THE COMMISSIONER MAHABUBABAD MUNICIPALITY
MAHABUBABAD TELANGANA
Lake Rejuvenation of Bandham Cheruvu in Mahabubabad Municipality under UIDF funds
699777
E1/MHBD/MPLTY/EPROC-04/2026-27/4th Call, Date:11-05-2026
OPEN
Civil Engineering Works
MAHABUBABAD, TELANGANA
19 documents required · 17 mandatory · 2 optional
₹11,800
₹3.9 L
10 May 2026
10 May 2026
11 May 2026
IRR-CAW-1-3Excavation in all kinds of soil including boulders upto 0.30 m dia for Silt Removal from the Tank Bed and bringing it to the required profile including cost of all materials, machinery, labour, placing the excavated stuff for disposal with initial lead of 10 m and lift upto 3 m
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper etc, complete,
Carting away the surplus excavated earth/marshy soil/soil/rock and any other debris from the work site with a lead of1.0 km beyond initial lead including loading, unloading, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge. Adopting shrinkage factor of 1/3 rd as per directions issued by Vigilence Department.
Excavation in ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Storm water drains as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for construction of drains including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by manual means.
IRR-CAW-5-5 - Providing and laying sand blanket on slopes of embankment including cost of all materials, machinery, labour, spreading to specified thickness etc., complete with initial lead upto 50 m and all lifts
IRR-CAW-8-10 : Providing and Constructing 30 cm thick rubble stone pitching set in CM 1:5 Proportion including cost of all materials,labour, packing chips and mortar, finishing etc.,complete
RBR-FNDN-4 II iii: Providing P.C.C grade M 15 using Concrete mixer (Nominal Mix) using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including centering, shuttering, curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH For Chute Drains
Excavation in ordinary soils, up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Storm water drains as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for construction of drains including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by mechanical means.
Excavation in ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Storm water drains as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for construction of drains including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by manual means.
Dewatering trenches duly bailing out water from the trenches with oil engine driven pump sets using 5hp diesel dewatering pump, including hire charges, fuel charges and crew charges for Driver and Helper, and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc. complete as per the directions of the Engineer in Charge
BLD-CSTN- 2-8 modified in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Providing Plain Cement concrete nominal mix M10 grade using 20mm size Graded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.
RBR-FNDN-4 II(iii): Providing P.C.C grade M 15 Nominal mix concrete for structures using 20mm size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and all other incidental charges for complete finished item of work as directed by the Engineer in Charge For base slab
RBR-FNDN-4 II(iii): Providing P.C.C grade M 15 Nominal mix concrete for structures using 20mm size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and all other incidental charges for complete finished item of work as directed by the Engineer in Charge For Side wall
Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge
RBR-FNDN-4 G: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge RCC M25 grade Design Mix forside walls of thickness 200mm
RBR-FNDN-4 II(iii): Providing P.C.C grade M 15 Nominal mix concrete for structures using 20mm size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and all other incidental charges for complete finished item of work as directed by the Engineer in Charge
RBR-FNDN-4 G: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge RCC M25 grade Design Mix for top slab of drain / culvert slab
BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126
Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.
Supply and laying of expansion joints with 25.4mm thick Mastic pad, sealing with bituminous hot sealing compound (Grade 'A' ISI Polysnlphider) including cost and conveyance of all materials such as filler materials etc complete
Supplying and fixing of 100mm dia PVC pipes for weep holes including material, labour charges like cutting size, fixing in side wall etc as directed by Engineer- in- charge
IRR-DAW-5-6 Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
Dewatering trenches duly bailing out water from the trenches with oil engine driven pump sets using 5hp diesel dewatering pump, including hire charges, fuel charges and crew charges for Driver and Helper, and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc. complete as per the directions of the Engineer in Charge
Laying of Sand Bags in the stipulated places including cost of empty cement bag, sand, thread, stitching charges and labour charges etc.
Cutting Open BT Road Surface including stacking of excavated material for pipe line trench including all operational, incidental, labour charges, taking all precautionary measures in the restricted areas, diversion of the traffic etc., as directed by Engineer-In Charge
Cutting Open CC Road Surface with concrete saw cutter and removal with Breaker including stacking of excavated material for pipe line trench including all operational, incidental, labour charges, taking all precautionary measures in the restricted areas, diversion of the traffic etc. as directed by Engineer-In Charge
Cutting Water Bound Macadam/ Wet Mix Macadam road including soiling and stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.
RBR-FNDN-1 - In ordinary soils by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by mechanical means. For pipeline trenches upto 3m depth below GL by Mechanical Means
RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.For pipeline trenches upto 3m depth below GL by manual means where depth is less than 1.5 times the width
RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.For pipeline trenches upto 3m depth below GL by manual means where depth is more than 1.5 times the width
BLD-CSTN-2-11 - (Amendment as per SOR 2021-22) - Earth work excavation in hard rock (blasting prohibited) (Using Hydraulic Excavator with breaker attachment) using hydraulic brakers for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete
RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) - up to 3.00 Mts depth below GL (Using Air Compressor and Jack Hammers) : Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete as directed by the Engineer in charge.
Dewatering trenches duly bailing out water from the trenches with oil engine driven pump sets using 5hp diesel dewatering pump, including hire charges, fuel charges and crew charges for Driver and Helper, and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc. complete as per the directions of the Engineer in Charge
PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6’-0” (2 Meter) below G.L as directed by the departmental officers
BLD-CSTN- 2-8 modified in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Manufacture, Supply and Delivery of R.C.C. Spun / Vibrated Cast (Reinforced)Socket and Spigot pipesconfirming to B.I.S. 458/2003 manufactured by using Sulphate resistant cement including inling with high alumina coating including loading, unloading and Transportation to work site but excluding GST
PHE-LRCS-6 : Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985.
Construction of sewer conical manhole as per type design using Flyash Cement Solid Blocks of size 225x 100 x 60 Cum and brick masonary in CM (1:5) prop; including PCC M10 grade using 20mm graded for bed in foundation and PCC M15 grade concrete using 20mm graded HG metal for benching and channels, inside plastering 20mm thick in single coat of CM (1:3) prop. with Sulphate Resistant Cement; and outside plastering 20mm thick in single coat of CM (1:3) prop with Ordinary Portland Cement; and supporting incoming pipes with concrete block / masonry wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) 560mm dia and Encapsulated Plastic steps including carting and geotagging of manhole cost and conveyance of all other incidental and operational charges etc., complete as per drawings and specifications and as directed by the Engineer in Charge.
Man holes of 0.90m dia and 1.10m depth (1.10m to 1.60m)
0.90m dia manhole up to 1.10m
0.90m dia manhole extra lifts of 0.1m depth up to 1.60m depth
Man holes of 1.20m dia and 1.65m depth ( 1.65m to 2.30m)
1.20m dia manhole 1.65m depth
1.20m dia manhole extra lift of 0.1m depth up to 2.30m
Man holes of 1.50m dia and 2.40m depth ( 2.40m to 3.0m)
1.50m dia manhole 2.40m depth
1.50m dia manhole extra lift of 0.1m depth up to 3.00m
Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.as directed by the Engineer in Charge.
Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.
RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.
BLD-CSTN- 2-8 modified in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 350 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BID DOCUMENT.pdf
TENDER_DOCUMENT • 1.48 MB
BOQ - DRAIN 650.00 LAKHS.xls
TENDER_DOCUMENT • 0.09 MB
NIT.pdf
TENDER_DOCUMENT • 0.47 MB
SCHEDULE-A.pdf
TENDER_DOCUMENT • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .