Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical accept |
| 2 | Accepted-Technical | Accepted-Technical accept |
| 3 | Accepted-Technical | Accepted-Technical accept |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹33.6 L
EMD Value
₹67,200
Closing Date
7 Jul 2026, 12:00 pmClosed
EE MDGC MUZAFFARNAGAR
Muzaffarnagar Division Ganga Canal Muzaffarnagar
Janpad muzaffarnagar me muzaffarnagar khand ganga nahar muzaffarnagar ke esthrantargatr Rajwaha Bastam ke km 13.630 par VRB ke Punhnirman ka karya Lot No 2
2026_UPIDC_1164941_2
TN-01/EE/2026-27
Open Tender
Civil Works
Piece-work
45 days
as per tender notice
as per tender notice
2 documents required · 2 mandatory
₹854
₹67,200
5 Sept 2026
1 Jul 2026
7 Jul 2026
1 Jul 2026
7 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of R.C.C. work with its proper stacking including all cost of labour, T&P etc. as per direction of Engineer incharge. | - | Cum | - | - |
| 2 | Dismantling of Brick work with its proper stacking including all cost of labour, T&P etc. as per direction of Engineer incharge. | - | Cum | - | - |
| 3 | Laying Dismantaled material i/c all Labour T&P, etc. Complete | 1 | Cum | - | - |
| 4 | Earth work in excavation in foundation in all types of soil including lift upto 1.5M and lead upto 30M and including back filling, watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation tranches. | - | Cum | - | - |
| 5 | Centering and shuttering for C.C work in toe wall bed C.C etc i/c cost of all material, T&P etc complete. | - | Sqm | - | - |
| 6 | Centering and shuttering of R.C.C work as Raft, Slab, Abutment, Pier and wings etc. including cost of all material, T&P etc. complete. | 1 | Sqm | - | - |
| 7 | C.C. M-10 (1:3:6) with Cement & Stone grit 4 mm to 20 mm size For below Approch slab etc. Including cost of all Materials, Labour, T&P. etc. Complete. | - | Cum | - | - |
| 8 | C.C. M-15 (1:2:4) with Cement & Stone grit 4 mm to 20 mm size For below bed, floor, sleepers lining etc. Including cost of all Materials, Labour, T&P. etc. Complete. | - | Cum | - | - |
| 9 | R.C.C. (M-25 grade) 1:1:2 In main slab, approach slab, crash barrier etc. Including cost of all materials, labour and T&P etc. all completion of work. | - | Cum | - | - |
| 10 | C.C. (M-20 grade) 1:1.5:3 In toe wall, wing wall, transition etc. Including cost of all materials, labour and T&P etc. all completion of work. | 1 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.63 MB
Tendernotice_2.pdf
PDF • 2.17 MB
BOQ_2184653.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .