| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹11.5 L+₹3,450.97 (0.30%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹11.5 L
EMD Value
₹11,770
Closing Date
11 Jul 2025, 3:00 pmClosed
Bdo(B.P),Assistant engineer,RegularManager
BDO Office,Nannilam
REPAIRS TO SCHOOL BUILDINGS,TOILET BUILDINGS AT ANDAKUDI,KOVILTHIRUMALAM HABITATION IN KOVILTHIRUMALAM PT
2025_RDTN_580526_1
4128/2025/A2 Dt 02/07/2025
Open Tender
Civil Works - Buildings
Item Rate
180 days
BDO Office, Nannilam
As per Tender documents
3 documents required · 3 mandatory
₹0
₹11,770
26 Jul 2025
10 Jul 2025
11 Jul 2025
10 Jul 2025
11 Jul 2025
10 Jul 2025
Amount
1)REPAIRS TO PUM SCHOOL SINGLE CLASS ROOM RCC BUILDING (S/F) AT KOVILTHIRUMALAM
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Dismantling the excisting damaged Plastering Surface Including cost and conveyance etc. complete.
Plastering with cement 1:3-10mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Provision for Kottastone charges
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Provision for Bala Painting charges
Painting two Coat old Iron Works including through scarpping clean removal of dirt etc., complete as per standard specification.
Painting two Coat with approved Black Oxide for Black board including through scarpping clean removal of dirt etc., complete as per standard specification
Painting two Coat New iron Works including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Provision for New Steel Window
Provision for Repair Steel Door charges
Provision for Repair Steel Window charges
Provision for Water Supply arrangements
2)REPAIRS TO PUM SCHOOL TWO CLASS ROOM RCC BUILDING (W/F) AT KOVILTHIRUMALAM
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Dismantling the excisting damaged Plastering Surface Including cost and conveyance etc. complete.
Pointing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Provision for Kottastone charges
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Plastering with cement 1:3-10mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Provision for Bala Painting charges
Painting two Coat old Iron Works including through scarpping clean removal of dirt etc., complete as per standard specification.
Painting two Coat with approved Black Oxide for Black board including through scarpping clean removal of dirt etc., complete as per standard specification
Painting two Coat New iron Works including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Provision for New Steel Window
Provision for Repair Steel Door charges
Provision for Repair Steel Window charges
Provision for Water Supply arrangements
3)REPAIRS TO PUE SCHOOL RCC BUILDING (E/F) AT ANDAKUDI
Dismantling the excisting damaged Plastering Surface Including cost and conveyance etc. complete.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Plastering with cement 1:3-10mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Provision for Bala Painting charges
Painting two Coat old WOOD Works including through scarpping clean removal of dirt etc., complete as per standard specification.
Painting two Coat with approved Black Oxide for Black board including through scarpping clean removal of dirt etc., complete as per standard specification
Painting two Coat New iron Works including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Provision for New Steel Window
Provision for Repair Steel Door charges
Provision for Repair Steel Window charges
Provision for Tube Light fittings
Provision for Water Supply arrangements
4)REPAIRS TO PUE SCHOOL COMMON TOILET BUILDING (E/F) AT ANDAKUDI
Dismantling the excisting damaged Plastering Surface Including cost and conveyance etc. complete.
Dismantling the excisting damaged Brick work Including cost and conveyance etc. complete.
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with cement 1:3-10mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment with standard specification
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Painting two Coat old Iron Works including through scarpping clean removal of dirt etc., complete as per standard specification.
Provision for New Steel Door
Painting two Coat New iron Works including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Provision for Indian water closet
Provision for Septic tank & Toilet cleaning charges
Provision for water supply arrangements charges
5)REPAIRS TO PUE SCHOOL GIRLS TOILET BUILDING (E/F) AT ANDAKUDI
Dismantling the excisting damaged Plastering Surface Including cost and conveyance etc. complete.
Plastering with cement 1:3-10mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Painting two Coat old Iron Works including through scarpping clean removal of dirt etc., complete as per standard specification.
Provision for water supply arrangements charges
Leach pit
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Provision for 0.90m Dia Rings
Provision for 0.90m Dia Coverslab
Provision for 110mm dia PVC Pipes
6)REPAIRS TO PUM SCHOOL HANDICAPED TOILET BUILDING (N/F) AT KOVILTHIRUMALAM
Dismantling the excisting damaged Plastering Surface Including cost and conveyance etc. complete.
Plastering with cement 1:3-10mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Painting two Coat old Iron Works including through scarpping clean removal of dirt etc., complete as per standard specification.
Provision for water supply arrangements charges
Leach pit
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Provision for 0.90m Dia Rings
Provision for 0.90m Dia Coverslab
Provision for 110mm dia PVC Pipes
7)REPAIRS TO PUE SCHOOL GIRLS TOILET BUILDING (W/F) AT KOVILTHIRUMALAM
Dismantling the excisting damaged Plastering Surface Including cost and conveyance etc. complete.
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment with standard specification
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Painting two Coat old Iron Works including through scarpping clean removal of dirt etc., complete as per standard specification.
Provision for IWC charges
WATER SUPPLY ARRANGEMENTS
Provision 32mm PVC Pipe including all Labour And all Material Charges etc.,Completed
Provision 32mm PVC Pipe Bend including all Labour And all Material Charges etc.,Completed
Provision 32mm PVC Pipe TEE including all Labour And all Material Charges etc.,Completed
Provision for 500Ltr HDPEwatertank etc., Completed.
8)REPAIRS TO PUM SCHOOL GIRLS URINAL BUILDING (W/F) AT KOVILTHIRUMALAM
Dismantling the excisting damaged Plastering Surface Including cost and conveyance etc. complete.
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment with standard specification
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Painting two Coat old Iron Works including through scarpping clean removal of dirt etc., complete as per standard specification.
Provision for Septic tank &Toilet cleaning charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
rajarethinam subramanian (BID ID -1399066)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .