| 1 | L1₹6.2 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹6.3 L+₹6,580.11 (1.06%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹6.3 L
EMD Value
₹7,000
Closing Date
21 Jul 2022, 3:00 pmClosed
The Project Director,DRDA KRISHNAGIRI
DRDA KRISHNAGIRI
Krishnagiri District Kelamangalam Block Under AGAMT II 2021-22 Improvements to Burial ground (Compound wall (30m) Waiting shed and CC Approach Road (15m) at Santhanapalli in Santhanapalli Panchayat at package No TN-04-KRI-264
2022_RDTN_239180_1
Roc_42_2022_R10__20_06_2022
Open Tender
Civil Works - Others
Item Rate
180 days
Kelamangalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,000
DRDA KRISHNAGIRI
2 Aug 2022
4 Jul 2022
21 Jul 2022
4 Jul 2022
21 Jul 2022
4 Jul 2022
18 Jul 2022
Amount
Improvements of Burial ground (Compound wall (30m), Waiting shed & CC Approach Road (15m) @ Santhanapalli H/o. Santhanap
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS20B
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications.
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth
White washing two coats using shell lime including cost and conveyance etc.., complete
Distembering two coats using oil bound distemper with one coat of waer based cement primer ncluding thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Construction of Comppund wall
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS20B
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
below GL
Above GL For Column
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Approach Road
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS20B
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete
construction of un-reinforced, dowel jointed at expansion and construction joint only, Plain Cement Concrete Pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M30 Grade
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Radhika Radha Krishnan
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .