| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | -30.26% | ₹2.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.4 L+₹36,472.61 (17.9%)Admitted-Fee/PreQual/Technical/Finance | -17.79% | ₹2.4 L+₹36,472.61 (17.9%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.5 L+₹44,603.64 (21.9%)Admitted-Fee/PreQual/Technical/Finance | -15.01% | ₹2.5 L+₹44,603.64 (21.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.6 L+₹58,291.83 (28.6%)Admitted-Fee/PreQual/Technical/Finance | -10.33% | ₹2.6 L+₹58,291.83 (28.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹2.8 L+₹79,730.83 (39.1%)Admitted-Fee/PreQual/Technical/Finance | -3.00% | ₹2.8 L+₹79,730.83 (39.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,840
Closing Date
20 Aug 2026, 4:00 pmClosed
xen,IFCD Sumbal
irrigation colony sumbal
Construction of Culvert NHO Feroz Ah Wani at Kathpora
2026_IFC_318725_2
ENITNO.01OF2026
Open Tender
Civil Works
Percentage
30 days
Hajin
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Chief Engineer,IFCD
₹5,840
27 Aug 2026
31 Jul 2026
21 Aug 2026
31 Jul 2026
20 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | Cum | 187.3 | - |
| 2 | Providing and laying in position dry stone soling in horizontal on level incl cost of stones | - | Cum | 937.9 | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 7,788.4 | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level
Mild steel and medium tensile steel bars | - | kg | 115.35 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work (Complete)
Foundations, footings, bases of columns etc. for mass concrete. | - | SQM | 286.35 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work (Complete)
Suspended floors, roofs, landings, balconies and access platforms | 1 | SQM | 718.2 | ₹717.48 |
| 7 | Carraige of material from source upto site of work by mechanical transport, including loading,unloading and stacking, etc
(a) 20mm stone aggregate from an average lead of 12 Km | - | Cum | 305.22 | - |
| 7.1 | (b) Stones for an average lead of 12 km | - | Cum | 359.11 | - |
| 7.2 | (c) Sand for an average lead of 4 KM's | 1 | Cum | 183.58 | ₹183.4 |
stage.html
html • 0.03 MB
finance_1052073.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_1052073.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .