| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 CrAdmitted-Finance 147 UDHYOG VIHAR PH I GURGOAN HARYANA 122016 | GURUGRAM | HARYANA | 122016 | ₹7.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.9 Cr+₹2.7 Cr (38.0%)Admitted-Finance 184 187 TEMPLESTEPS BLOCK ANNASALAI LITTLEMOUNT CHENNAI CHENNAI TAMIL NADU 600015 | CHENNAI | TAMIL NADU | 600015 | ₹9.9 Cr+₹2.7 Cr (38.0%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Johnson Lifts Pvt Ltd L1 | OTIS ELEVATOR COMPANY INDIA LIMITED L2 |
|---|---|---|---|---|---|
| 1.00GENERAL NOTES : | |||||
| 2.00a)All items of work under this Contract shall be executed strictly to fulfill the requirements laid down in the specifications, which shall include type of equipment, material, methods of installation, type of controls, approved shop drawings and the relevant standards. b)The scope of work includes dismantling of the existing lift and taken over by the vendor as buyback item. c)After dismantling the lift,the civil team will do all civil repair works such as water proofing at pit ,mechine room repair works ect.the approximate time taken by civil team shall be 15 days to one month. d) In meantime, the lift vendor should arrange to deliver the materials and commence the work as soon as handing over the lift shaft and mechine room for erection. e)The dismantling works may be taken after consent from the user department and the same will be communicated to your site engineer. The site engineer should be made available at site during execution of the work for entire contract period. | |||||
| 3.00The rate for each item of work in the Schedule of Quantities shall, unless expressly stated otherwise, shall also include the following: a. All fixing materials, accessories, appliances, tools, plants, equipment, transport, labour and incidentals required in preparation of and in the full and entire execution, testing, commissioning and completion of the work called for in the item as per Specifications and Drawings. b. Wastage on materials and labour. c. Loading, transporting, unloading, handling / double handling, hoisting to all levels, setting, fitting and fixing in position, protecting, disposal of debris and all other labour necessary in and for the full and entire execution and to fully complete the job in accordance with the contract documents, good practice and recognized principles. The storage required for storing of new lift materials will be the scope of lift agency and required temporary shed or containers will be arranged by the lift agency. The place will be identified and permission will be given by the institute to construct the temp. shed. d. Liabilities, obligations and risks arising out of Conditions of Contract. e. All requirements of specifications, whether such requirements are mentioned in the item or not. The specifications and drawings where available, are to be read as complimentary to and part of the Schedule of Quantities and any work called for in one shall be taken as required for all. f. In the event of conflict between schedule of quantities and other documents including the specifications, the most stringent shall apply and the interpretation of the consultants shall be final and binding. | |||||
| 4.00The unit rate for each equipment or materials shall include cost in Rupees for equipment and material including the excise duty, forwarding, freight and insurance upto Contractor’s store at site, storage, installation, testing, commissioning and other works required. | |||||
| 5.00The extension for (total) amounts against each item shall be based on the quantities indicated in this Schedule. | |||||
| 6.00The quantities given in this schedule are provisional, the Owner reserves the right to increase or decrease the quantities or to totally omit any items of work and the Contractor shall not be entitled to claim any extras or damages on these grounds. These variations shall be permitted until such time Contractors shop drawings are approved. | |||||
| 7.00This schedule shall be fully priced and the extensions and totals duly checked. The rates for all items shall be filled in INK | |||||
| 8.00No alteration whatsoever is to be made to the text or quantities of this Schedule unless such alteration is authorized in writing by the Consultants. Any such alterations, notes or additions shall unless authorized in writing be disregarded when tender documents are considered. | |||||
| 9.00In the event of an error occurring in the amount column of the Schedule, as a result of wrong extension of the unit rate and quantity, the unit rate quoted by the tenderer shall be regarded as firm and the extensions shall be amended on the basis of the rates. | |||||
| 10.00Any error in totaling in the amount column and in carrying forwarded totals shall be corrected. Any error, in description or in quantity, or omission of items from this schedule shall not vitiate this contract but shall be corrected and deemed to be a variation required by the Consultants. | |||||
Tender Value
₹7.0 Cr
EMD Value
₹13.9 L
Closing Date
21 Nov 2024, 3:00 pmClosed
Executive Engineer (Electrical)
Engineering Unit, Admin Block 3rd Floor, IIT Madras CHENNAI-600036
Replacement of by supply and installation of lifts in various locations in Academic and Hostel zone building in IIT Madras
2024_IITM_211814_1
21/2024-25/ELDB
Open Tender
Electrical Works
Item Rate
240 days
IIT MADRAS CHENNAI
All required documents as mentioned in the tender
2 documents required · 2 mandatory
₹0
₹13.9 L
GOOGLE MEET
11 Dec 2024
18 Oct 2024
22 Nov 2024
18 Oct 2024
21 Nov 2024
25 Oct 2024
18 Oct 2024 - 24 Oct 2024
24 Oct 2024
Amount
GENERAL NOTES :
a)All items of work under this Contract shall be executed strictly to fulfill the requirements laid down in the specifications, which shall include type of equipment, material, methods of installation, type of controls, approved shop drawings and the relevant standards. b)The scope of work includes dismantling of the existing lift and taken over by the vendor as buyback item. c)After dismantling the lift,the civil team will do all civil repair works such as water proofing at pit ,mechine room repair works ect.the approximate time taken by civil team shall be 15 days to one month. d) In meantime, the lift vendor should arrange to deliver the materials and commence the work as soon as handing over the lift shaft and mechine room for erection. e)The dismantling works may be taken after consent from the user department and the same will be communicated to your site engineer. The site engineer should be made available at site during execution of the work for entire contract period.
The rate for each item of work in the Schedule of Quantities shall, unless expressly stated otherwise, shall also include the following: a. All fixing materials, accessories, appliances, tools, plants, equipment, transport, labour and incidentals required in preparation of and in the full and entire execution, testing, commissioning and completion of the work called for in the item as per Specifications and Drawings. b. Wastage on materials and labour. c. Loading, transporting, unloading, handling / double handling, hoisting to all levels, setting, fitting and fixing in position, protecting, disposal of debris and all other labour necessary in and for the full and entire execution and to fully complete the job in accordance with the contract documents, good practice and recognized principles. The storage required for storing of new lift materials will be the scope of lift agency and required temporary shed or containers will be arranged by the lift agency. The place will be identified and permission will be given by the institute to construct the temp. shed. d. Liabilities, obligations and risks arising out of Conditions of Contract. e. All requirements of specifications, whether such requirements are mentioned in the item or not. The specifications and drawings where available, are to be read as complimentary to and part of the Schedule of Quantities and any work called for in one shall be taken as required for all. f. In the event of conflict between schedule of quantities and other documents including the specifications, the most stringent shall apply and the interpretation of the consultants shall be final and binding.
The unit rate for each equipment or materials shall include cost in Rupees for equipment and material including the excise duty, forwarding, freight and insurance upto Contractor’s store at site, storage, installation, testing, commissioning and other works required.
The extension for (total) amounts against each item shall be based on the quantities indicated in this Schedule.
The quantities given in this schedule are provisional, the Owner reserves the right to increase or decrease the quantities or to totally omit any items of work and the Contractor shall not be entitled to claim any extras or damages on these grounds. These variations shall be permitted until such time Contractors shop drawings are approved.
This schedule shall be fully priced and the extensions and totals duly checked. The rates for all items shall be filled in INK
No alteration whatsoever is to be made to the text or quantities of this Schedule unless such alteration is authorized in writing by the Consultants. Any such alterations, notes or additions shall unless authorized in writing be disregarded when tender documents are considered.
In the event of an error occurring in the amount column of the Schedule, as a result of wrong extension of the unit rate and quantity, the unit rate quoted by the tenderer shall be regarded as firm and the extensions shall be amended on the basis of the rates.
Any error in totaling in the amount column and in carrying forwarded totals shall be corrected. Any error, in description or in quantity, or omission of items from this schedule shall not vitiate this contract but shall be corrected and deemed to be a variation required by the Consultants.
Obtaining of lift license and Handing over to client shall be the sole responsibility of Contractor.
Design, manufactures and replacement by supply,installation, testing,commissioning, approvals / laisoning (All local / state/ central statutory bodies) and handing over in satisfactory working conditions of elevators including the cost of providing 2 weeks satisfactory trial operation and testing at full design load and safely checks for sudden breaks, speed, etc. as directed and including the cost of providing free comprehensive maintenance service during Defect Liability Period of 12 months after final completion and satisfactory handing over to Engineer in charge complete as per specifications as required and as below,the cost inclusive of buyback cost of existing Johnson make lift.
Elevators
Location: Central Library
8 Passenger (544 Kg) Passenger Elevator PE 1&2 MR Gearless Type consisting of AC VVVF Panel, 1.5 MPS speed , 6 Nos. Stops, 17.25 m travelling distance, suitable size of car to suit the existing lift shaft , 800 x 1985 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. (duplex operation of PE)-Refer annexure-I
Location: BSB, Chemistry-HSB & CLT
8 Passenger (544 Kg) Passenger Elevator PE-3,4,5&6 MR Gearless Type consisting of ACVVVF Panel, 1.25 MPS speed , 3 Nos. Stops, 6.6-7.0 m travelling distance, suitable size of car to suit the existing lift shaft , 800 x 1985 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. (Simplex operation of PE) - Refer annexure-II
Location: ESB & MSB(2 Nos)
8 Passenger 544 Kg) Passenger Elevator PE 7,8&9 MR Gearless Type consisting of ACVVVF Panel, 1.25 MPS speed , 3 Nos. Stops,9.1 m travelling distance, car size of 1450x 2350, 800 x 1985 door opening with Automatic with Centre opening ACVVVF Motor Door operator with door monitor / infrared sensor door detector complete all respect as per specification. (Simplex operation of PE)-Refer annexure-III
Location: CSD
8 Passenger( 544 Kg) Passenger Elevator PE-10 MR Gearless Type consisting of ACVVVF Panel, 1.25 MPS speed , 4 Nos. Stops, 9.90 m travelling distance, suitable size of car to suit the existing lift shaft , 800 x 1985 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. Simplex operation of PE)-Refer annexure-IV
Location: OED
8 Passenger (544 Kg) Passenger Elevator PE-11 MR Gearless Type consisting of ACVVVF Panel, 1.25 MPS speed , 4 Nos. Stops,10.60 m travelling distance, suitable size of car to suit the existing lift shaft , 800 x 1985 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. Simplex operation of PE)-Refer annexure-V
Location: Structural Lab & MDS-1
8 Passenger (544 Kg) Passenger Elevator PE-12&13 MR Gearless Type consisting of ACVVVF Panel, 1.25 MPS speed , 4 Nos. Stops, 11.6 m travelling distance, suitable size of car to suit the existing lift shaft , 800 x 1985 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. (Simplex operation of PE)-Refer annexure-VI
Location: Biotechnology-I
20 Passenger (1360 Kg) Passenger Elevator PE-14&15 MR Gearless Type consisting of ACVVVF Panel, 1.5 MPS speed , 6 Nos. Stops, 20.75 m travelling distance, suitable size of car to suit the existing lift shaft , 1000 x 1985 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. duplex operation of PE)-Refer annexure-VII
Location: Sindhu(4 Nos), Pamba(4 Nos), Mahanadhi(4 Nos) & Tamiraparani(4 Nos)
13 Passenger( 1088 Kg) Capsule Type Elevator(Hexagonal shape-partly with Glass panel and partly with SS 304) PE-16 to PE-31 MR Gearless Type consisting of ACVVVF Panel, 1.5 MPS speed , 7 Nos. Stops, 17.70 m travelling distance, suitable size of car to suit the existing lift shaft , 900 x 2100 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification..(Duplex operation of PE).-Refer annexure-VIII
Location: DoMS
13 Passenger (1088 Kg) Elevator PE -32 MR Gearless Type consisting of ACVVVF Panel, 1.5 MPS speed , 5 Nos. Stops, 10.80 m travelling distance, suitable size of car to suit the existing lift shaft , 900 x 2000 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. (Simplex operation of PE)-Refer annexure-IX
Location: Institute Hospital
16 Passenger (1088 Kg) Elevator PE-33 MR Gearless Type consisting of ACVVVF Panel, 0.5 MPS speed , 2 Nos. Stops, 3.5 m travelling distance, suitable size of car to suit the existing lift shaft , 1000 x 2000 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. (Simplex operation of PE)-Refer annexure-X
Annual Maintenance Contract- Refer detailed scope in technical Specification
Cost of comprehensive maintenance for 8 Passenger Elevators (PE-1&2) that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fans with minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period). If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.
1st Year
2nd Year
3rd Year
4th Year
5th Year
Cost of comprehensive maintenance for 8 Passengers Elevator (PE-3,4,5&6)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period).If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.
1st Year
2nd Year
3rd Year
4th Year
5th Year
Cost of comprehensive maintenance for 8 Passengers Elevator (PE-7,8&9)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items with minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period).If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.
1st Year
2nd Year
3rd Year
4th Year
5th Year
Cost of comprehensive maintenance for 8 Passengers Elevator (PE-10)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period)..If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.
1st Year
2nd Year
3rd Year
4th Year
5th Year
Cost of comprehensive maintenance for 8 Passengers Elevator (PE-11)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period)..If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.
1st Year
2nd Year
3rd Year
4th Year
5th Year
Cost of comprehensive maintenance for 8 Passengers Elevator (PE-12&13)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period)..If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable before award of main work.
1st Year
2nd Year
3rd Year
4th Year
5th Year
Cost of comprehensive maintenance for 20 Passengers Elevator (PE-14&15)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period)..If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.
1st Year
2nd Year
3rd Year
4th Year
5th Year
Cost of comprehensive maintenance for 8 Passengers Elevator (PE-16 to PE-31) that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period).If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.
1st Year
2nd Year
3rd Year
4th Year
5th Year
Cost of comprehensive maintenance for 8 Passenger Elevators (PE-32 ) that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period)..If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.
1st Year
2nd Year
3rd Year
4th Year
5th Year
Cost of comprehensive maintenance for 16 Passengers Elevator (PE-33)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period)..If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.
1st Year
2nd Year
3rd Year
4th Year
5th Year
OTIS ELEVATOR COMPANY INDIA LIMITED (BID ID -768875)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
TenderNo21.pdf
Tender Documents • 1.55 MB
PriceBidForViewT21.pdf
Other Document • 0.50 MB
BOQ_232654.xls
BOQ • 0.30 MB
BOQ.xls
BOQ • 0.30 MB
Tenderdocument.pdf
Tender Documents • 1.55 MB
Tenderdocument_2.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .