Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC 202 NEW RAM VIHAR COLONY PINTO PARK MORAR GWALIOR 474005 | GWALIOR | GWALIOR | MP | 474005 | ₹13.5 L Quoted ₹13.6 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹14.1 L+₹50,190 (3.68%)Rejected-Finance | ₹14.1 L+₹50,190 (3.68%) | L2 | Rejected-Finance OTHER THAN LOWEST |
| 3 | L3₹14.2 L+₹59,094 (4.33%)Rejected-Finance 801802 SAKAR IV OPP MJ LIBERARY ELLISBRIDGE ASHRAM ROAD AHMEDABAD AHMEDABAD GUJARAT 380006 | 801802 | ₹14.2 L+₹59,094 (4.33%) | L3 | Rejected-Finance OTHER THAN LOWEST |
| 4 | L4₹42.4 L+₹28.8 L (210.8%)Rejected-Finance WZ 109 PLOT NO 327 CHAND NAGAR NEW DELHI | ₹42.4 L+₹28.8 L (210.8%) | L4 | Rejected-Finance OTHER THAN LOWEST |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not meeting eligilibility criteria |
Tender Value
₹15.1 L
EMD Value
₹30,200
Closing Date
24 Aug 2020, 6:00 pmClosed
GE BHOPAL
GE BHOPAL BAIRAGARH BHOPAL
COMPREHENSIVE MAINTENANCE OF MODERNISED WATER SUPPLY SYSTEM (SCADA) AND CONNECTED WORKS AT SI LINES UNDER GE BHOPAL
2020_MES_359057_1
8699/E8
Open Tender
Electrical and Maintenance Works
Item Rate
333 days
BHOPAL
CLASS E Cat a ii
6 documents required · 6 mandatory
₹500
Yes
GE BHOPAL
₹30,200
Yes
10 Oct 2020
7 Jul 2020
26 Aug 2020
7 Jul 2020
24 Aug 2020
22 Jul 2020
Amount
NOTES FOR ITEM NO 2 :- The contractor will attend all complaints regarding malfunctioning of software, modems, Simcards, Messaging system, Alarm system, etc all as directed by Engr-in-charge. All materials required for the work shall be provided by the department or paid against items mentioned below (BOQ serial item No.4.00 to 27.00) as supply only rate and cost of labour for taking out/ dismantling and fixing of new item shall be deemed to be included in the quoted rate of BOQ item No.2.00. Any complaint un-attended for more than 24 hrs will invite a penalty of Rs. 500/- per day. Decision of GE regarding penalty shall be final and binding.
Comprehensive maintenance of SCADA based water supply pumping and distribution system by employing one trained technician in each shift for 03 Shifts (each shift of 08 hrs, shift timings will be as directed by Engineer-in-charge) i.e. 03 technician per day, ITI qualified (trade as per requirement of Engineer-in-charge) with at least 01 (one) year experience in the relevant field OR matriculate with atleast 05 (five) years experience in the relevant field and requiste certificates in this regard including carrying out repairs, maintenance and servicing of all PLC panels and all connected circuit and accessories as required for all the modernised water supply system as described below at SI Line Bhopal under GE Bhopal as follows:- (a) Servicing and maintenace/repairs and replacement of defective components/spare parts of PLC based control panels including all accessories modem, antenna etc. installed at various pump houses, OHT and Master control station ,Mimic panel. (b) Repair/maintenance by disconnecting, cleaning, greasing for wear and tear complete servicing, refixing, lathing installing and commission of all motorised valves, Pressure switch, Ultrasonic level sensor. (Contd...)
Item No 2 contd.. The scope of work also covers:- (i) Any changes to the Programmable Logic Controller(PLC), e.g. Changes in ladder logic of programme, changes in operational timing, etc. (limited to the scope of items covered under this AMC) (ii) Any changes to the SCADA software, e.g. Changes in report format, changes in operational screens, creation of soft keys etc. (limited to the scope of items covered under this AMC) (iii) SCADA reports related to all the systems to be mailed to AGE/JE on every week (iv) To attend break down maintenance ( within 4 hours of reported time) and replacement of unservicable spare parts as required at site complete all as specified and directed by Engineer in charge Note (i) All components/spare parts replaced shall be measured and paid seperatly as supply only item mentioned in schedule ,fixing charges shall deemed to be include in this item. (2) All the calls related to unservicability/ break down of the system should be attend with in 4 hours, if failed so a penalty of Rs 1000/- can be imposed on each day untill the system gets repaired . (3) The quoted rate shall also inclusive of all the charges for the communications, i.e. 01 Nos bsnl broad band connection with static IP at Pump House and GPRS enabled data cards used in all PLC based panel related to this scope of work.
Item No 2 contd.. Note :- (a) The servicing of Motorised valve, PLC base control Panels, Mimic Panels shall be done by authorized representative of the Manufacturer only. The technician shall submit a letter from the manufacturer as proof of his being a authorised representative of the manufacturer. The technician shall also submit a signed report on original letter head of the manufacturer that servicing as been carried out by him. (b) Any changes to the Programmable Logic Controller (PLC), e.g. changes in ladder logic of programme, changes in operational timing, etc. (limited to the scope of work covered under this AMC) shall be carried out by authorized representative of the Manufacturer of PLC based Panels only. The programmer shall submit a letter from the manufacturer as proof of his being an authorized representative of the manufacturer. The programmer shall also submit a signed report on original letter head of the manufacturer that servicing as been carried out by him. (c) Any changes to the SCADA software, e.g. changes in report format, changes in operational screens, creation of soft keys etc. (limited to the scope of work covered under this AMC) shall be carried out by authorized representative of the Manufacturer of PLC based Panels only. The technician shall submit a letter from the manufacturer as proof of his being a authorized representative of the manufacturer. The technician shall also submit a signed report on original letterhead of the manufacturer that servicing has been carried out by him.
Upgradation of existing SCADA Software, with new additional features and upgradation of reporting software.a). Upgradation of existing CPU with scada compactible operating system, anti virus etc upgradation to the SCADA software, shall be carried out by authorized representative of the original scada developer only. The Engineer shall submit a letter as proof of his being a authorized representative of the original scada developer. New system which is compactible to run 24 X 7 basis, specification as follows PC -INTEL CORE I5 Processor,4GB RAM DDR3,500GB HDD, Make: ( IBM/HP/COMPAQ/DELL) key board, mouse , 32 inch flat monitor( Make: SAMSUNG/LG/AOC),
Supply only single phase Preventor Model 1 :VSP D2 complete all as specified & directed. [Make - Minilec or equivalent as approved by GE]
Supply only Relay with base 4 C/O /24 V DC complete all as specified & directed. [Make LEONE/IDEC or equivalent as approved by GE]
Supply only Relay with base 4 C/O 240V AC complete all as specified & directed. [Make LEONE/IDEC or equivalent as approved by GE]
Supply only LED Indicator Colour/Red /yellow/Green/Blue complete all as specified & directed. [Make : ESBEE / TEKNIC/TELEMEACHNIQUE or equivalent as approved by GE]
Supply only PLC (Programmable Logic Controller) complete all as specified & directed. [Make :Mitsubishi or equivalent as approved by GE]
Supply only I/O module for Programmable Logic Controller complete all as specified & directed. [Make :Mitsubishi or equivalent as approved by GE]
Supply only HMI for Programmable Logic Controller complete all as specified & directed. [Make :Mitsubishi /Renu or equivalent as approved by GE]
Supply only push button with LED Indicator - 240 V A.C. Colour Red /Green or equivalent as approved by GE. [Make : ESBEE / TEKNIC/TELEMEACHNIQUE or equivalent as approved by GE]
Supply only Buzzer - 240 V A.C complete all as specified & directed. [Make : C&S / MIMIC or equivalent as approved by GE]
Supply only of Flow switch complete all as specified & directed. [Make : Rapid controls / Donfoss / Indfoss or equivalent as approved by GE]
Supply only of Pressure switch complete all as specified & directed. [Make Indfoss/Danfoss or equivalent as approved by GE]
Supply only Electric motor suitable for Actuator following size complete all as specified and directed. [Make: Ritetork or equivalent as approved by GE]
50/80 mm dia
100 mm dia
150 mm dia
Supply only Butterfly valve for the following size complete all as specified and directed. [Make: AUDCO/VIRGO/L&T/INTERVALVE or equivalent as approved by GE]
50 mm dia
80 mm dia
100 mm dia
150 mm dia
Supply only Capacitor for Actuator suitable for 50/80/100/150 mm dia Motorized Butterfly Valve complete all as specified & directed.
Supply only Resistor for Actuator suitable for 50/80/100/150 mm dia motorized Butterfly Valve complete all as specified & directed.
Supply only Limit switch for Actuator suitable for 50/80/100/150 mm dia motorized Butterfly Valve complete all as specified & directed.
Supply only SMPS input 230 V/AC, Output 24V DC., 5A complete all as specified & directed. [Make: NHP/TELEMEHANIQUE or equivalent as approved by GE]
Supply only Ultrasonic Level Sensor range 0-5M complete all as specified & directed. [Make: Banner or equivalent as approved by GE]
Supply only GPRS Modem complete all as specified & directed.
Supply only 9DB Antenna GPRS Modem complete all as specified & directed.
Supply only UPS Battary complete all as specified & directed. [Make Exide or equivalent as approved by GE]
Supply only 2 KVA UPS complete all as specified & directed. [Make -Numeric or equivalent as approved by GE]
Supply only MCB 3P 6A complete all as specified & directed. [Make -LEGRAND or equivalent as approved by GE]
Deduct schedule of credit (calculation will be done off line) Rs.15,935.00
Recktronic Devices and Systems
CIMCON SOFTWARE INDIA PVT. LTD.
Suman Uni Controllers
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .