Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 CrAdmitted-Finance R O FIRDOUS COLONY BUCHPORA SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | L1 | Admitted-Finance | ||
| 2 | L2₹4.4 Cr+₹15.0 L (3.49%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical | - | Rejected-Technical Non-Responsive | ||
| 4 | Rejected-Technical | - | Rejected-Technical Non-Responsive | ||
| 5 | Rejected-Technical | - | Rejected-Technical Non-Responsive |
Tender Value
₹5.4 Cr
EMD Value
₹10.7 L
Closing Date
6 Sept 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Exeuctive Engineer RNB Budgam
Engineering complex Budgam
Construction of Balance Buildings of Transit Accommodation at Kakenmarn
2024_PWDJK_258050_1
NIT_NO_40_MDB of 2024-25
Open Tender
Civil Works
Percentage
365 days
Budgam
Please refer Tender documents.
8 documents required · 8 mandatory
₹8,500
Executive Ecngineer RNB Budgam
₹10.7 L
Superintending Engineer RNB Circle Budgam
17 Oct 2024
17 Aug 2024
7 Sept 2024
17 Aug 2024
6 Sept 2024
20 Aug 2024
19 Aug 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (all width ) and for shafts, wells, cesspits and the like exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms all lifts , including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 968.6 | CUM | 256.85 | ₹2,48,784.91 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1,173.97 | CUM | 218.4 | ₹2,56,395.05 |
| 3 | P/L of dry Stone soling hand packed and consolidated with hand Rammers in trenches of foundation including all carriages complete job | 82.33 | CUM | 1,000 | ₹82,330 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all carriages leads lifts complete | 78.34 | CUM | 5,202.9 | ₹4,07,595.19 |
| 5 | Providing and laying in position pf specified grade of Reinforced cement concrete work in beams, slabs , walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages leads lifts complete. All work upto plinth level | 268.12 | CUM | 7,788.4 | ₹20,88,225.81 |
| 6 | All work above plinth level | 512.32 | CUM | 9,608.7 | ₹49,22,729.18 |
| 7 | Providing and laying in position cement concrete of specified grade M-10 excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 68.46 | CUM | 5,733.6 | ₹3,92,522.26 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for foundations | 872.05 | SQM | 286.35 | ₹2,49,711.52 |
| 9 | Columns | 1,303.12 | SQM | 742.55 | ₹9,67,631.76 |
| 10 | Suspended floors roofs shelves | 1,719.65 | SQM | 718.2 | ₹12,35,052.63 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
Tendernotice_2.pdf
PDF • 1.19 MB
Tendernotice_2.pdf
Tender Document • 1.19 MB
Tendernotice_1.pdf
Tender Document • 1.12 MB
Exten-40.pdf
Tender Document • 1.02 MB
Corrg_II_40.pdf
Tender Document • 0.78 MB
Corrig-40_41.pdf
Tender Document • 0.30 MB
BOQ_760227.xls
BOQ • 0.35 MB
BOQ_760227.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .