| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | ₹7.4 L Quoted ₹4.9 L | L1 | Accepted-AOC l |
| 2 | L2₹4.9 LRejected-Finance | ₹4.9 L | L2 | Rejected-Finance high |
| Sl No | Description | Qty | Unit | V.KUMAR L1 | K.VISWANATHAN L2 |
|---|---|---|---|---|---|
| 1.00Consruction of Side Drainage with cover slab in Gopalakrishnan Street in Sennavarm Panchayat | |||||
| 2.00 | Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A. | 52.29 | Cum | 224 ₹11,712.96 | 225 ₹11,765.25 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 8.82 | Cum | 4,882 ₹43,059.24 | 4,890 ₹43,129.80 |
| 4.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 23.18 | Cum | 5,586 ₹1.3 L | 5,590 ₹1.3 L |
| 5.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and | 5.73 | Cum | 8,497 ₹48,687.81 | 8,500 ₹48,705 |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.5 | MT | 88,880 ₹44,440 | 88,890 ₹44,445 |
| 7.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc | 252 | Sqm | 476 ₹1.2 L | 480 ₹1.2 L |
| 8.00 | Plastering with Cement Mortar 1:4(one cement and five sand) 20 mm. thick in all floors including curing etc., complete complying with standard specification and as directed | 37.8 | Sqm | 516.42 ₹19,520.68 | 520 ₹19,656 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST 18 % Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 75,034 ₹75,034 | 75,283 ₹75,283 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
6 Jul 2023, 4:00 pmClosed
The Block Development Officer (B.Pt), Vandavasi Bl
The Block Development Officer (B.Pt), Vandavasi Block Tiruvannamalai District
Consruction of Side Drainage with cover slab in Gopalakrishnan Street in Sennavarm Panchayat of Vandavasi Block Thiruvannamalai Dist- General Fund (B.Pt) -2023-2024
2023_RDTN_333251_1
AS No A3/44/2023/ Dt.19.04.2023
Open Tender
Civil Works
180 days
The Block Development Officer (B.Pt), Vandavasi Bl
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,000
Yes
2 Apr 2026
29 Jun 2023
6 Jul 2023
29 Jun 2023
6 Jul 2023
29 Jun 2023
Amount
Consruction of Side Drainage with cover slab in Gopalakrishnan Street in Sennavarm Panchayat
Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
Plastering with Cement Mortar 1:4(one cement and five sand) 20 mm. thick in all floors including curing etc., complete complying with standard specification and as directed
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST 18 % Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.VISWANATHAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_395511.xls
BOQ • 0.33 MB
Tenderdocument.pdf
Tender Documents • 0.33 MB
Download all tender documents and submit your bid