Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.9 L
Closing Date
30 Dec 2021, 4:30 pmClosed
XEN REW KATHUA
XEN REW KATHUA
Renovation of pond at Poungran near sudesh kumar house
2021_RDPR_154792_20
e-NIT No. 238 REW/K of 2021 Dated 23 /12/
Open Tender
Civil Works
Item Rate
30 days
nagrota gujroo
sbd
2 documents required · 2 mandatory
₹500
Yes
XEN REW KATHUA
Exempted
8 Jan 2022
24 Dec 2021
31 Dec 2021
25 Dec 2021
30 Dec 2021
25 Dec 2021
Amount
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5mrespectively ) Wet
Disposal of Silt from stite by means of MT
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge. All kinds of soil
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)(Including all leads and lifts carriages of material by MT/HL)
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)(Including all leads and lifts carriages of material by MT/HL)
Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete.
Dry stone pitching (any thickness) excluding cost of stones.On Slopes(Including all leads and lifts carriages of material by MT/HL
Supply of stones
Providing and fixing CIB of approved size by way of making foundation in M10, Brickwork in 1:6 cement mortar including plastering with 1:4 cement mortar, painting and writings as per the directions of engineer incharge including all carriages , supply , complete job.
ROSHAN LAL
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .