and including taking down of unserviceable contactor and making all electric connection, complete all as directed by Engineer-in-charge.
All as per srl item No 58 here-in-above but 32 Amps capacity complete all as directed by Engineer-in-charge.. Make Siemens equivalent in Schneider/L&T
All as per srl item No 58 here-in-above but 25 Amps capacity complete all as directed by Engineer-in-charge. Make Siemens equivalent in Schneider/L&T
Supply and fixing in replacement of over load relay range 20-32 Amps, direct / separate mounting on contactors, as required, with and incl taking down of unserviceable relay and making all electric connection, complete all as directed by Engineer-in-charge.
All as per srl item No 61 here-in-above but 12-16 Amps capacity complete all as directed by Engineer-in-charge.
All as per srl item No 61 here-in-above but 6-10 Amps capacity complete all as directed by Engineer-in-charge.
Supply and fixing in replacement of phase failure relay 3 Ph 415V 6-32A as existing type with high voltage, low voltage and neutral fail protection, complete all as directed by Engineer-in-charge.
Supply & fixing inreplacement Moulded Case Circuit Breakers of 63A 3 pole 415V 16 kA ICS=100%ICU, Fixed Thermal & Fixed Magnetic setting for Motor starter control mains complete all as directed by Engineer-in-charge.
Supply & fixing inreplacement Moulded Case Circuit Breakers 3 pole 415V 100A 25 kA ICS=100%ICU, Adjustable Thermal & Fixed Magnetic settingfor LT panel control mains complete all as directed by Engineer-in-charge.
Supply & fixing inreplacement Moulded Case Circuit Breakers 415V 400A FP 50 kA ICS=100%ICU, adjustable Thermal & adjustable Magnetic setting for LT panel control mains complete all as directed by Engineer-in-charge.
Supply and fixing in replacement Power contactor with in built conventional coil 230v/415v of Compressor motor starter of Cap upto 195/225 A type for 2x120TR AC Plant complete all as directed by Engineer-in-charge.
Supply and fixing in replacement Power contactor with in built conventional coil 230v/415v of Compressor motor starter of Cap upto 140/150 A type for 2x120TR AC Plant complete all as directed by Engineer-in-charge.
Supply & fixing in replacement push button, projecting head (push function) type, for controling the motors starters of cooling tower/water pumps etc complete all as directed by Engineer-in-charge.
Supply & fixing in replacement of LED type indicator lamp of red/yellow/blue/colour for phase indication complete all as directed by Engineer-in-charge.
Supply & fixing in replacement CI butter fly valve, Hand liver operated ISI marked, PN - 1.0 pressure grade, having Nitrile/EPDM/nylon rubber lining, SS stem, CS/SS disc, of size 125 mm dia bore including all jointing material i. e. nut, bolt, washer, packing material etc, duly insulated on fixing complete all as directed by Engineer-in-charge.
All as per sl item No 72 here-in-above but 150 mm dia size complete all as directed by Engineer-in-charge.
Supply & fixing in replacement, of gun metal gate valve of 20 mm dia bore size with iron wheel head, screwed inside, non-rising stem, complete all as directed by Engineer-in-charge.
All as per srl item no 74 here-in-above but of 25 mm bore size complete all as directed by Engineer-in-charge.
Supply & fixing in replacement of Air Vent valve, 20 mm dia ISI marked with and incl all fixing accessories complete all as directed by Engineer-in-charge.
Material and labour for insulation for MS pipe of size 150 mm dia with PUF moulded type 40/50 mm thick with and incl applying bituminous compound and aluminium cladding with suitable gauge aluminium sheet with and incl taking down of old insulation and preparing of pipe surface by scratching / removing rust, dust and old paints etc with wire brush, emery paper, grinder etc and making surfaces smooth, complete all as directed by Engineer-in-charge.
All as per srl item no 77 here-in-above but of 80 to 125 mm bore size.
Material and labour for cleaning to FRP base of cooling tower 2x120 TR capacity by dismantling coupling cooling fan, draining out of water, removing algey, silt etc, cleaning & servicing of mechanical components and welding to cross members and frame bracing components incl repair/over hauling the complete transmission system of cooling tower and re-assembling all the dismantled components to its original position complete all as directed by Engineer-in-charge
Material and labour for cleaning to FRP base of cooling tower 3x20 TR capacity by dismantling coupling cooling fan, draining out of water, removing algey, silt etc, cleaning & servicing of mechanical components and welding to cross members and frame bracing components incl repair/over hauling the complete transmission system of cooling tower and re-assembling all the dismantled components to its original position, complete all as directed by Engineer-in-charge
M&L for Structural steel work with Fe-290 (Gde E-165) with compound girder and stancions , lattice girders, aerial mast staging of water tank and like inluding caps bases splices etc built up from two or more beam or channel section or angle with plates, including all lattice bars, stiffeners , gusset plate etc and replacement of necessary MS angles of size of suitable length with necessary fittings and fixtures bolts nuts washers etc including required welding work complete all as directed by Engineer-in-charge
Material and labour for applying one coat of primer and synthetic enameled spray paint of existing colour on 2x120TR AC plants steel/iron surfaces of MS structurals,pipes ,compressors-02 Nos, Pumps-04 Nos Condensor-02 Nos motors condensor inlet outlet pipeline incl preparing of surface by scratching / removing rust, dust and old paints etc with wire brush, emery paper, grinder etc and making surfaces smooth for achieving better grip between surface and primer, complete all as directed by Engineer-in-charge
Supply & fixing in replacement pvc sprinkler set assembly as in existing type/size of FRP cooling tower suitable for up to 2x120 TR capacity including removing of unserviceable sprinkler set with fittings/fixtures complete all as directed by Engineer-in-charge
Supply and fixing in replacement pvc sprinkler set assembly as in existing type/size of FRP cooling tower suitable for up to 3x20 TR capacity including removing of unserviceable sprinkler set with fittings/fixtures complete all as directed by Engineer-in-charge
Supply and fixing in replacement of thermostatic expansion valve suitable for 2x 120 TR capacity chiller with screw compressor complete all as directed by Engineer-in-charge
Supply and fixing water pressure gauge 0 - 10.6 kg and 4" dia suitable for condenser / Chiller water line including removing of old/unserviceable pressure gauge complete all as directed by Engineer-in-charge
Supply and fixing suction/ discharge/oil pressure gauge of 0-150 PSI equivalent in Kg/ Cu cm for central type AC plant including removing of old unserviceable pressure gauge complete all as directed by Engineer-in-charge
Supply & Fixing resin bonded fibre glass insulation with 50 mm thick with one side factory laminated with aluminium foil wrapping around for existing ducts of any size including FRP Polyshield sheet of each layer of 1mm thick wrapped and held in position by 1.0mm dia GI wire around the duct from AHUs to wall entry into OTs to prevent water ingress where ever necessary including taking down old teared insulation with cover sheet complete all as directed by Engineer-in-charge
Supply only in replacement and charging of refrigerant (R-134a).for 2x120TR plant complete all as directed by Engineer-in-charge
Supply only in replacement driving belt as per existing size for the compressor driving motor /AHU driving motor of the plant 2x120 TR complete all as directed by Engineer-in-charge
Material and labour for pressure testing and rectifying the leakages found in the system of 3x20 TR capacity including vacumizing and charging of the refrigerant gas to the desired pressure etc using nitrogen complete for satisfactory functioning complete all as directed by Engineer-in-charge Note: Topping up of gas (R22) if required will be measured and paid seperately under relevent item.
Material and labour for pressure testing and rectifying the leakages found in the system of 2x120 TR capacity including vacumizing and charging of the refrigerantgas to the desired pressure etc using nitrogen complete for satisfactory functioning complete all as directed by Engineer-in-charge Note: Topping up of gas (R134a) if required will be measured and paid seperately under relevent item.
Material and labour in replacement plates chequered channels,square cut or notched Fe 410 w GDE E-250 quality B as cable duct cover of MS sheet with welding of holdfast etc. including carrying handle , preparation of surfaces and applying two coats of synthetic enamel black paint over a coat of red oxide primer for 2x120TR complete all as directed by Engineer-in-charge.
Material and labour in replacement synthetic insulating mat of size 2mx1mx19mm ISI marked complete all as directed by Engineer-in-charge.
Supply and fixing in replacement gun metal gate valves 50mm with iron wheel head screwed both ends for GI pipe of 3x20TR complete all as directed by Engineer-in-charge
Supply only in replacement dehumidifier as per existing type and make for 3x20TR complete all as directed by Engineer-in-charge
Supply only in replacement thermostate as per existing type and make for 3x20TR complete all as directed by Engineer-in-charge
Material and labour for servicing as in Preventive maintenance and repairs to centralised compressed air system to AFIDS consisting of reciprocating type air compressor with squirrel cage induction motor 3 phase 5 HP 2 Nos, compressed air receiver tank 500 litres capacity 1 No, cut out switches 2 nos, Air filter dryer, flow control valves for 16 Nos outlets distribution pipe line of 3/8" 1/2" & 3/4" dia complete including replacing of unserviceable spares, initial replacement of compressor oil and toping up as and when required basis, cleaning the complete system externally to keep the plant clean and tidy and satisfactory functioning through out the maintenance period to the entire satisfaction of Engr-in-Charge as and when ordered. Notes: (i) Replacement of spares costs below Rs 500/- are deemed to be included in the rate quoted
Material and labour for dismantling of electric driven induction motor of capacity 5 HP 415 volt, 3 phase 50 HZ of centralised compressed air system repairs and servicing shifting to local work shop taking out the burnt windings, cleaning of slots and rewinding the same with copper winding wire of existing gauge and quantity heating applying shellac varnish to the windings, replacing insulating materials as required baking up and assembling back including replacing the bearings bushes using hydraulic pressure complete all as directed by Engineer-in-charge
Material and Labour for painting with super Synthetic enamel paint two coats after cleaning and scrapping out the surface as required to machineries and accessories to the centralised compressed air system complete all as directed by Engineer-in-charge.
Supply and fixing in replacement DOL starter suitable for 5HP motor complete all as directed by Engineer-in-charge
Supply and fixing in replacement Air Pressure cut off switch operates between 30-90 PSI for Air compressor plant fixed in replacement complete all as directed by Engineer-in-charge
Supply and fixing in replacement Air filter of existing size operates between 30-90 PSI for Air compressor plant complete all as directed by Engineer-in-charge
Supply and fixing in replacement multi functional three phase VAFPF (Voltage, Amp, Frequency and Power factor meter) in pump house electric panels with accuracy class 0.5 operating voltage 420 Volts conforming to cat part no EM 6459 1.0 of Schneider or equivalent in AE complete all as directed by Engineer-in-charge
Material and labour Sand cushioning to cable laid in tranches/duct using clean, dry , red hill sand complete all as specified and directed by Engineer-in-charge. Note :- Finished thickness of sand cushioning after punned down shall be considered for calculating the volume and payment.
Material, labour, testing and commissioning in replacement of common earthing with maintanance free chemical earthing with skilled manpower for making High conductive, corrosion resistant, CPRI tested Maintenance free Chemical Earth pit made of ‘Grip’ Chemical earth enhancing, non ferrous compound containing no carbon or graphite, filled in earth pit - (Qty 50 kg) using compound "CONDUCTOLITE" of bore hole of 200 mm and depth up to 3.3 mtr (approx) copper plated 250 micron and ‘Fast Earth Electrode’ Model ASEEL393 CU MS copper plated - a double pipe technology based Chemically pre filled, fully sealed earth Rod having 88mm outer dia and 48 mm inner dia, 3Mtr long, made of copper plated along with a Heavy duty high-density plastic lockable cover cum inspection chamber, SS fasteners including connection upto DB with copper strip of size 20x3mm up to 7.5 mtr from earth rod all other required accessories and lay out modification as per site requirement including connection and necessary excavation and removing soil complete all as directed by Engineer-in-charge. (Equipment/Conventional Lightning conductor earthing) Make Ashlok or equivalent in Galaxy/CIKIT. Note:(a) All earth strips should be welded or brazed at each joint.(b) Earth resistance should be below one ohm (c) The quoted rate is included for taking up old earthing complete in all respects alla s specified and directed by engineer-in-charge. (d) The photography to be carried out for taking up old earthing material from site and execution of new earthing in the presence of Engineer- in-charge, JE and contractor/contractor engineer/superviser and the same shall be submitted to deptt along with GST voucher of all new earthing material while cliaming payments by firm.
Supply and fixing in replacement gun metal gate valves 20mm with iron wheel head screwed both ends for GI pipe complete all as directed by Engineer-in-charge.
Material and labour for applying one coat of primer and synthetic enameled spray paint of existing colour on 3x20TR AC plants steel/iron surfaces of MS structurals,pipes incl preparing of surface by scratching / removing rust, dust and old paints etc with wire brush, emery paper, grinder etc and making surfaces smooth for achieving better grip between surface and primercomplete all as directed by Engineer-in-charge.
Material and labour for PCC (1:3:6) type C1 using 20mm graded stone aggregate for base to cooling tower 3X20TR including necessary form work complete all as directed by Engineer-in-charge. Note ; - Item Sch No. 1 to 109 as applicable shall be purchased from original manufacturers / authorised distributor / stockist / dealer only by the quoted firm and GST purchase vouchers submitted to Deptt on payment claims.
Pacific Enterprises
UNIVERSAL ENGINEERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .