| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.8 LAccepted-AOC | ₹83.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹83.8 LRejected-AOC NEAR SADHURAM SCHOOL RAGHUNATHGANJ KATNI MADHYA PRADESH 483501 | KATNI | MADHYA PRADESH | 483501 | ₹83.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SSM CONSTRUCTION L1 | SURESH & CO L2 |
|---|---|---|---|---|---|
| 1.00Strengthening and Five Year Maintenance of the Road from salem Attayampatti Road S.palam to kadathur Limit via Pethampatti KM 0/0-1/90 H/O Rajapalayam Panchayat | |||||
| 2.00 | Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. | 1,355.76 | Sqm | 6.36 ₹8,622.63 | 6.3 ₹8,541.29 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m | 2,361.25 | Sqm | 23.36 ₹55,158.80 | 23.3 ₹55,017.13 |
| 4.00Providing and laying gravel to 100mm compaceted thick including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction | |||||
| 5.00 | KM 0/0-1/90 | 338.94 | Cum | 341.07 ₹1.2 L | 341 ₹1.2 L |
| 6.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 7.00 | KM 0/0-1/90 | 1,062.56 | Cum | 2,703.64 ₹28.7 L | 2,705 ₹28.7 L |
| 8.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | |||||
| 9.00 | KM 0/0-1/90 | 7,083.75 | sqm | 86.48 ₹6.1 L | 86.5 ₹6.1 L |
| 10.00Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | |||||
Tender Value
₹99.0 L
EMD Value
₹99,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Joint Director/Project Director
DRDA,Salem
Salem District - Veerapandy Block - Strengthening and Five Year Maintenance of the Road from Salem Attayampatty Road S-palam to Kadathur limit via Pethampatty - Rajapalayam Panchayat in NABARD - RIDF- 2026-2027 Package No.28
2026_RDTN_656804_5
Roc.No.875/2026/A3
Open Tender
Civil Works - Roads
180 days
DRDA
As per tender document
3 documents required · 3 mandatory
₹0
₹99,000
DRDA,Salem
22 May 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
16 Feb 2026
Strengthening and Five Year Maintenance of the Road from salem Attayampatti Road S.palam to kadathur Limit via Pethampatti KM 0/0-1/90 H/O Rajapalayam Panchayat
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m
Providing and laying gravel to 100mm compaceted thick including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous and PMB Cubes @ 5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects (using Plastic waste)
Provision of 2 nos. Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre,250mm wide placed at 1m c/c at approval locations to control speed, marked with white strips of road marking paint.
Provision for Hard Bed (0/760-0/777)
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc..
Below sill Level
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Provision for Kilo Metre Stone - Nos
Provision for Hecta Metre Stone - Nos
Provision for Cautionary Sign board charges (60cm equilateral triangle)
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.15 MB
28.pdf
Tender Documents • 1.47 MB
BOQ_788234.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid