Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.9 LAccepted-AOC 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹32.9 L Quoted ₹33.4 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹34.0 L+₹61,132.50 (1.83%)Rejected-Finance | ₹34.0 L+₹61,132.50 (1.83%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹34.4 L+₹1.0 L (3.04%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹34.4 L+₹1.0 L (3.04%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹34.9 L+₹1.5 L (4.39%)Rejected-Finance LAMA VILLA DYMMIEW SHILLONG 793002 | EAST KHASI HILLS | MEGHALAYA | 793002 | ₹34.9 L+₹1.5 L (4.39%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹35.3 L+₹1.9 L (5.68%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG 793009 MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹35.3 L+₹1.9 L (5.68%) | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | M/S BISWA CONSTRUCTION L3 | M/s M.L Consortium L1 | HIGHTECHMETALS(INDIA) L2 | M/S DEEDAR ENTERPRISE L5 | Kshir Furnishers and Builders L10 | S K ENTERPRISE L5 | M/S DIL SINGH BISWA AND CO L4 | M/s A L Traders L11 | M/s Gupta Construction L7 | M/S. Zoya Construction L9 | R K CONSTRUCTION L8 | MAHINDER ELECTRICALS L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for preparation of old or previously treated steel surfaces of CGI roof sheets of any description over 10 cm width or girth and applying one finishing coat of synthetic enamel paint complete all as specified. | 3,000 | Square Meter | 100 ₹3,00,000 | 93 ₹2,79,000 | 90 ₹2,70,000 | 110 ₹3,30,000 | 140 ₹4,20,000 | 110 ₹3,30,000 | 80 ₹2,40,000 Lowest | 125 ₹3,75,000 | 120 ₹3,60,000 | 120 ₹3,60,000 | 120 ₹3,60,000 | 120 ₹3,60,000 |
| 2.00 | Material and labour for 15 mm thick rendering in two layers (10 mm + 5 mm) on fair faces of brick or concrete surfaces in cement mortar 1:6 finshed even and smooth without using extra cement complete all as specified. | 1,545 | Square Meter | 500 ₹7,72,500 | 350 ₹5,40,750 Lowest | 450 ₹6,95,250 | 420 ₹6,48,900 | 400 ₹6,18,000 | 420 ₹6,48,900 | 350 ₹5,40,750 Lowest | 380 ₹5,87,100 | 430 ₹6,64,350 | 440 ₹6,79,800 | 450 ₹6,95,250 | 450 ₹6,95,250 |
| 3.00 | Demolition of cement Concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as directed. | 231.75 | Cubic Meter | 1,000 ₹2,31,750 | 2,000 ₹4,63,500 | 1,250 ₹2,89,687.5 | 940 ₹2,17,845 | 900 ₹2,08,575 Lowest | 940 ₹2,17,845 | 1,000 ₹2,31,750 | 1,500 ₹3,47,625 | 960 ₹2,22,480 | 950 ₹2,20,162.5 | 950 ₹2,20,162.5 | 1,500 ₹3,47,625 |
| 4.00 | Dismantling of Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings complete all as directed. | 670 | Square Meter | 50 ₹33,500 | 100 ₹67,000 | 150 ₹1,00,500 | 50 ₹33,500 | 80 ₹53,600 | 50 ₹33,500 | 60 ₹40,200 | 30 ₹20,100 Lowest | 48 ₹32,160 | 60 ₹40,200 | 60 ₹40,200 | 65 ₹43,550 |
| 5.00 | Supply and fix pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet 0.50 mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws as specified
Note: During removing of old sheet, side/end sheet shall be refixed with new sheet. No extra cost shall be made to the contractor. | 550 | Square Meter | 1,200 ₹6,60,000 | 1,000 ₹5,50,000 | 1,450 ₹7,97,500 | 1,300 ₹7,15,000 | 1,300 ₹7,15,000 | 1,300 ₹7,15,000 | 980 ₹5,39,000 Lowest | 1,300 ₹7,15,000 | 1,380 ₹7,59,000 | 1,350 ₹7,42,500 | 1,350 ₹7,42,500 | 1,150 ₹6,32,500 |
| 6.00 | Supply and fix pre-painted galvalume aluminum zinc coating GI based Plain steel sheet 0.50mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws as specified
Note: During removing of old sheet, side/end sheet shall be refixed with new sheet. No extra cost shall be made to the contractor. | 120 | Square Meter | 1,220 ₹1,46,400 | 1,000 ₹1,20,000 | 1,500 ₹1,80,000 | 1,300 ₹1,56,000 | 1,500 ₹1,80,000 | 1,300 ₹1,56,000 | 500 ₹60,000 Lowest | 1,200 ₹1,44,000 | 1,380 ₹1,65,600 | 1,350 ₹1,62,000 | 1,350 ₹1,62,000 | 1,150 ₹1,38,000 |
| 7.00 | Material and labour for wire brushing and cleaning top surface of tiles, lime terracing or cement concrete, including flashings and junction of parapets, etc., and surface painting, with a layer of blown grade bitumen of any penetration applied hot @ 1.7 kg per sqm, blinded with grit or pea size gravel @ 0.006 cum per sq.m, and lightly tampered (area of flashings, etc., shall be added to the roof area) and providing APP based polymeric membrane minimum weighing 3kg/sqm and minimum 3 mm thick reinforced with polyster non wove fabric (wt. not less than 150 gms/sqm) land on primed surface by forced application with overlap 15 cms on joints and torching the joints complete all as specified and as directed by Engineer-In-Charge. | 345 | Square Meter | 2,000 ₹6,90,000 | 550 ₹1,89,750 Lowest | 580 ₹2,00,100 | 2,200 ₹7,59,000 | 1,900 ₹6,55,500 | 2,200 ₹7,59,000 | 1,200 ₹4,14,000 | 1,300 ₹4,48,500 | 2,180 ₹7,52,100 | 2,300 ₹7,93,500 | 2,250 ₹7,76,250 | 750 ₹2,58,750 |
| 8.00 | Disconnecting existing tanks of Capacity exceeding 250 ltr but not exceeding 500 ltr, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position including cleaning repairing, etc.as directed by Engineer-In-Charge.
Note: Replacement of ball valve shall be measured under this item but material shall be paid under Supply only in the respective item. | 61 | Each | 1,000 ₹61,000 | 1,500 ₹91,500 | 450 ₹27,450 Lowest | 1,200 ₹73,200 | 1,100 ₹67,100 | 1,200 ₹73,200 | 500 ₹30,500 | 1,500 ₹91,500 | 1,180 ₹71,980 | 1,300 ₹79,300 | 1,350 ₹82,350 | 1,500 ₹91,500 |
| 9.00 | Disconnecting existing tanks of Capacity exceeding 500 ltr but not exceeding 1000 ltr, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position including cleaning repairing, etc.as directed by Engineer-In-Charge.
Note: Replacement of ball valve shall be measured under this item but material shall be paid under Supply only in the respective item. | 25 | Each | 1,000 ₹25,000 | 2,200 ₹55,000 | 650 ₹16,250 Lowest | 1,200 ₹30,000 | 1,100 ₹27,500 | 1,200 ₹30,000 | 800 ₹20,000 | 2,000 ₹50,000 | 1,180 ₹29,500 | 1,300 ₹32,500 | 1,250 ₹31,250 | 2,500 ₹62,500 |
| 10.00 | Preparing the RCC surface by throughly cleaning with wire brushes or by scrappers or as per the directeion by the Engineer-In-Charge. Followed by washing for making the surface absolutely free from any foreign particles like dust, oil, grases or weeds etc. and allowed surface dry, afterthat breaking, removing and chipping of brickbats corba, tar felt or any other protective screed or layer over roof slabs etc. (upto 50 mm thickness) and applying two coats of polyurethane polymer membrane, priming the surface with fiber-reinforced elastomeric liquid waterproofing membrane with water @ 30-40%. After 3-4 hours applying 1st coat of undiluted coating by brush/ roller. After 6 hours, recoating the surface with 2nd coat as a final coat complete all as per direction of manufacturer. | 1,200 | Square Meter | 400 ₹4,80,000 Lowest | 750 ₹9,00,000 | 650 ₹7,80,000 | 400 ₹4,80,000 Lowest | 600 ₹7,20,000 | 400 ₹4,80,000 Lowest | 1,050 ₹12,60,000 | 800 ₹9,60,000 | 460 ₹5,52,000 | 450 ₹5,40,000 | 450 ₹5,40,000 | 750 ₹9,00,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
28 May 2026, 6:00 pmClosed
GE (I) (AF) Shillong
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
REPAIR OR MAINTENANCE OF RCC OR GALVALUME SHEET, RCC ROOF AND ROOF PAINTING AT HQ EAC (U) AF UNDER GE (I) (AF) SHILLONG
2026_MES_763844_1
8019/26/E8
Open Tender
Civil Works
Item Rate
180 days
GE (I) (AF) Shillong
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (I) (AF) Shillong
₹60,000
Yes
13 Jun 2026
7 May 2026
30 May 2026
7 May 2026
28 May 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for preparation of old or previously treated steel surfaces of CGI roof sheets of any description over 10 cm width or girth and applying one finishing coat of synthetic enamel paint complete all as specified. | 3,000 | Square Meter | - | - |
| 2 | Material and labour for 15 mm thick rendering in two layers (10 mm + 5 mm) on fair faces of brick or concrete surfaces in cement mortar 1:6 finshed even and smooth without using extra cement complete all as specified. | 1,545 | Square Meter | - | - |
| 3 | Demolition of cement Concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as directed. | 231.75 | Cubic Meter | - | - |
| 4 | Dismantling of Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings complete all as directed. | 670 | Square Meter | - | - |
| 5 | Supply and fix pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet 0.50 mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws as specified
Note: During removing of old sheet, side/end sheet shall be refixed with new sheet. No extra cost shall be made to the contractor. | 550 | Square Meter | - | - |
| 6 | Supply and fix pre-painted galvalume aluminum zinc coating GI based Plain steel sheet 0.50mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws as specified
Note: During removing of old sheet, side/end sheet shall be refixed with new sheet. No extra cost shall be made to the contractor. | 120 | Square Meter | - | - |
| 7 | Material and labour for wire brushing and cleaning top surface of tiles, lime terracing or cement concrete, including flashings and junction of parapets, etc., and surface painting, with a layer of blown grade bitumen of any penetration applied hot @ 1.7 kg per sqm, blinded with grit or pea size gravel @ 0.006 cum per sq.m, and lightly tampered (area of flashings, etc., shall be added to the roof area) and providing APP based polymeric membrane minimum weighing 3kg/sqm and minimum 3 mm thick reinforced with polyster non wove fabric (wt. not less than 150 gms/sqm) land on primed surface by forced application with overlap 15 cms on joints and torching the joints complete all as specified and as directed by Engineer-In-Charge. | 345 | Square Meter | - | - |
| 8 | Disconnecting existing tanks of Capacity exceeding 250 ltr but not exceeding 500 ltr, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position including cleaning repairing, etc.as directed by Engineer-In-Charge.
Note: Replacement of ball valve shall be measured under this item but material shall be paid under Supply only in the respective item. | 61 | Each | - | - |
| 9 | Disconnecting existing tanks of Capacity exceeding 500 ltr but not exceeding 1000 ltr, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position including cleaning repairing, etc.as directed by Engineer-In-Charge.
Note: Replacement of ball valve shall be measured under this item but material shall be paid under Supply only in the respective item. | 25 | Each | - | - |
| 10 | Preparing the RCC surface by throughly cleaning with wire brushes or by scrappers or as per the directeion by the Engineer-In-Charge. Followed by washing for making the surface absolutely free from any foreign particles like dust, oil, grases or weeds etc. and allowed surface dry, afterthat breaking, removing and chipping of brickbats corba, tar felt or any other protective screed or layer over roof slabs etc. (upto 50 mm thickness) and applying two coats of polyurethane polymer membrane, priming the surface with fiber-reinforced elastomeric liquid waterproofing membrane with water @ 30-40%. After 3-4 hours applying 1st coat of undiluted coating by brush/ roller. After 6 hours, recoating the surface with 2nd coat as a final coat complete all as per direction of manufacturer. | 1,200 | Square Meter | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tender8019.pdf
Tender Documents • 0.93 MB
BOQ_855578.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .