Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.4 LAccepted-Finance ADOT JOGIA BARI JADAL PUR MIRZAPUR | MIRZAPUR | UTTAR PRADESH | 231001 | ₹23.4 L | L1 | Accepted-Finance RATE |
| 2 | L2₹26.7 LRejected-Finance UTTAR PRADESH UP | BALRAMPUR | UTTAR PRADESH | 271201 | ₹26.7 L | L2 | Rejected-Finance RATE |
Tender Value
₹31.6 L
EMD Value
₹3.2 L
Closing Date
8 May 2026, 12:00 pmClosed
EE CD2 MIRZAPUR
EE CD2 MIRZAPUR
PANTOON BRIDGE
2026_CEMRZ_1143602_3
1117/2A dt 04-04-2026
Open Tender
Civil Works
90 days
MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹950
Yes
₹3.2 L
Yes
EE CD2 MIRZAPUR
13 May 2026
30 Apr 2026
8 May 2026
30 Apr 2026
8 May 2026
30 Apr 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of Big Boat including cost of Mallah | 185 | Nos | 611 | ₹1,13,035 |
| 2 | Supply of Labour | 1,800 | Nos | 320 | ₹5,76,000 |
| 3 | Supply of Small Boat including cost of Mallah | 185 | Nos | 380 | ₹70,300 |
| 4 | Supply of Caukidar | 450 | Nos | 300 | ₹1,35,000 |
| 5 | Head Fitter | 12 | Nos | 650 | ₹7,800 |
| 6 | Opening of kulfi of passing survy and other ships skilled labour every time | 190 | Nos | 450 | ₹85,500 |
| 7 | Dredging machine (for Sand Removal) including all | 155 | hours | 2,500 | ₹3,87,500 |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of | 126 | Cum | 150 | ₹18,900 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 Cement: 4 coarse sand 8 graded stone aggregate 40 mm nominal size | 6 | Cum | 4,959 | ₹29,754 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, | 98 | Cum | 8,376 | ₹8,20,848 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
BOQ_2136317.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid