Loading…
Loading…
Tender Value
₹8.0 L
EMD Value
₹15,940
Closing Date
16 Sept 2026, 4:00 pmDue today
Executive Engineer PWD RandB Division R S Pura
Executive Engineer PWD RandB Division R S Pura
BOQ
2026_PWDJK_323052_2
Short e-NIT No. DRSP/77 of 2026-27 Dated 01-09-2026
Open Tender
Civil Works
Percentage
30 days
Bishnah
eNIT/SBD
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RandB Division R S Pura
₹15,940
R S Pura
1 Sept 2026
1 Sept 2026
17 Sept 2026
1 Sept 2026
16 Sept 2026
1 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 4.57 | cum | 2,516.85 | ₹11,502 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil : | 21.6 | cum | 256.85 | ₹5,547.96 |
| 3 | Providing and laying in position cement concrete 1 cement :5 fine sand :10 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | - | cum | 4,826.5 | - |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | - | cum | 5,733.6 | - |
| 5 | Providing and laying in position 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level | - | cum | 7,788.4 | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | - | kg | 123.2 | - |
| 7 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.10.25.1 In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete.10.25.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | - | kg | 181.6 | - |
| 8.1 | Centring and shuttering including strutting, propping etc and removal of the formwork Foundations, footings, bases of columns etc. for mass concrete. | - | sqm | 286.35 | - |
| 8.2 | Centring and shuttering including strutting, propping etc and removal of the formwork Suspended floors, roofs, landings, balconies and access platforms. | - | sqm | 718.2 | - |
| 8.3 | Centring and shuttering including strutting, propping etc and removal of the formwork Edges of slabs and breaks in floors and walls, Under 20 cm wide | 21.8 | mtr | 262.2 | ₹5,715.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_1086166.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .