Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | L1 | Accepted-AOC accept | |
| 2 | L2₹7.4 L+₹5,079.85 (0.69%)Rejected-Finance | L2 | Rejected-Finance reject |
| Sl No | Description | Qty | Unit | G BALASUNDAR L2 | N. KARUPPAIAH L1 |
|---|---|---|---|---|---|
| 1.10Construction of Bus shelter at Manakollai in Ponnanviduthi Panchayat | |||||
| 1.20 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 13.03 | Cum | 263.78 ₹3,437.05 Lowest | 263.78 ₹3,437.05 Lowest |
| 1.30 | Supplying and filling of conveyed earth with a lead of 5Km for basement filling including all labour charges for filling etc complete | 15.86 | Cum | 250 ₹3,965 | 233.78 ₹3,707.75 Lowest |
| 1.40 | Collection and supply of Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 3.77 | Cum | 2,059.93 ₹7,765.94 Lowest | 2,059.93 ₹7,765.94 Lowest |
| 1.50 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to work site and all labour charges for mixing,laying and curing etc.complete. | 4.93 | Cum | 5,838.7 ₹28,784.79 Lowest | 5,838.7 ₹28,784.79 Lowest |
| 1.60 | R.C.C. 1:11/2:3 mix using 20mm ISS HBG metal including cost and conveyance of materials to work site and all labour charges for mixing,laying and curing etc.complete. | 9.91 | Cum | 9,583.57 ₹94,973.18 Lowest | 9,583.57 ₹94,973.18 Lowest |
| 1.70 | Brick work in cm1:5 mix using country bricks of size 8 3/4" x 4 1/4" x 2 3/4" including cost and conveyance of materials to work site and all labour charges etc.complete. | 13.78 | Cum | 6,199.79 ₹85,433.11 Lowest | 6,199.79 ₹85,433.11 Lowest |
| 1.80 | Supplying and fabrication of steel including cost of steel and binding wire to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works | 0.85 | Mt | 91,944.7 ₹78,153 Lowest | 91,944.7 ₹78,153 Lowest |
| 1.90 | Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of materials to work site and all labour charges etc.complete. | 90.73 | sqm | 1,095 ₹99,349.35 Lowest | 1,095 ₹99,349.35 Lowest |
| 2.00 | Special ceiling plastering with cement mortor 1:3 mix to 10mm thick including cost and conveyance of materials to work site and all labour charges etc.complete. | 73.88 | sqm | 328.51 ₹24,270.32 Lowest | 328.51 ₹24,270.32 Lowest |
Tender Value
₹7.5 L
EMD Value
₹8,000
Closing Date
9 Jan 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICE (B.PT)
panchayat union office karambakkudi
Construction of Bus shelter at Manakollai in Ponnanviduthi Panchayat
2025_RDTN_637395_1
a7/1331/2025-2
Open Tender
Civil Works
Works
panchayat union office karambakkudi
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹8,000
14 Jan 2026
30 Dec 2025
9 Jan 2026
30 Dec 2025
9 Jan 2026
30 Dec 2025
Amount
Construction of Bus shelter at Manakollai in Ponnanviduthi Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supplying and filling of conveyed earth with a lead of 5Km for basement filling including all labour charges for filling etc complete
Collection and supply of Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to work site and all labour charges for mixing,laying and curing etc.complete.
R.C.C. 1:11/2:3 mix using 20mm ISS HBG metal including cost and conveyance of materials to work site and all labour charges for mixing,laying and curing etc.complete.
Brick work in cm1:5 mix using country bricks of size 8 3/4" x 4 1/4" x 2 3/4" including cost and conveyance of materials to work site and all labour charges etc.complete.
Supplying and fabrication of steel including cost of steel and binding wire to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of materials to work site and all labour charges etc.complete.
Special ceiling plastering with cement mortor 1:3 mix to 10mm thick including cost and conveyance of materials to work site and all labour charges etc.complete.
Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of materials to work site and all labour charges etc.complete.
Weathering Course Concrete to 80 mm thickness (average) using 20mm size Brick jelly with slacked lime in the proportion 32:12:50 (No sand to be used) including cost and conveyance of materials to work site and all labour charges etc.complete.
Finishing top of roof with one layer of Pressed Tiles of size 20 cm x 20cm x 20mm embedded in Cement Mortor 1:3 mix mixed with Water Proofing compound and pointed with same mixed mortor to full depth of tiles including cost and conveyance of materials to work site and all labour charges etc.complete.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Dadooing of walls with Colour glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 - etc., complete.
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
G BALASUNDAR (BID ID -1555690)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
td2.pdf
Tender Documents • 0.21 MB
BOQ_762851.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .