| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.6 LAccepted-AOC CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | Rejected-Technical CAMP VILLAGE DEVGAI POST KUDRI SHADOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | - | Rejected-Technical Rejected as L-2 |
Tender Value
₹3.9 L
EMD Value
₹4,900
Closing Date
21 Mar 2023, 5:00 pmClosed
Staff Officer (Mining)
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Construction of 04 nos retaining wall and cleaning of sump at V seam of Damini UG Mine of Sohagpur Area
2023_SECL_273775_1
SECL/SGP/ET/2223/607dt04/03/23
Open Tender
Civil Works - Others
Item Rate
60 days
Damini UG Mine
As per NIT
8 documents required · 8 mandatory
₹4,900
21 Apr 2023
6 Mar 2023
24 Mar 2023
6 Mar 2023
21 Mar 2023
7 Mar 2023
6 Mar 2023 - 13 Mar 2023
Amount
Item Description/ Heading Part (A) labour Cost
Groov cutting in soft stone by shisel and hammer in floor In floor – 4X(5.50m.x0.30m.X0.30 m.) = 1.98m3
Groove cutting in coal/shale - In side – 4X2 1.50m.x0.30m.X0.50 m.)= 1.808m3
Reinforced cement concrete (1:2:4) in Wall /roof ceiling of air crossing/stopping (any thickness)in u/g(Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials). Wall – 4X 5.50m. X 1.80.m X 0.30m.= 11.88m3
Centring, shuttering, finishing and reinforce- Ment including cutting, bending, placing in position and binding and strutting, propping etc complete. 4X 2.00m. X 4.50m. X 1.50m.= 54.00 m2
Loading of all kind building materials in to tub at Inc. mouth- a) Stone chips - 10.57 m³ b) Sand - 5.29 m³ c) Cement - 2.64 m³ d) Steel rod(12) -0.06 m³ TOTAL = 18.56 m³
Transportation of all kind of building material from surface to u/g through haulages with tram ing and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface
Unloading of all kind building materials in to tub at destination
Lead for transportation/carriage of all kinds building materials by manually in u/g. Upto 75m
Cleaning/ removal of malma/ muck from UG sump and stacking within 50m distance (A) Main Dip Sump Burhar V Seam Along 35L between 0D to 1DE=22 m Along 36L between 0D to 1DE=23 m Along 37L between 0D to 1DE=17 m 1DE between 34L to 35L=10.50M 0D between 35L to 36L=18.00M 1DE between 36L to 37L=17.00M 2DE between 35L to 36L=14.00M Volume of silt 121.50X4.20X0.80+0.60+0.40+0.20/4=255.15M3
Part-B Material Cost supply and stacking of building materials Cement
Stone chips(20mm)
Steel rod( 12mm)
Total impact of GST for the purpose of CTC
RAVI KUMAR JAISWAL
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .