Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAccepted-AOC | ₹29.9 L Quoted ₹81.9 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹9.0 L+₹3.16 (<0.01%)Accepted-AOC | ₹9.0 L+₹3.16 (<0.01%) Quoted ₹81.9 L | L2 | Accepted-AOC Awarded |
| 3 | L3₹9.0 L+₹26.60 (<0.01%)Accepted-AOC | ₹9.0 L+₹26.60 (<0.01%) Quoted ₹81.9 L | L3 | Accepted-AOC Awarded |
| 4 | L3₹9.4 L+₹26.60 (<0.01%)Accepted-AOC | ₹9.4 L+₹26.60 (<0.01%) Quoted ₹81.9 L | L3 | Accepted-AOC Awarded |
| 5 | L3₹10.2 L+₹26.60 (<0.01%)Accepted-AOC | ₹10.2 L+₹26.60 (<0.01%) Quoted ₹81.9 L | L3 | Accepted-AOC Awarded |
Tender Value
₹91.0 L
EMD Value
₹1.8 L
Closing Date
25 Nov 2020, 2:00 pmClosed
Chief Engineer (MI),Irrigation,Assam, Ghy-03
O/o Chief Engineer (I),Irrigation,Assam, Ghy-03
Reconstruction of Main Canal with RCC Lining from ch. 0_323M Reconstruction of Main Canal with Brick Lining from ch.338_380M and renovation from ch.380.4_582M Construction of Intake Structure Renovation of D2 Canal from ch.0_987M Raising Strengt
2020_ID_19179_1
35 _SCSP_2020-21 date 03.11.2020
Open Tender
Civil Works
Item Rate
180 days
Morigaon
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
₹1.8 L
Yes
3 Feb 2021
4 Nov 2020
25 Nov 2020
4 Nov 2020
25 Nov 2020
5 Nov 2020
Amount
Reconstruction of Main Canal with R.C.C lining from Ch. 0 m to 323m (10 cusec capacity)
Item no. 1:Labour cost for dismantling of old cc lining and carriage of the materials and depositing the same at a safe distance as directed.Carriage up to lead of 30 M and lift up to 1.5 M
Item no. 2: Labour charge for dismantling / replacing the old damaged hume pipe of 1200 mm dia of canal structure and carriage of the same upto a lead of 30 M and lift of 2.5 M and depositing the same in a safe distance as directed.
Item no. 3: Earthwork in excavation in foundation of canal structures in all types of soil as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head lead to a safe distance from the working place & depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation all complete as directed at site. (Including bailing out stagnant rain water where necessary). In all types of soil (except soil mixed with gravel and boulder) For normal lead of 30 M and lift of 1.5 M
Item no. 4: Collecton of sand gravel (40 % sand gravel (40% sand and 60 % gravel of size 25 mm to 60 mm ) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete .
Item no. 5: Labour charge for spreding hard river shingles/sand gravels to required thicjness over approach subway etc. including ramming, dressing the seat before laying the materials lead up to 30 M and lift 1.5 M complete as directed.
Item no. 6: Cement concrete work in prop. 1:3:6 in foundation/abutment/piers/wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. where necessary complete as directed (Shuttering, scaffolding cost will be paid separately).
Item no. 7: Centering and shuttering including proping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works, complete as directed. (Measurement oto be taken on the face area timbered).© Shuttering (Column)
Item no. 8: R.C.C. work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in prop. 1:2:4 with hard broken stone aggregates of size 6 mm to 20 mm with proper reinforcement as per design i/c curing etc. with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 9: Item no. 9: Supplying, fitting, fixing and laying reinforcement (TATA) in position in R.C.C. work including cutting, bending, cranking with two plies 0.91 mm (20 BWG) annealed wire, hooking, tying complete as directed. At base of side wall, 10 mm dia @ 125 mm c/c
Item no. 10: Item no. 10: Earth work in filling in all soils in canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 Km including paying compensation of earth obtained from private land if any, loading, unloading, spreading the same including cutting light jungle, removing trees up to 15 cm dia and uprooting roots & stamps etc, from the seat of embankment, breaking clods not more than 10 mm cube, ramming, profilling etc. with all lifts complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Reconstruction of Main Canal with brick lining from ch. 338 M to 380.40 M and renovation from ch.380.40 to 582.00m
Item no.1: Labour cost for dismantling of old cc lining and carriage of the materials and depositing the same at a safe distance as directed.Carriage up to lead of 30 M and lift up to 1.5 M
Item No. 2 : Labour charge for dismantling of old CC works of canal structures and carriage the spoils and depositing the same in a safe distance as directed. : Carriage up to lead of 60 M and lift upto 9 M.
Item No. 3 : Dismantling old plastering works and racking out joints including carriage and stacking the materials at a safe place as directed complete.
Item No. 4 : Earth work in excavation of foundation trenches including filling up sides of trenches and removalof spoils after completion of foundation work, dressing, ramming, shoring etc, complete including bailing out water where necessary in ordinary soil.
Item No. 5 : Soling in foundation at all levels including filling interstices, ramming etc. complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
Item No. 6 : C .C. work in proportion 1:4:8 in foundation/abutment/piers/wing walls etc. with hard broken stone aggregates of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 7 : 1st class brick work in cement mortar in abutment and wing wall, parapet wall etc. including racking outjoints and curing etc. complete.
Item No. 8 : C. C. work in proportion 1:3:6 in foundation /abutment.piers / wing wall etc. with hard broken stone aggregates of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necy. complete as directed . (Shuttering, scaffolding cost will be paid separately).
Item No. 9 : 12 mm thick cement plastering including clearing surface and curing complete as directed in proportion 1:3
Construction of Intake Structure at ch. 0 M of Main Canal.
Item No. 1 :Earthwork in excavation in foundation of canal structures in all types of soil as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head lead to a safe distance from the working place & depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation all complete as directed at site. (Including bailing out stagnant rain water where necessary).n all types of soil (except soil mixed with gravel and boulder)
Item No. 2 : Collecton of sand gravel (40 % sand gravel (40% sand and 60 % gravel of size 25 mm to 60 mm ) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete .
Item No. 3 : Labour charge for spreding hard river shingles/sand gravels to required thicjness over approach subway etc. including ramming, dressing the seat before laying the materials lead up to 30 M and lift 1.5 M complete as directed.
Item No. 4 :Cement concrete work in prop. 1:3:6 in foundation/abutment/piers/wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. where necessary complete as directed (Shuttering, scaffolding cost will be paid separately).
Item No. 5 : Centering and shuttering including proping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works, complete as directed. (Measurement oto be taken on the face area timbered).
Item No. 6 : R.C.C. work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in prop. 1:2:4 with hard broken stone aggregates of size 6 mm to 20 mm with proper reinforcement as per design i/c curing etc. with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 7 : Supplying, fitting, fixing and laying reinforcement (TATA) in position in R.C.C. work including cutting, bending, cranking with two plies 0.91 mm (20 BWG) annealed wire, hooking, tying complete as directed. At bed, 10 mm dia @ 125 mm c/c (Top & Bottom)
Item No. 8:Earth work in back filling of structures with earth obtained from out side borrow pits filling with 15 cm layers, ramming, dressing watering including paying compensation of land if any.( With lead up to 30.00 M and lift 1.50 M).
Reconstruction of D2 canal from ch. 0 to 120m and renovation from ch 120 to 983m.
Item No. 1 :Labour cost for dismantling of old cc lining and carriage of the materials and depositing the same at a safe distance as directed.
Item No. 2 : Dismantling old plastering works and racking out joints including carriage and stacking the materials at a safe place as directed complete.
Item No. 3 : Earthworkin excavtion in Irrigation canal to the designed section and grade by depositing the spoils in form of embankment in 15 mm layers on both banks as necessary including clearing light jungles ,removing trees upto 15 cm dia and uprooting roots and stamps etc. from the seat of the embankment and canal free from all vegetaion including breaking clods not more than 10mm cube,ramming ,dressing and roughening the seat of emabankment with a lead upto 30m and lift 1.5m complete as directed.
Item No. 4 : C.C. work in prop. 1 : 4 : 8 in foundation /abutments / piers/ wing walls etc. with hard broken stone aggr. Of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necy. complete as directed. (Shuttering, scaffolding cost will be paid separately.)
Item No. 5 : 1st. class brick work in cement mortar in abutment and wing wall, parapet wall etc. Including racking out joints and curing etc. complete. (ii) In proportion 1:4
Item No. 6 : Soling in foundation floor at all levels including filling inter sides, ramming etc. complete as directed and of specified thickness with 9cm brick on flat including sand packing.
Item No. 7 : C. C. Work in proportion 1:2:4 in foundation/ abutment/ pier/ wing walls etc. With hard broken stone of agg. size 6mm to 20mm including curing with necessary timber shuttering, scaffolding etc. Where necessary complete as directed (shuttering , scaffolding cost will be paid separately).
Item No. 8 : 12mm thick cement plastering including clearing surface and curing complete as directed. In proportion 1:3
Item No. 9 : Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling
Raising & Strengthening of canal embankment of Main Canal from ch. 0 M to 582 M
Item No. 1 : Earth work in filling in all soils in canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 Km including paying compensation of earth obtained from private land if any, loading, unloading, spreading the same including cutting light jungle, removing trees up to 15 cm dia and uprooting roots & stamps etc, from the seat of embankment, breaking clods not more than 10 mm cube, ramming, profilling etc. with all lifts complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Item No. 2 : Earthwork in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15 cm layers on both banks as necessary including clearing light jungle, removing trees up to 15 cm dia and uprooting roots & stumps etc. from the seat of embankment and canal free from all vegetation including breaking clods not more than 10 mm cube, ramming,dressing and roughening the seat of embankment with a lead up to 30 M and lift up to 1.5 M complete as directed.
BALAJI CONSTRUCTIONS
SRI PANKAJ KALITA
HAJIBUR ALI
litan kumar chanda
Nabajit Choudhury
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .