| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹32.7 L+₹5.5 L (20.1%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹34.5 L+₹7.3 L (26.8%)Rejected-Finance NO 01 ARCOT ROAD REMI COMPOUND AZHWARTHIRUNAGAR CHENNAI 600087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹35,300
Closing Date
23 Jan 2025, 2:00 pmClosed
SE/GCC I/Chennai
3 rd floor,230 KV Guindy GIS SS Complex,Guindy
Running contract for Two (2) years in the jurisdiction of SE/GCC-1/ Chennai circle for 110KV class power Transformers
2025_EB_518210_1
OT MM (W) 30 /2024-25
Open Tender
Electrical Works
Item Rate
730 days
GCC I /Guindy
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹35,300
Yes
18 Feb 2025
11 Jan 2025
24 Jan 2025
11 Jan 2025
23 Jan 2025
13 Jan 2025
Amount
A.Labour charges for Dismantling & pulling of failed/ healthy 2x10MVA, 2x16MVA & 2x25MVA 110 KV class Power Transformers with accessories from plinth/saferplace to safer place/plinth in the same 110 KV SS in the judisdiction of SE/GCC-1/ Chennai circle: Labour charges for Dismantling of Ext busbars of power Transformer(6 x3)
Labour charges for dismantling of Ext droppers and jumpers (6 x3)
Labour charges for Dismantling of 2x10 MVA, 110 kV class Power transformer and provision of suitable dummy plates for all openings such as bushing fixures top of turrets oil pipe lines, Bucholtz pipe lines, cooler bank pipe lines and wherever necesssary including crane charges at various 110 KV Sub Station.
Labour charges for Dismantling of 2x16 MVA ,110 kV class Power transformer and provision of suitable dummy plates for all openings such as bushing fixures top of turrets oil pipe lines, Bucholtz pipe lines, cooler bank pipe lines and wherever necesssary including crane charges at various 110 KV Sub Station.
Labour charges for Dismantling of 2x25 MVA, 110 kV class Power transformer and provision of suitable dummy plates for all openings such as bushing fixures top of turrets oil pipe lines, Bucholtz pipe lines, cooler bank pipe lines and wherever necesssary including crane charges at various 110 KV Sub Station.
Labour charges for oil draining from old Transformers using filter machine / oil pump/ Hose etc,. Per ltr excess quantity of above 800 liters.(2X1000,2x1200 & 2x1400)
Labour charges for Loading/ Unloading the transfomer including Raising and Lowering of power transformer using suitable jacks as many times as required with or without all accessories & oil for loading the transformer from existing plinth to safer place in the Same SS(or) loading into truck and unloading from truck to the allotted ss plinth vice versa .(2x34MT ,2x40 MT & 2x42 MT approx)
Labour charges for pulling of transformer from plinth to safer place in the same 110 KV SS & Pulling for loading into truck Or pulling from truck to plinth vice versa (232 MT x40 m) = 9280 MT/Mtr.
B.Labour charges for erection of 2x10MVA,2x16MVA,2x25MVA 110KV Class Power Transformers at various Substations in the judisdiction of SE/GCC-1/Chennai circle :Labour charges for erection of Power Transformer with turrets all HV/LV bushings,cable termination box, cooler bank, Fans, oil pipe lines, Mashalling box, RTCC Panel and all accessories which ever is necessary for succesesful commissioning of the Transformer Including Crane charges For 2x10MVA.
Labour charges for erection of Power Transformer with turrets all HV/LV bushings, cable termination box,cooler bank, Fans, oil pipe lines, Mashalling box, RTCC Panel and all accessories which ever is necessary for succesesful commissioning of the Transformer Including Crane charges For 2x16MVA
Labour charges for erection of Power Transformer with turrets all HV/LV bushings,cable termination box, cooler bank, Fans, oil pipe lines, Mashalling box, RTCC Panel and all accessories which ever is necessary for succesesful commissioning of the Transformer Including Crane charges for 2x25MVA .
Oil Draining from old Transformer using filter machine/Oil pump/Hose Etc., per liter excess Qty above 800 liters.(2x1000, 2x1000 & 2x1400)
Oil filling per Liter excess Qty more than 800Liters.(2x2200,2x2800 & 2x3400)
Hot Oil circulation & filteration upto satisfactory value is achieved including provision of suitable filtering machine of appropriate capacity with 6/10KL Filter machine upto 50MVA and 10/12KL for above 50MVA with minimum 50Mtrs supply cable.(2x11500,2x14000 & 2x16000)
Provision of filtering Machine of appropriate capacity
Labour charges for laying of control cables in trench/duct including bunching, alu tag identification upto 8core for 2x10MVA+2x16MVA+2x25MVA.
Labour charges for laying of control cables in trench/duct including bunching, alu tag identification above 8core.
Supplying and glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armours for x10MVA+2x16MVA+2x25MVA-19 mm
Supplying and glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armours for x10MVA+2x16MVA+2x25MVA-25 mm
Supplying and glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armours for x10MVA+2x16MVA+2x25MVA-28 mm
Supplying and glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armours for x10MVA+2x16MVA+2x25MVA-32 mm
Supply & Termination of cable core end including the cost of cable socket lug, ferrules,strap etc., as per cable schedule Each Terminal for 2x10MVA+2x16MVA+2x25MVA
Labour charges for Earthing of Power Transformer tank and Neutral at 2 Points, Marshalling box,DM Box,Cable box,RTCC Panel,etc., including supply of MS Flat for 2x10 & 2x16MVA
Labour charges for Earthing of Power Transformer tank and Neutral at 2 Points, Marshalling box,DM Box,Cable box,RTCC Panel,etc., including supply of MS Flat for 2x25MVA
Labour charges for Earthing of cooler fans and oil pumps of Power Transformers upto 16 MVA capacity using bare copper wires including cost of copper wires(min 10/12SWG) for 2x16MVA
Labour charges for Earthing of cooler fans and oil pumps of Power Transformers upto 25 MVA capacity using bare copper wires including cost of copper wires(min 10/12SWG) for 2x25MVA
Labour charges for excavation and refilling
Labour charge for gasket cutting for 110 kV class transformers
Labour charges for Painting including supply of branded Aluminium paint for 2x10MVA.
Labour charges for Painting including supply of branded Aluminium paint for 2x16MVA
Labour charges for Painting including supply of branded Aluminium paint for 2x25MVA
Labour charges for skilled man power Assistance during bushing CT testing, Pre commissioning testing of PowerTransformers Minimum 3 Labours for Transformers upto 110 kV class.
Labour charges for overhauling of fans including replacement of bearings, shafts, washers etc.,
Labour charges for overhauling and rewinding of fans including replacement of bearings shafts , washers etc.,
Labour charges for overhauling and rewinding of oil pumps including replacement of bearings , shafts , washers etc.,
Supply and provision of various sizes of GI /Yellow bolts and Nuts, with washers and foundation bolts for cooler bank A frames Cooling pumps/pipes supports, Marshalling box cooler control cubicles cable box covers and where ever necessary as per direction of the Field Engineer. Per KG ( M8,M9,M10,M12,M16, M 19, M 25)
Letter Writing/Stickering of the Power Transformer/Auto Tr/ICT/Reactor, Marshalling box,DM box, RTCC panel, Cooler control cabinet, Fan and Pump etc., including material with dark Blue enamel paint. Letter size should be minimum height 80 mm and thickness 10 mm.
Marshalling box door glass beading
Marshalling box door beading
Labour charges for Providing busbars with bend 75 mm IPS
Labour charges for Providing jumper/droppers single zebra/Moose
C.Transportation of 2x10MVA,2x16MVA,2x25MVA 110KV class power transformer to allotted substation &Miscellaneous transport charges per truck per day trip over and average distance of 50 KM and Rs. 40 for every additional Kilometers for transporting of control cable, Earth flats, Additional Transformer oil, Gaskets, Dummy plates etc.,(supplied from Board side): Category C : Minimum Transport Charges to be adopted for transformers above 30 MT UPTO 50 MT and 50 KM range within Chennai city limit ( OR) Category D : Minimum Transport Charges to be adopted for transformers above 30 MT UPTO 50 MT and 100 KM range out side Chennai city limit including Transformer oil and with all accessories.
Normal Transport Charges to be adopted for transportation Outside Greater chennai (39x2= 78 MTx 150 kM = 11700 MT/KM, 45x2=90 MT x150 km =13500 MT/KM & 50x2 =100 MTx150 kM=15000 MT/KM)
Miscellaneous transport charges per truck per day trip over and average distance of 50 KM and Rs. 40 for every additional Kilometers for transporting of control cable, Earth flats, Additional Transformer oil, Gaskets, Dummy plates etc.,(supplied from Board side)
Miscellaneous transport charges for above 50KM and Rs.40 for every additional KM for transporting of Additional Transformer oil, Gaskets , control cables etc.,(supplied from Board side)
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
JPS TRANSFORMER SERVICE (BID ID -1235467)
SHRI MEENATCHI ENGINEERING (BID ID -1236178)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .