Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-AOC VILLAGE DALOG P O NARAIN TEHSIL RAMPUR BUSHAHR DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 171001 | 1 | Accepted-AOC 1st lowest | |
| 2 | 2₹3.7 L+₹16,870.90 (4.76%)Rejected-Finance | 2 | Rejected-Finance 2nd lowest | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.4 L
EMD Value
₹6,700
Closing Date
26 Dec 2025, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
SH C.O wire crate R.wall at RD 61.610 to 61.630 and V.shape drain in Km. 61.390 to 61.600
2025_PWD_124074_1
PW/RMP/TA/8906 dated 18.12.2025
Open Tender
Civil Works - Roads
Percentage
EE B and R Division Rampur
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
Yes
₹6,700
Yes
7 Apr 2026
20 Dec 2025
26 Dec 2025
20 Dec 2025
26 Dec 2025
20 Dec 2025
20 Dec 2025 - 26 Dec 2025
Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads , dressing of sides and bottom and back filling in trenches with excavated suitable material in ordinary soil upto all depth. as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:3:6( 1 cement : 3 sand :6 graded stone aggregate 40mm nominal size) including carriage of material within all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge.
Providing and laying boulder apron laid in wire crates mate with G.I.wire confirming to IS :280 & IS 4826 in 100mmx100mm mesh (weaved diagonally including 10% extra for laps and joints laid with stone boulder weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 including the cost form work and hauling of materials through all modes of transportation within all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 with granular material. including the cost of form work and hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
SBD.pdf
Tender Documents • 2.73 MB
BOQ_182338.xls
BOQ • 1.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .