| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.5 L+₹4,765.96 (0.57%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹8.8 L+₹35,899.75 (4.26%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹10.5 L+₹2.1 L (24.9%)Rejected-Finance | L4 | Rejected-Finance Rejected | |
| 5 | L5₹12.4 L+₹4.0 L (47.6%)Rejected-Finance | L5 | Rejected-Finance Rejected |
Tender Value
₹9.8 L
EMD Value
₹19,700
Closing Date
25 Mar 2022, 10:30 amClosed
Executive Engineer
HP City Transport and Bus Stand Management And Development Authority Tutikandi Shimla -4
SH Construction of Boundary wall
2022_BSMDA_57723_5
HPBSMDA/EE/(2)/2021 Tenders Vol-III
Open Tender
Civil Works
Item Rate
120 days
Pathankot
Please refer Tender Document
9 documents required · 9 mandatory
₹500
HP BSMDA ,Tutikandi Shimla-4
₹19,700
11 Apr 2022
9 Mar 2022
25 Mar 2022
11 Mar 2022
25 Mar 2022
11 Mar 2022
Amount
Demolishing brick work manually/ by mechanical means including stacking of Bricks, hading over usefull material to Department and disposal of unserviceable material up to approved dumping site - in cement mortar , including all leads, lifts and carriage of materials, complete as per entire satisfaction of the Engineer in charge.
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto dumping site and lift upto all heights, as directed by Engineer-in-charges per direction of Engineer-in- Charge. :- In all kinds of soil, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc., including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (One Cement isto Four coarse sand istoEight graded stone aggregate 40 mm (forty millimetre) nominal size, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (One Cement isto Three coarse sand isto Six graded stone aggregate) 20 mm (twenty millimetre) nominal size, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (One Cement isto Two coarse sand isto Four graded stone aggregate 20 mm (Twenty millimetre)nominal size, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.:-Mild steel and Medium Tensile steel bars, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
15 mm (Fifteen millimetre)cement plaster on the rough side of single or half brick wall of mix : 1:4 (One cement isto Four fine sand) including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Finishing walls with water proofing cement paint of required shade:-New work (Two or more coats applied @ 3.84 kg/10 sqm) including cost of Priming coat, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
ANKIT MAHAJAN
M/s Suneet Singh Govt. Contracter
Dharmender Kumar
Amarpreet Govt Contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .