Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-Finance 270 17TH WARD KARUMALAIKOODAL METTUR DAM 2 | METTUR DAM | L1 | Accepted-Finance L1 |
Tender Value
₹1.6 L
EMD Value
₹1,700
Closing Date
22 Feb 2021, 2:00 pmClosed
SUPERINTENDING ENGINEER /ELECTRICAL SYSTEMS /MTPS1
Superintending Engineer Electrical System Mettur Thermal Power Station I Mettur Dam-636406
MTPSI ES Circle EM II Division Boiler and Mill Plant areaTemporary provision of LT welding panels at Boiler Mill Plant area and releasing of Power cable Neutral links for inspection refixing the power cables neutral links after cleaning in the etc
2021_EB_196129_1
SE/ES/MTPS1/EMII/OT107/2020-21
Open Tender
Electrical Works
Works
10 days
MTPS1 METTUR DAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹1,700
Yes
24 Feb 2021
15 Feb 2021
23 Feb 2021
15 Feb 2021
22 Feb 2021
15 Feb 2021
15 Feb 2021 - 22 Feb 2021
Amount
Charges for transporting of LT welding panel from one unit to another unit and erecting the LT welding panels at Boiler 41 Mtr, Mill Plant 16 mtr feeder floor, Mill Plant 4.5 mtr floor and Mill plant “0” mtr area of Unit-1, Unit-2 & Unit-3.
Charges for Laying of 3½ C x 70 Sq.mm (or) 3½ C x 120 Sq.mm LTUG cable from Pillar Box to Temporary welding panel kept at various locations of Boiler and Mill Plant area.
Charges for glanding and termination of 3½ C x 70 sq. mm (or) 3½ C x 120 Sq.mm LTUG cable at Welding panel end and Pillar box end.
Charges for Releasing of 3½ C x 70 Sq.mm (or) 3½ C x 120 Sq.mm LTUG cable from Pillar box to Temporary welding panel kept at various locations of Boiler and Mill Plant area.
Charges for Determination of 3½ C x 70 sq. mm (or) 3½ C x 120 Sq.mm LTUG cable at Welding panel end and Pillar box end.
Charges for removing of power cable terminal box cover and neutral link covers, releasing of power cable and disconnection of neutral link 3 Nos. for MRT testing for Unit-1, Unit-2 & Unit-3 (BHEL make 6.6 Kv, 1500 KW, 744rpm ID Fan motor, 1250 KW, 1487rpm PA/FD Fan motor, 800 KW, 990 rpm, FD Fan motor & 340 KW, 992 rpm Coal Mill Motor)
Charges for cleaning of power cable box and neutral box covers, reconnection of power cable and neutral links after MRT testing and refixing of power cable terminal box cover and neutral link box covers for Unit-1, Unit-2 & Unit-3 (BHEL make 6.6 Kv, 1500 KW, 744 rpm ID Fan motor, 1250 KW, 1487 rpm PA/FD Fan motor, 800 KW, 990 rpm FD Fan motor & 340 KW, 992 rpm Coal Mill Motor).
Cost of consumables for cleaning of Power cable & Neutral link box covers at PA,FD,ID & Coal Mill Motors
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .