Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.4 LAccepted-Finance | ₹59.4 L | L1 | Accepted-Finance DUE TO L1 |
| 2 | L2₹59.4 L+₹4,753.77 (0.08%)Rejected-Finance | ₹59.4 L+₹4,753.77 (0.08%) | L2 | Rejected-Finance DUE TO L2 |
Tender Value
₹60.1 L
EMD Value
₹1.2 L
Closing Date
15 Jun 2026, 12:00 pmClosed
SE RED CIRCLE KANPUR
OFFICE OF SE RED CIRCLE KANPUR
Ward 7 Barra 2 Road construction work from House No. 1 New MIG Daroga Chauraha via Peela Pul to Shri Lagan DJ Band and from Peela pul to House No. 126/35 U Block Govind Nagar
2026_REDUP_1144434_56
14/RED/Tender Notice/TVY-25-26(Kanpur)/26-27 Dt 02-04-2026
Open Tender
Civil Works
Percentage
120 days
KANPUR NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
₹1.2 L
OFFICE OF SE RED CIRCLE KANPUR
22 Aug 2026
4 May 2026
15 Jun 2026
4 May 2026
15 Jun 2026
4 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description of work | |||||
| 1.01 | Dismantling of Flexible Pavement and disposal of dismantled materials upto a lead of 100m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202. | 169.95 | cum | 313.5 | ₹53,279.33 |
| 1.02 | Providing, Laying, Spreading and compacting graded stone aggregates to Wet Mix Macadem specification including premixing the material with water at OMC in mechanical Mixer (Pug Mill) carriage of mixed Material by tipper to site,laying in uniform layers in sub base/base course on a well prepared sub base and compacting with smooth wheel roller 80-100 KN weight to achieve the desired density including lighting,barricating and maintenance of diversion,etc,as per tables 400.11 & 400.12 and Technical Specification Clause 406. | - | cum | 3,243.3 | - |
| 1.03 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 5,665 | sqm | 53.87 | ₹3,05,173.55 |
| 1.04 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to .30 kg per sqm on the prepared granual surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 | 5,665 | sqm | 17.67 | ₹1,00,100.55 |
| 1.05 | Providing and Laying bituminous Macadem with higher capacity hot mix plant using crushed aggregates of specific grading premixed with bituminous binder transported to site, laid over a previously prepared surface with paver finisher to the required grade level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. | 283.25 | cum | 8,140.74 | ₹23,05,864.61 |
| 1.06 | Providing and Laying bituminous Concrete with higher capacity batch type hot mix plant using crushed aggregates of specific grading, premixed with bituminous binder @ 5.40% of Mix and filler transporting the Hot Mix to work site, laying with a hydrostatic paver finisher with senser control to the required grade level and alignment, rolling with smooth wheeld vibratory and tendem rollers to acheive the desired construction as per MORT&H specification clause No.507 complete in all respects. | - | cum | 11,058.48 | - |
| 1.07 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level, uniform and free from streaks and holes. | - | sqm | 587.1 | - |
| 1.08 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering as per drawing and technical specifications Clauses 602,603,604, 1202 & 1204 (1:4) | 5.04 | cum | 6,270 | ₹31,600.8 |
| 1.09 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802,804,805,806,807,1202 and 1204 | 1 | cum | 6,224.69 | ₹6,218.47 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.65 MB
SBD.pdf
Tender Documents • 4.08 MB
BOQ_2139692.xls
BOQ • 0.29 MB
Corrigendumcircle.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .