Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹10.7 L+₹2,973.60 (0.28%)Accepted-Finance | L2 | Accepted-Finance ok |
Tender Value
Refer Docs
EMD Value
₹21,500
Closing Date
16 Aug 2024, 2:30 pmClosed
EE EnM HP I
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Renovation of Bharat Bijlee Ltd. Make 1250 KVA transformer No. 1 installed at Raw Water Pump House II.
2024_DJB_260863_7
NIT 7
Open Tender
Miscellaneous Works
Works
60 days
Haiderpur WTP
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹21,500
20 Aug 2024
9 Aug 2024
16 Aug 2024
9 Aug 2024
16 Aug 2024
9 Aug 2024
Renovation of Bharat Bijlee Ltd. Make 1250 KVA transformer No. 1 installed at Raw Water Pump House-II. With following works:- Disconnecting of HT supply from main HT panel after proper switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservator tank all protection relays, cable end boxes vent pipes and other items as required.
Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc.
Cleaning of winding with DC 2-26
Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage.
Replacement of salica gel.
Repairing of tape changer
Repairing of LT Copper bolt and Pam, remettaling and finishing the same as per original shape and size
Checking & matching of control wiring of all protection relays and calibration of bucchlaz relay and protection relays testing the same.
Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides with HI pot machine.
P/Fixing of winding protection pad
Repair of cooling fins, replacement of cooling fins gasket and oil seal for stopping the leakage
Filling of T/oil to up to top up level as required to make Savita/ Power
Dehydration & filtration of complete transformer oil and checking the die electric strength up to 50 KV at site as required
Complete cleaning and chemically washing of oily and muddy transformer body and painting of transformer with enamel paint.
Insulating the bus bar with epoxy paint
M.B. Enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .