Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.2 L+₹9,798 (4.63%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹2,100
Closing Date
28 Mar 2025, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
FOR ECHP-II- Dismantling of 833 mtrs. SH belt at Conveyor-67 and rolling the released belt and loading, transporting and devolution from Conveyor-67 to Central Stores/TTPS.
2025_EB_532436_1
CE/SE/MI/TTPS/179/2024-2025
Open Tender
Miscellaneous Works
Works
30 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,100
Yes
8 Jul 2025
14 Mar 2025
29 Mar 2025
14 Mar 2025
28 Mar 2025
14 Mar 2025
Charges for cutting and removal of conveyor belt to a length 833 mtr, Rolling the released belt, loading on the lorry after completion of the work and devoluting to store including cost of consumables, hire charges for T&Ps etc., complete.
Charges for assembling of belt drum stand with necessary supports and stiffness providing at conveyor 67 take up area and loading the belt drum in the stand including cost of consumables, hire charges for T&Ps etc., complete.
S.GOPALA KRISHNAN CONTRACTOR (BID ID -1278166)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .