Tender Value
₹12.2 L
EMD Value
₹25,000
Closing Date
3 Aug 2026, 5:00 pm
EE ECD(D) PRAYAGRAJ
Office of Executive Engineer, Electricity Civil Division (D), 57 GEORGE TOWN PRAYAGRAJ-221002
Construction of boundary wall at 33/11 kv Substation-Kaudihar, District-Prayagraj.
2026_PVVNV_1169535_1
65/2026-27/ECD(D)/PRAYAGRAJ.
Open Tender
Civil Works
Percentage
60 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
EE ECD(D) PRAYAGRAJ
₹25,000
EE ECD(D) PRAYAGRAJ
15 Jul 2026
15 Jul 2026
4 Aug 2026
15 Jul 2026
3 Aug 2026
15 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 13.9 | Sqm | 13 | ₹180.7 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 114.32 | Cum | 191 | ₹21,835.12 |
| 3 | 1:4:8 (1 cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 12.07 | Cum | 5,007 | ₹60,434.49 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 98.48 | Kg | 79 | ₹7,779.92 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 2.78 | Sqm | 288 | ₹800.64 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.09 | Cum | 6,649 | ₹13,896.41 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 10.24 | Sqm | 707 | ₹7,239.68 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.09 | Cum | 5,242 | ₹10,955.78 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 98.48 | Kg | 79 | ₹7,779.92 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.5 | Cum | 8,457 | ₹4,228.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.30 MB
BOQ_2194663.xls
BOQ • 0.29 MB
TD2026-27.pdf
Tender Documents • 1.31 MB
Nit65Kaudihar.pdf
Additional Documents • 5.28 MB
Download all tender documents and submit your bid