Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86,000Accepted-Finance | L1 | Accepted-Finance Qualified | |
| 2 | L2₹1.6 L+₹72,000 (83.7%)Accepted-Finance | L2 | Accepted-Finance Qualified | |
| 3 | L3₹1.8 L+₹93,000 (108.1%)Accepted-Finance | L3 | Accepted-Finance Qualified | |
| 4 | L4₹8.8 L+₹7.9 L (918.6%)Accepted-Finance | L4 | Accepted-Finance Qualified |
| Sl No | Description | Qty | Unit | M/S MAA HINGULA CONSTRUCTION L2 | ENDEAVOUR POWER SERVICES L3 | Progressive Engineers And Associates L4 | ODISHA ENGINEERING CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | Repair of 01 nos Packaged Substation” at 2x660MW NTPC Talcher Project.
District Angul, Odisha.
BHEL/PSWR/PSS/Repair/2025/1 | 1 | Lumpsum | 1,58,000 ₹1,58,000 | 1,79,000 ₹1,79,000 | 8,76,000 ₹8,76,000 | 86,000 ₹86,000 Lowest |
Tender Value
Refer Docs
Closing Date
23 Aug 2025, 1:00 pmClosed
Hemant Kumar Jangid
2x660 MW Talcher EPC Project BHEL Site Office
Repair of 01 nos Packaged Substation at 2x660MW NTPC Talcher Project.
2025_BHEL_51886_1
BHEL/PSWR/PSS/Repair/2025/1
Limited
Miscellaneous Works
Lump-sum
45 days
2x660 TTPP Talcher Angul
5 documents required · 5 mandatory
₹0
Exempted
25 Aug 2025
18 Aug 2025
23 Aug 2025
18 Aug 2025
23 Aug 2025
18 Aug 2025
18 Aug 2025 - 22 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .