Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹68.7 L
EMD Value
₹1.3 L
Closing Date
9 Jul 2025, 9:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Rural Development and Panchayat Raj Department
ANUPAMA
Improvements to Road from Ojarahalli to Jinagathimmanahalli Road in Malur Taluk Kolar District
RDPR/2025-26/RD/WORK_INDENT15170
RDPR/2025-26/RD/WORK_INDENT15170
Open
Roads
Two Tender Document System(Two Cover)
RDPR Division Office Kolar
10 documents required · 10 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Satisfactorily completed as prime contractor, at least similar nature of work value not less than Rs. 31.39 Lakhs (Contractor should clearly mention work Indent No. in work done certificate)
Executed in any one year the following minimum quantities of work EARTHWORK/EMBANKMENT- 1040 CUM, PCC/RCC : 423.58 CUM, GSB :360 CUM, WMM - 180.00 CUM, STEEL - 4.60 MT etc) (50% of peak rate of construction)
KPWD Licenced Contract Registration Certificate
GST Registration Certificate
Achieved in at least two financial years of the previous five financial years, a minimum financial turnover in all classes of Civil Engineering construction works only of Rs 62.77 Lakhs.UDIN Number should be compulsorily mentioned in Turnover Certificate From 2020-21 TO 2024-25.
Liquid assets and /or availability of credit facilities of no less than Rs. 18.84 Lakhs (estimated cash flow for 3 months of peak construction period)
₹1,720
₹1.3 L
2 Jul 2025
2 Jul 2025
11 Jul 2025
9 Jul 2025
Improvements to Road from Ojarahalli to Jinagathimmanahalli Road in Malur Taluk Kolar District
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
Construction of unlined surface drains of average crosssectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m...
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacte...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
Construction of Granular Sub-Base by Mix in Place Method by providing well graded Gravel, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavato...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), c...
Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary Kilometer Stone (precast) ----...
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200m Stone (precast) ---- with all lead and lift unload...
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- with all lead and lift unloading...
Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc, having rectangular shape of 1.20m x 0.90m size made...
Providing and erecting direction and place identification etroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick o...
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheetin vid...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Centering Charges for Headwalls 8% on finished rate of concrete per m3. For Culverts ---- with all lead and lift unloading loading labour fuel hire charges of machineries equipments including all inci...
Centering Charges for Pier walls 10% on finished rate of concrete per m3. For Culverts ---- with all lead and lift unloading loading labour fuel hire charges of machineries equipments including all in...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
Centering Charges for Slab 50% on finished rate of concrete per m3. For Culverts ---- with all lead and lift unloading loading labour fuel hire charges of machineries equipments including all incident...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
Centering Charges for Parapet walls 8% on finished rate of concrete per m3. For Culverts ---- with all lead and lift unloading loading labour fuel hire charges of machineries equipments including all ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and aying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 ...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. stone/bould...
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dr...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
LOT 8956.pdf
Others - RANDOMIZATION • 0.45 MB
15170 gen KW3 ROADS call 3 (1).doc
Tender Document • 2.32 MB
Notification 3 revised.pdf
Tender Document • 1.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .