Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-AOC 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹31.6 L Quoted ₹32.0 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹36.1 LRejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹36.1 L | L2 | Rejected-Finance Being L2 |
| 3 | L3₹38.3 LRejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹38.3 L | L3 | Rejected-Finance Being L3 |
| 4 | L4₹38.5 LRejected-Finance C O GIVEN GOD NONGTDAU ARBUTHNOT ROAD NONGRIMMAW LAITUMKHRAH SHILLONG PIN 793011 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793011 | ₹38.5 L | L4 | Rejected-Finance Being L4 |
| 5 | L5₹38.7 LRejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG 793009 MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹38.7 L | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | M/S BISWA CONSTRUCTION L3 | M/S R.D. Electricals L7 | M/S DIL SINGH BISWA AND CO L6 | M/S DEEDAR ENTERPRISE L1 | S K ENTERPRISE L5 | M/s Gupta Construction L8 | M/s J. C. CONSTRUCTION L4 | MAHINDER ELECTRICALS L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Disconnecting all electric / water supply connection from the monoblock / cenrtifugal pump set electric driven AC 3 phase, 415 Volts, transporting to workshop dismantling, removing the burnt out windings, cleaning the starter slots and rewinding with super enamelled copper wire of suitable gauge, insulating, proper heat varnishing, re-transportation and re-installation at same position including commissioning and testing complete for the following capacity :- | |||||||||||
| 1.01 | Motor of capacity 2HP/3HP. | 3 | Each Job | 6,900 ₹20,700 | 7,200 ₹21,600 | 7,169 ₹21,507 | 6,500 ₹19,500 | 7,150 ₹21,450 | 7,325 ₹21,975 | 7,250 ₹21,750 | 7,285 ₹21,855 |
| 1.02 | Motor of capacity 5/7.5 HP | 3 | Each Job | 7,900 ₹23,700 | 8,200 ₹24,600 | 8,245 ₹24,735 | 7,200 ₹21,600 | 8,150 ₹24,450 | 8,500 ₹25,500 | 8,300 ₹24,900 | 8,265 ₹24,795 |
| 1.03 | Motor of capacity 10 HP | 1 | Each Job | 13,900 ₹13,900 | 14,500 ₹14,500 | 14,250 ₹14,250 | 12,500 ₹12,500 | 14,450 ₹14,450 | 14,546 ₹14,546 | 14,500 ₹14,500 | 16,520 ₹16,520 |
| 1.04 | Motor of capacity 15 HP | 2 | Each Job | 22,900 ₹45,800 | 22,450 ₹44,900 | 23,150 ₹46,300 | 21,850 ₹43,700 | 22,400 ₹44,800 | 23,150 ₹46,300 | 24,500 ₹49,000 | 21,950 ₹43,900 |
| 1.05 | Motor of capacity 60/75 HP | 2 | Each Job | 71,900 ₹1.4 L | 72,500 ₹1.4 L | 67,000 ₹1.3 L | 85,000 ₹1.7 L | 72,550 ₹1.5 L | 68,950 ₹1.4 L | 68,000 ₹1.4 L | 69,850 ₹1.4 L |
| 1.06 | Motor of capacity 90/100 HP | 3 | Each Job | 1,23,900 ₹3.7 L | 1,24,500 ₹3.7 L | 1,32,500 ₹4.0 L | 1,15,000 ₹3.5 L | 1,23,650 ₹3.7 L | 1,29,598 ₹3.9 L | 1,24,500 ₹3.7 L | 1,24,850 ₹3.7 L |
| 2.00Supply asnd fix as in replacement bearing for AC 3 phase 415 Volts induction motor / monoblock pump set of the following capacities, as directed by the Engineer-in-Charge :- Make : Make shall be provided as per existing one | |||||||||||
| 2.01 | Ball Bearing for motor of capacity 2HP/3HP. | 3 | Each Pair | 950 ₹2,850 | 1,000 ₹3,000 | 1,050 ₹3,150 | 850 ₹2,550 | 980 ₹2,940 | 1,025 ₹3,075 | 1,100 ₹3,300 | 1,120 ₹3,360 |
| 2.02 | Ball bearing for motor of capacity 5/7.5 HP | 3 | Each Pair | 1,200 ₹3,600 | 1,250 ₹3,750 | 1,450 ₹4,350 | 950 ₹2,850 | 1,230 ₹3,690 | 1,155 ₹3,465 | 1,450 ₹4,350 | 1,345 ₹4,035 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
6 May 2026, 6:00 pmClosed
GE i AF SHILLONG
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
REPAIR OR REPLACEMENT OF CENTRIFUGAL PUMP AND MOTORS, FOUNTAIN PUMPS, SUBMERSIBLE PUMPS, MOTOR STARTER PANEL AND OTHER ALLIED WORKS AT HQ EAC (U) AF UNDER GE (I) (AF) SHILLONG
2026_MES_760422_1
8040/26/E8
Open Tender
Civil Works - Water Works
180 days
GE i AF SHILLONG
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE I AF SHILLONG
₹60,000
Yes
13 Jun 2026
15 Apr 2026
8 May 2026
15 Apr 2026
6 May 2026
29 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Disconnecting all electric / water supply connection from the monoblock / cenrtifugal pump set electric driven AC 3 phase, 415 Volts, transporting to workshop dismantling, removing the burnt out windings, cleaning the starter slots and rewinding with super enamelled copper wire of suitable gauge, insulating, proper heat varnishing, re-transportation and re-installation at same position including commissioning and testing complete for the following capacity :- | - | - | - | - | |
Motor of capacity 2HP/3HP. | - | Each Job | - | - | |
Motor of capacity 5/7.5 HP | - | Each Job | - | - | |
Motor of capacity 10 HP | - | Each Job | - | - | |
Motor of capacity 15 HP | - | Each Job | - | - | |
Motor of capacity 60/75 HP | - | Each Job | - | - | |
Motor of capacity 90/100 HP | - | Each Job | - | - | |
Supply asnd fix as in replacement bearing for AC 3 phase 415 Volts induction motor / monoblock pump set of the following capacities, as directed by the Engineer-in-Charge :-
Make : Make shall be provided as per existing one | - | - | - | - | |
Ball Bearing for motor of capacity 2HP/3HP. | - | Each Pair | - | - | |
Ball bearing for motor of capacity 5/7.5 HP | - | Each Pair | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tender8040.pdf
Tender Documents • 0.73 MB
BOQ_851763.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid