Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-Finance | ₹13.9 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹14.0 LAccepted-Finance | ₹14.0 L | L2 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | M.Basheer Contractor L2 | MITTATHAR ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.001.Strengthening of road from Pudur Thamaraipatti road to Karummakuttai (via) Pudur Burial Ground Km 0/0 - 0/349 H/o Pudur Punganai ( R- 397 ) Estimate Amount : Rs.14.140 Lakhs | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 314.1 | Sqm | 6.42 ₹2,016.52 | 6.36 ₹1,997.68 |
| 3.00 | Picking existing BT surface including all labour and materials etc complete | 446.67 | Sqm | 23.6 ₹10,541.41 | 23.35 ₹10,429.74 |
| 4.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms | 20.94 | Cum | 330.76 ₹6,926.11 | 327.22 ₹6,851.99 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 201 | Cum | 2,697.45 ₹5.4 L | 2,668.61 ₹5.4 L |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,340 | Sqm | 87.5 ₹1.2 L | 86.57 ₹1.2 L |
| 8.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,340 | Sqm | 20.49 ₹27,456.60 | 20.27 ₹27,161.80 |
| 9.00 | Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 33.5 | Cum | 11,768.49 ₹3.9 L | 11,642.67 ₹3.9 L |
| 10.00 | Rumble Strip | 2.81 | Sqm | 387.01 ₹1,087.50 | 382.87 ₹1,075.86 |
| 11.00 | Provision for Road marking with Hot applied Themoplastic compound with Reflectoring glass beads in Bituminous surface | 74.3 | Sqm | 899.08 ₹66,801.64 | 889.47 ₹66,087.62 |
Tender Value
₹14.1 L
EMD Value
₹15,000
Closing Date
18 Feb 2026, 3:00 pmClosed
Block Development Officer
BDO office Uthangarai
Krishnagiri District Uthangarai Block Under SEDP - 2025- 2026 Strengthening of road from Pudur Thamaraipatti road to Karummakuttai Via Pudur Burial Ground Km 0/0 - 0/349 at Pudur Punganai R - 397 at Pudur Punganai Panchayat Package No 63
2026_RDTN_658831_1
Roc_757_2026_A4_09.02.2026
Open Tender
Civil Works - Roads
Uthangarai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,000
BDO office Uthangarai
20 Feb 2026
16 Feb 2026
18 Feb 2026
16 Feb 2026
18 Feb 2026
16 Feb 2026
17 Feb 2026
1.Strengthening of road from Pudur Thamaraipatti road to Karummakuttai (via) Pudur Burial Ground Km 0/0 - 0/349 H/o Pudur Punganai ( R- 397 ) Estimate Amount : Rs.14.140 Lakhs
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking existing BT surface including all labour and materials etc complete
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Rumble Strip
Provision for Road marking with Hot applied Themoplastic compound with Reflectoring glass beads in Bituminous surface
Provision for Hm stone
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.59 MB
tb63.pdf
Tender Documents • 0.84 MB
pb63.pdf
Tender Documents • 0.61 MB
BOQ_790424.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid