Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹29,300
Closing Date
4 Mar 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC-I/CHENNAI
A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2021_EB_198761_1
PT-019/20-21 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Chennai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹29,300
Yes
5 Mar 2021
25 Feb 2021
5 Mar 2021
26 Feb 2021
4 Mar 2021
26 Feb 2021
90 days
Amount
Labour Charges for conducting check survey, pegging, marking of pits for tower foundation as per the apporved profile including chaining and carring theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site.
Sinking of well in Hard stiff clay light black cotton soil, hard red earth, shales, murram, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soild including bailing or pumping charges if necessary etc., complete all incidental charges using special tools and plants such as air compressor, helmet etc., complete and as directed by the department engineer at site. First depth 0 - 2 m
Sinking of well in Hard stiff clay light black cotton soil, hard red earth, shales, murram, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soild including bailing or pumping charges if necessary etc., complete all incidental charges using special tools and plants such as air compressor, helmet etc., complete and as directed by the department engineer at site. Second depth 2 - 4 m
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Soft Disintegrated Rock not requiring blasting including cost of all materials lead lift etc complete
Manufacturing and supplying of RCC well rings of inner dia 1.80 m, 75 mm thick, 300 mm depth including all cost of materials, transport, labour for providing correct possision and alignment, lead, lift, etc.,complete as directed by the department engineer at site.
Manufacturing and supplying of RCC well rings of inner dia 2.40 m, 75 mm thick, 300 mm depth including all cost of materials, transport, labour for providing correct possision and alignment, lead, lift, etc.,complete as directed by the department engineer at site.
Labour charges for assembling of template in correct position and aligenment for various equipment plinth and grouting the foundation bolts including cost of all materials transport, labour, lead, lift etc., complete as per standard specification and as directed by the dept. Engineer at site. (The template will be make own arrangement by the contractor)
Plain Cement Concrete 1:3:6 using 40 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site.
Providing and laying P:C:C 1:2:4 using 20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying P.C.C 1:2:4 using 20mm HBG stone with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
R.C.C. 1:1.5:3 using 12- 20mm metal with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site.
Supplying and providing Pipe type earthing with 40 mm dia GI pipe (medium class) as per specification and as direct by the site engineer including cost of all meterials, cutting of earth wire to the required length and connecting to the tower leg and earth pipe with 2 Nos. bolts, nuts, with washers, drilling charges etc., complete as per specification and as directed by the department engineer at site.
Labour charges for removal of surplus earth from the site and putting into low lying area inside the yard upto 2 Kms away from the site including the cost of all labour, transport, lead, lift etc., complete as directed by the department engineer at site.
Labour charge for transporting and erection of tower parts including sorting out of tower parts at stores and site, rectification in tower parts if any, cost of T&P, labour, transport from stores, lead, lift, etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for welding of bolts and nuts at three places in towers from GL to X-arm bottom level 1 cm each diagonally opposite each other after tightening and puching to avoid theft of tower parts with one coat of painting zinc coat in the welded portion including cost of welding rod, hire charge for generators, painting the bolts and nuts transporting labour, lead, lift etc complete as per instrution incharge of department engineer at site
Arranging and attending shutdowns work on HT / LT, EHT lines, dismandling and restringing of HT / LT / EHT lines after completion of line stringing work including charges for T&P, transport, lead, lift, etc., complete as directed by the department engineer at site (one set means all the conductor and earth wire in the corresponding one no HT / LT / EHT line)
Plastering in cement mortar 1:3, 12 mm thick for ceilling and sunshade including cost of all material scaffolding, curing, labour with all lifts etc., complete as directed by dept.Engineer at site
Labour charges for painting tower legs using best qulity anticorroessive black paint two coats 1 m above coping including cost of all materials, labour, transport, lead, lift etc., complete as directed by the department engineer at site.
Labour charges for Transporting and hoisting of 08 units Anti fog double tension insulators 120 KN with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for Transporting and hoisting of 08 units Anti fog single tension insulators 120 KN with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for Transporting and hoisting of 7 units 90 KN Antifog suspension tension insulators with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for providing special trusstles for major road crossing including the cost of all materials, T&P, transport, labour, lead, lift etc., complete as per standard specification and as directed by the department engineer at site.
Labour charges for transporting and paying out of 3 Nos. of Panther conductor with fittings including sorting out of conductor, providing trussels of 30.0m intervals for paying out of conductors, according to drum schedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete.
labour charges for paying out and stringing of 1 no. GI 7/3.55 mm SWG steel earth wire with fittings cost of T&P lead and lift, etc., complete as directed by the department engineer at site.
labour charges for stringing of 3 Nos Panther conductor rough sagging tensioning to correct sag and fixing to towers as per specification with fittings cost of T&P lead and lift, etc., complete as directed by the department engineer at site.
Labour charges for rough sagging, tensioning of 1 No. GI earth wire and tensioning, with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. For continuous span
Labour charges for releasing, marking cutting and restringing of 3 Nos. Panther Conductor including roguh sagging, tensioning, clipping, parviding vibration dampers, jumpering, cost of transport, labour, T&P, lead, lift etc., complete as directed by the department engineer at site.
Labour charges for releasing, marking cutting and restringing of 1 No. GI Earth wire including roguh sagging, tensioning, clipping, parviding vibration dampers, jumpering, cost of transport, labour, T&P, lead, lift etc., complete as directed by the department engineer at site. For continuous span
Labour charges for Stringing of 3 nos Panther Conductor with fittings including fixing dampers and jumpers, cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for Stringing of 1 No. GI earth wire with fittings including fixing dampers and jumpers, cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for dismantling the existing 8 unit 120 KN insulator with fittings and devoluted to stores including cost of loading, unloading, T&P, labour, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for dismantling the existing 7 unit 90 KN Suspension insulator with fittings and devoluted to stores including cost of loading, unloading, T&P, labour, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition
Labour charges for dismantling of 3 nos. panther conductor with fittings and devoluted to stores including cost of loading, unloading, T&P, labour, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition (Continuous Span)
Labour charges for dismantling and lowering the existing GI earth wire with fittings and devoluted to stores including cost of loading, unloading, T&P, labour, lead, lift etc., complete as directed by the department engineer at site. Continuous Span
SCRAP:- Labour charges for dismantling of existing 110 KV SC tower and owing the same as is where is condition including the cost of transport, lead, lift etc., complete as directed by the department engineer at site. Under LC condition. (The rate should not be quoted not less than Rs. 25,000/- per MT)
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
Dhinesh kumaar Enterprises
M.RAJADURAI CONTRACTOR
S S AND CO
K DHINAKARAN
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .