Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹65,247.96Admitted-Finance | -35.00% | ₹65,247.96 | L1 | Admitted-Finance |
| 2 | L2₹69,012.27+₹3,764.31 (5.77%)Admitted-Finance | -31.25% | ₹69,012.27+₹3,764.31 (5.77%) | L2 | Admitted-Finance |
| 3 | L3₹71,170.47+₹5,922.51 (9.08%)Admitted-Finance | -29.10% | ₹71,170.47+₹5,922.51 (9.08%) | L3 | Admitted-Finance |
| 4 | L4₹78,799.46+₹13,551.50 (20.8%)Admitted-Finance | -21.50% | ₹78,799.46+₹13,551.50 (20.8%) | L4 | Admitted-Finance |
| 5 | L5₹80,305.18+₹15,057.22 (23.1%)Admitted-Finance | -20.00% | ₹80,305.18+₹15,057.22 (23.1%) | L5 | Admitted-Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
10 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Constt. Of 2 nos of Community Compost Pit 1. At wno 5 hote 2. Aat lower jagat pur near Guru dwara
2026_RDPR_318477_17
e-NIT No.152/REW/K of 2026-27 Dated 29/07/2026
Open Tender
Civil Works
Percentage
90 days
KEERIAN GANDYAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹2,000
Yes
14 Sept 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
10 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil | 14 | cum | 592 | ₹8,288 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement :5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 0.1 | Cum | 4,826.5 | ₹482.65 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 0.34 | Cum | 5,733.6 | ₹1,949.42 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in 1:6 mix | 8 | cum | 7,571.55 | ₹60,572.4 |
| 5 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 84 | KG | 120.8 | ₹10,147.2 |
| 6 | Add Provission for fiber sheet (to be paid as per actual) | 2 | nos | 6,000 | ₹12,000 |
| 7 | Carriage of sand&Bajri for an av. Lead 8 km | 2.56 | cum | 247.74 | ₹634.21 |
| 8 | Carriage Bricks for an av. Lead 10 km | 3,846 | No | 0.6 | ₹2,307.6 |
| 9 | Add Provision for informatory board/CIB | 2 | No | 2,000 | ₹4,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.92 MB
BOQ_1049753.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .