| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹8.1 L+₹1.4 L (20.1%)Accepted-Finance | L2 | Accepted-Finance L2 |
Tender Value
₹10.0 L
EMD Value
₹19,960
Closing Date
21 Jul 2026, 6:00 pmClosed
Executive Engineer
PWD (RandB) Division Udhampur
Reconstruction of lane and drain Near Gopal Ghat Shiv Mandir ward no 17 udhampur , Construction of lane from H o Roshan to H o Ibrahim Onwards Ward no 17 Udhampur, Repair and Renovation of lane and drain From H o Suram Singh to H o Sandok Singh
2026_PWDJK_315813_4
e-NIT 72 of 2026-27 dated 13.07.2026
Open Tender
Civil Works
Percentage
90 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB Division Udhampur
₹19,960
5 Aug 2026
13 Jul 2026
22 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kind of soil | - | cum | 479.3 | - |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | 1,725.2 | - |
| 3 | Demolishing R.C.C. work manually/by mechanical means including
stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | - | cum | 2,516.85 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 11 | cum | 4,826.5 | ₹53,091.5 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) ( 20% PLUM) | - | cum | 4,774.46 | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | CUM | 7,788.4 | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars | - | KG | 123.2 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 81.76 | sqm | 286.35 | ₹23,411.98 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms | - | sqm | 718.2 | - |
| 10 | Disposal of mulba 5km by MT | 5.25 | cum | 200.74 | ₹1,053.89 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_1026291.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .