Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.4 LAdmitted-Finance 4TH FLOOR VOLTAS HOUSE A BLOCK DR BABASAHEB AMBEDKAR ROAD CHINCHPOKLI MUMBAI MAHARASHTRA 400033 | MUMBAI | MAHARASHTRA | 400033 | ₹73.4 L | L1 | Admitted-Finance |
| 2 | L2₹82.6 L+₹9.2 L (12.6%)Admitted-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹82.6 L+₹9.2 L (12.6%) | L2 | Admitted-Finance |
| 3 | L3₹97.4 L+₹24.0 L (32.7%)Admitted-Finance | ₹97.4 L+₹24.0 L (32.7%) | L3 | Admitted-Finance |
| 4 | L4₹1.1 Cr+₹37.7 L (51.4%)Admitted-Finance 90 MYLAPORE CHENNAI TAMIL NADU 600004 | CHENNAI | TAMIL NADU | 600004 | ₹1.1 Cr+₹37.7 L (51.4%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical A 99 SECTOR 4 AIROLI NAVI MUMBAI 400708 | NAVI MUMBAI | THANE | MAHARASHTRA | 400708 | - | - | Rejected-Technical Not Submitted any further documents when sought for submission of deficient documents through portal |
| Sl No | Description | Qty | Unit | VOLTAS LIMITED L1 | GENIUS AIRCON PRIVATE LIMITED L3 | GEMINI COOLING SYSTEMS PROJECTS PRIVATE LIMITED L4 | Bluestar Limited L2 |
|---|---|---|---|---|---|---|---|
| 1.00SH-I: CMC (COMPREHENSIVE MAINTENANCE CONTRACT) | |||||||
| 1.01Comprehensive Maintenance contract of HVAC equipment installed at Integrated Air cargo Complex AC plant (Both High Side & Low Side ) complete with 4 Nos of 300 TR Dunham Bush make screw chillers (Air Cooled type), 4Nos of chilled water pump, 11 Nos of 50 TR/60 TR AHU's)i/c motors, soft starter /VFD's blowers, cooling coils,canvass, Air filters, Top/side Bottom /Door Panel ),Electric power supply panels, starter panels and control panels of AC system, piping & valves with and without insulation, strainer, Actuators, VCD's Fire Dampers and its connected accessories complete as per attached list of installation etc as required as per specifications with all related / associated equipments works at located as per enclosed inventory of "Annexure A1" covering the scope of activities given on special condition of contract and technical specification, attending faults and free supply, replacement of defective components of same rating and make, ensuring serviceability /satisfactory working conditions of the system , i/c attending preventive & break down maintenance complete etc as required & as specified. Note1: (i) 04 nos of Chilled water pump maintenance commence from 01.06.2022 (ii) 03 nos of AHU will commence from September 2022 only | |||||||
| 1.02 | 1st Year from 01.10.2021 to 30.09.2022 | 12 | Month | 1,10,250 ₹13,23,000 Lowest | 1,77,890 ₹21,34,680 | 1,80,000 ₹21,60,000 | 1,12,535 ₹13,50,420 |
| 1.03 | 2nd Year from 01.10.2022 to 30.09.2023 | 12 | Month | 1,13,557.5 ₹13,62,690 Lowest | 1,77,890 ₹21,34,680 | 1,90,000 ₹22,80,000 | 1,17,036 ₹14,04,432 |
| 1.04 | 3rd Year from 01.10.2023 to 30.09.2024 | 12 | Month | 1,16,964.23 ₹14,03,570.8 Lowest | 1,77,890 ₹21,34,680 | 2,00,000 ₹24,00,000 | 1,21,718 ₹14,60,616 |
| 1.05 | 4th Year from 01.10.2024 to 30.09.2025 | 12 | Month | 1,20,473.15 ₹14,45,677.8 Lowest | 1,77,890 ₹21,34,680 | 2,10,000 ₹25,20,000 | 1,26,586 ₹15,19,032 |
| 2.00Maintenance of Cold storage system at NS-04 Import side as mentioned in inventory list at Annexure-A1 including monthly /quarterly/half year /yearly preventive maintenance checks, refrigeration top up and operation complete as required | |||||||
| 2.01 | 1st Year from 01.10.2021 to 30.09.2022 | 12 | Month | 26,100 ₹3,13,200 | 20,000 ₹2,40,000 Lowest | 20,000 ₹2,40,000 Lowest | 41,917 ₹5,03,004 |
| 2.02 | 2nd Year from 01.10.2022 to 30.09.2023 | 12 | Month | 26,883 ₹3,22,596 | 20,000 ₹2,40,000 Lowest | 25,000 ₹3,00,000 | 43,593 ₹5,23,116 |
| 2.03 | 3rd Year from 01.10.2023 to 30.09.2024 | 12 | Month | 27,689.49 ₹3,32,273.9 | 20,000 ₹2,40,000 Lowest | 30,000 ₹3,60,000 | 45,337 ₹5,44,044 |
Tender Value
₹1.3 Cr
Closing Date
28 Aug 2021, 4:00 pmClosed
Regional Manager
AAI CARGO LOGISTICS AND ALLIED SERVICES AND COMPANY LIMITED Integrated Air Cargo Complex Meenambakkam Chennai Airport, Chennai 600 016
Comprehensive Maintenance Contract of HVAC and NS-04 Cold Storage at Integrated Air Cargo Complex, Meenambakkam, Chennai Airport, Chennai (for 04 years)
2021_AAICL_84104_1
AAICLAS/ELECT-27/HVAC and COLD STORAGE/2021-22
Open Tender
Electrical Works
Works
1460 days
Integrated Air Cargo Complex Meenambakkam
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
AAICLAS
Exempted
7 Sept 2021
7 Aug 2021
2 Sept 2021
7 Aug 2021
28 Aug 2021
16 Aug 2021
7 Aug 2021 - 14 Aug 2021
Amount
SH-I: CMC (COMPREHENSIVE MAINTENANCE CONTRACT)
Comprehensive Maintenance contract of HVAC equipment installed at Integrated Air cargo Complex AC plant (Both High Side & Low Side ) complete with 4 Nos of 300 TR Dunham Bush make screw chillers (Air Cooled type), 4Nos of chilled water pump, 11 Nos of 50 TR/60 TR AHU's)i/c motors, soft starter /VFD's blowers, cooling coils,canvass, Air filters, Top/side Bottom /Door Panel ),Electric power supply panels, starter panels and control panels of AC system, piping & valves with and without insulation, strainer, Actuators, VCD's Fire Dampers and its connected accessories complete as per attached list of installation etc as required as per specifications with all related / associated equipments works at located as per enclosed inventory of "Annexure A1" covering the scope of activities given on special condition of contract and technical specification, attending faults and free supply, replacement of defective components of same rating and make, ensuring serviceability /satisfactory working conditions of the system , i/c attending preventive & break down maintenance complete etc as required & as specified. Note1: (i) 04 nos of Chilled water pump maintenance commence from 01.06.2022 (ii) 03 nos of AHU will commence from September 2022 only
1st Year from 01.10.2021 to 30.09.2022
2nd Year from 01.10.2022 to 30.09.2023
3rd Year from 01.10.2023 to 30.09.2024
4th Year from 01.10.2024 to 30.09.2025
Maintenance of Cold storage system at NS-04 Import side as mentioned in inventory list at Annexure-A1 including monthly /quarterly/half year /yearly preventive maintenance checks, refrigeration top up and operation complete as required
1st Year from 01.10.2021 to 30.09.2022
2nd Year from 01.10.2022 to 30.09.2023
3rd Year from 01.10.2023 to 30.09.2024
4th Year from 01.10.2024 to 30.09.2025
SH-II: DUCTING
Supply, installation, balancing and commissioning of fabricated at site GSS sheet metal rectangular/round ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as per approved drawings and specifications of following sheet thickness complete as required.
Thickness 0.80 mm sheet
Thickness 0.63 mm sheet
Supplying and fixing of following thickness duly laminated aluminum foil of mat finish closed cell Nitrile rubber (Class "O") insulation on existing duct after applying suitable adhesive for Nitrile rubber. The joints shall be sealed with 50 mm wide and 3 mm thick self adhesive nitrile rubber tape insulation complete as per specifications and as required.
Bluestar Limited
GENIUS AIRCON PRIVATE LIMITED
GEMINI COOLING SYSTEMS PROJECTS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.15 MB
FULLNITHVAC.pdf
Tender Documents • 6.14 MB
BOQ_91081.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .