| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.9 Cr+₹7.8 L (4.37%)Rejected-Finance | ₹1.9 Cr+₹7.8 L (4.37%) | L2 | Rejected-Finance Rejected |
Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
10 Jan 2025, 3:00 pmClosed
Additional Collector (Dev.)
4th Floor, DRDA, Collectorate, Erode
Erode District Improvements of the Road 2 Nos. in Package No TN 12-03 Perundurai Block under NABARD RIDF-XXX (2024-25).
2024_RDTN_514104_2
54591-2023-R B1.2 Dt. 17.12.2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Perundurai block
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.8 L
4th Floor, DRDA, Collectorate, Erode
6 Feb 2025
26 Dec 2024
10 Jan 2025
26 Dec 2024
10 Jan 2025
31 Dec 2024
31 Dec 2024
Amount
Strengthening the Road from Vijayamangalam- Thingalore road to Tiruppur perumanallur - Kunnathur - perundurai road ( via) Polanaickenpalayam, Ellapalayam Km 0/0-2/110
Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. In Area of Thorny Jungle Km.0/000-1/360
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 0m and lift of 2m including all labour charges and incidental charges such as shoring strutting providing coffer dams bailing out of water as per 20A Km.0/000-1/360
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3m and lead up to 1000m as per Technical specification
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. Km 0/000-1/360
Bituminous Concrete of 30 mm thick shall consist of Construction in a single couse of compacted crushed aggregates premixed with bituminous binder of 80/100 grade at the rate of 3.5 % by weight of total mix to serve as base / binder course in accordance with MORTH rev IV cl.504 specification and in confirmity with drawing.
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
KM Stone Reinforced cement concrete M15 grade kilometer stone\local stone of standard design as per IRC:8 fixing in position including painting and printing etc as per drawing and Technical Specication clause 1703
Hm stone(Precast)
Providing and fixing of cautionary, mandatory and informatory sign board
60 Cm Equilateral triangle (Cautionary) sign Board
Reflector ( Road Stud with lens reflector)
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of rumble strips covered with premix bituminous carpet 15.20mm high at centre 250mm wide placed at 1m centre to center at approved locations to control speed marked with white strips of road marking point
Construction of Single Row Pipe Culvert (0.70m did RCC Hume Pipe) at Ch.1450m
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mildsteel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre andsupported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and fixing of RCC Hume pipes (NP3 Class) with suitableCollars including cost of Pipes and Labour charges etc., complete
Towards laying of RCC hume Pipes (NP3 Class) with suitable Colars including cost of Pipes and Labour charges etc., complete
Name Board
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Strengthening the Road from Km 1/6 of Thingalore-Vellankoil road to join the Km 0/8 of Thingalore-Vellankoil road (Via) Koothambi Km 0/0-2/075
Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. Km 0/0-2/075
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 0m and lift of 2m including all labour charges and incidental charges such as shoring strutting providing coffer dams bailing out of water as per 20A Km 0/0-2/075
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3m and lead up to 1000m as per Technical specification
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. Km 0/000-1/360
Bituminous Concrete of 30 mm thick shall consist of Construction in a single couse of compacted crushed aggregates premixed with bituminous binder of 80/100 grade at the rate of 3.5 % by weight of total mix to serve as base / binder course in accordance with MORTH rev IV cl.504 specification and in confirmity with drawing.
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
KM Stone Reinforced cement concrete M15 grade kilometer stone\local stone of standard design as per IRC:8 fixing in position including painting and printing etc as per drawing and Technical Specication clause 1703
Hm stone(Precast)
Providing and fixing of cautionary, mandatory and informatory sign board
60 Cm Equilateral triangle (Cautionary) sign Board
Reflector ( Road Stud with lens reflector)
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of rumble strips covered with premix bituminous carpet 15.20mm high at centre 250mm wide placed at 1m centre to center at approved locations to control speed marked with white strips of road marking point
Name Board
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction & Maintenance) above this row in column "BB" for all works in this package}
vinayagaconstructions (BID ID -1225549)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .